Evaluation apparatus, evaluation system, and evaluation method
US-2019384240-A1 · Dec 19, 2019 · US
US2022382233A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2022382233-A1 |
| Application number | US-202217824388-A |
| Country | US |
| Kind code | A1 |
| Filing date | May 25, 2022 |
| Priority date | May 28, 2021 |
| Publication date | Dec 1, 2022 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Regarding each of a plurality of operation patterns virtually generated in regard to the operation performed by a worker with respect to an actual plant, an information processing device uses plant data related to the operation of the actual plant and uses a virtual plant which follows the actual plant, and predicts the state transition of the actual plant in the case of implementing each operation pattern. Then, the information processing device outputs each operation pattern in a corresponding manner to the state transition of the actual plant as obtained by the virtual plant.
Opening claim text (preview).
What is claimed is: 1 . An information processing device comprising: a predicting unit that regarding each of a plurality of operation patterns virtually generated in regard to operation performed by a worker with respect to an actual plant, uses plant data related to operation of the actual plant and uses a virtual plant which follows the actual plant, and predicts state transition of the actual plant in case of implementing each of the plurality of operation patterns; and a display control unit that outputs each of the plurality of operation patterns in a corresponding manner to state transition of the actual plant as obtained by the virtual plant. 2 . The information processing device according to claim 1 , wherein using the virtual plant, the predicting unit predicts occurrence of an alarm which indicates a state that, after a first timing during operation of the actual plant, when each of the plurality of operation patterns is implemented, is outside scope of a predefined state of the actual plant, and the display control unit outputs each of the plurality of operation patterns in a corresponding manner to state transition and the alarm corresponding to concerned operation pattern. 3 . The information processing device according to claim 2 , wherein the display control unit displays, in a corresponding manner to each of the plurality of operation patterns, count of the alarm predicted to be output after the first timing. 4 . The information processing device according to claim 2 , wherein when each of the plurality of operation patterns is implemented, the predicting unit predicts, using the virtual plant, occurrence of an alarm with respect to a first-type target from among a plurality of targets in the actual plant, and occurrence of an alarm with respect to at least a single second-type target that is impacted by operation of the first-type target, and the display control unit outputs, in a corresponding manner to the first-type target, each of the plurality of operation patterns and the alarm occurring due to each of the plurality of operation patterns, and outputs, in a corresponding manner to the second-type target, each of the plurality of operation patterns and the alarm occurring due to each of the plurality of operation patterns. 5 . The information processing device according to claim 2 , wherein the display control unit displays in a corresponding manner to each of the plurality of operation patterns, and on identical time axis, implementation time of various operations with respect to an operation tag included in each operation pattern and occurrence time of various alarms predicted using the virtual plant. 6 . The information processing device according to claim 2 , wherein at a second timing arriving during operation of the actual plant, the predicting unit uses the plant data obtained in real time from the actual plant, and further predicts, in chronological order, state of the actual plant after the second timing, and the display control unit displays time series data that contains, in a corresponding manner, state of the actual plant, the plurality of operation patterns, and the alarm that is predicted using the virtual plant and that is predicted to be output after the second timing. 7 . The information processing device according to claim 1 , further comprising an obtaining unit that obtains information related to output of various alarms which are predicted using the virtual plant and which indicate that the actual plant is outside scope of a predefined state, wherein with respect to a monitoring terminal that monitors the virtual plant, the display control unit performs display control of the various alarms based on relationship of the various alarms on basis of information related to output of the various alarms. 8 . The information processing device according to claim 7 , wherein the display control unit displays, in chronological order, the various alarms according to output sequence, and regarding a plurality of same-type alarms related to each other from among the various alarms, highlights initially-output same-type alarm. 9 . The information processing device according to claim 8 , wherein the display control unit suppresses display of same-type alarms other than the initially-output same-type alarm from among the plurality of same-type alarms, or suppresses display of same-type alarms output after elapse of predetermined period of time since the initially-output same-type alarm. 10 . The information processing device according to claim 8 , wherein, after the plurality of same-type alarms are displayed, the display control unit hides same-type alarms that occur after timing at which a worker takes measure in the actual plant or the virtual plant. 11 . The information processing device according to claim 8 , wherein the display control unit extracts, as the same-type alarms from among the various alarms, alarms having same cause of occurrence or alarms having positional relationship on upstream side or downstream side with a device that is in the actual plant and that has caused occurrence of alarms. 12 . The information processing device according to claim 8 , wherein the obtaining unit further obtains, from the virtual plant, an operation pattern that is predicted by the virtual plant and that is related to operation to be performed by a worker with respect to the actual plant, and the display control unit displays on identical time axis, in chronological order, and in different format for each of the same-type alarms, various operations included in the operation pattern and the various alarms. 13 . A prediction method comprising: predicting, regarding each of a plurality of operation patterns virtually generated in regard to operation performed by a worker with respect to an actual plant, that includes using plant data related to operation of the actual plant and using a virtual plant which follows the actual plant, and predicting state transition of the actual plant in case of implementing each of the plurality of operation patterns; and outputting each of the plurality of operation patterns in a corresponding manner to state transition of the actual plant as obtained by the virtual plant. 14 . A computer-readable recording medium having stored therein a prediction program that causes a computer to perform a process comprising: predicting, regarding each of a plurality of operation patterns virtually generated in regard to operation performed by a worker with respect to an actual plant, that includes using plant data related to operation of the actual plant and using a virtual plant which follows the actual plant, and predicting state transition of the actual plant in case of implementing each of the plurality of operation patterns; and outputting each of the plurality of operation patterns in a corresponding manner to state transition of the actual plant as obtained by the virtual plant.
Use new conditions for model, check, calculate if model meets objectives · CPC title
characterised by modeling, simulation of the manufacturing system · CPC title
Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user · CPC title
Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks · CPC title
Monitoring, global and local alarms · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.