Furnace structural integrity monitoring systems and methods
US-9791416-B2 · Oct 17, 2017 · US
US2024085110A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2024085110-A1 |
| Application number | US-202218263538-A |
| Country | US |
| Kind code | A1 |
| Filing date | Jan 27, 2022 |
| Priority date | Feb 10, 2021 |
| Publication date | Mar 14, 2024 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
To ensure stable supply of a cold iron source to a melting chamber, a method of producing molten iron uses an electric furnace that includes: a preheating chamber; a melting chamber; an extruder located in the preheating chamber; and a video device configured to observe an inside of the melting chamber, and comprises: an extrusion process of supplying a cold iron source preheated in the preheating chamber to the melting chamber by the extruder; and a melting process of melting the cold iron source supplied to the melting chamber by arc heat to obtain molten iron, wherein in the extrusion process, a moving amount of the extruder and/or a time interval for moving the extruder is controlled based on visual information obtained from the video device.
Opening claim text (preview).
1 . A method of producing molten iron using an electric furnace that includes a preheating chamber, and a melting chamber, wherein the electric furnace further includes an extruder located in the preheating chamber, and a video device configured to observe an inside of the melting chamber, and the method comprises: an extrusion process, performed in the preheating chamber, of supplying a cold iron source preheated in the preheating chamber to the melting chamber by the extruder; and a melting process, performed in the melting chamber, of melting the cold iron source supplied to the melting chamber by arc heat to obtain molten iron, wherein in the extrusion process, one or both of a moving amount of the extruder and a time interval for moving the extruder are controlled based on visual information obtained from the video device. 2 . The method of producing molten iron according to claim 1 , wherein in the extrusion process, one or both of increasing the moving amount and reducing the time interval are performed in the case where the visual information obtained from the video device indicates that the cold iron source is not supplied from the preheating chamber to the melting chamber. 3 . The method of producing molten iron according to claim 1 , wherein in the extrusion process, further, one or both of increasing the moving amount and reducing the time interval are performed in the case where an extrusion pressure of the extruder is 40 MPa or less. 4 . The method of producing molten iron according to claim 2 , wherein in the extrusion process, further, one or both of increasing the moving amount and reducing the time interval are performed in the case where an extrusion pressure of the extruder is 40 MPa or less.
in electric furnaces · CPC title
Charging of the electric furnace · CPC title
Preheating scrap · CPC title
Screw feeders; Screw dischargers · CPC title
Ram or pusher apparatus · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.