Method for dynamic water feeding and hole sealing using high water-absorbent resin
US-2019360336-A1 · Nov 28, 2019 · US
US2022205361A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2022205361-A1 |
| Application number | US-202017596840-A |
| Country | US |
| Kind code | A1 |
| Filing date | Nov 9, 2020 |
| Priority date | Sep 14, 2020 |
| Publication date | Jun 30, 2022 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A full-length screen pipe hole protection device and method with pressurized hole packing in a soft coal seam relates to the field of gas drainage technologies. The device includes a grouting system, a drainage system and a hole fixing system. The grouting system injects a pressurized sealing material into a borehole through a pressure pump to increase a sealing effect of the borehole. The drainage system drains gas in the middle of air holes on metal baffle plates and hole fixing screen pipes through a drainage pipe to increase flowability of gas. The hole fixing system is inside the borehole and fixed with the metal baffle plates, and the hole fixing screen pipes are fixedly connected with each other through fitting mouths and fitting buckles. The device is fixedly mounted in the gas drainage borehole. After hole packing, the drainage pipe is connected with a drainage pump to drain gas.
Opening claim text (preview).
1 - 9 . (canceled) 10 . A full-length screen pipe hole protection gas drainage method with pressurized hole packing in a soft coal seam, employing a full-length screen pipe hole protection device with pressurized hole packing in a soft coal seam comprising a drainage pipe, a sealing plug, a grouting pressure pump, a grouting pipe, a grout discharge pipe, a plurality of hole fixing screen pipes, and a plurality of metal baffle plates; the hole fixing screen pipes are fixed to a hole wall of a gas drainage borehole through the metal baffle plates, and the plurality of hole fixing screen pipes are fixedly connected sequentially by head-tail connection; the sealing plug is disposed in a hole mouth segment of the gas drainage borehole, and a sealed space is formed between two sealing plugs; the grouting pressure pump is connected to the grouting pipe, the grouting pipe is protruded into the sealed space, and the grout discharge pipe is in communication with the sealed space; the drainage pipe is penetrated through the sealed space, the hole fixing screen pipes and the metal baffle plates; a plurality of air holes are disposed uniformly on the metal baffle plate and the hole fixing screen pipe respectively; a drainage hole is disposed at the centers of the metal baffle plate and the sealing plug respectively, wherein a pipe diameter of the drainage pipe is equal to a hole diameter of the drainage hole; a pressurized sealing material is filled in the sealed space; the ingredients of the pressurized sealing material comprise: a silicate cement, a nano-silicon dioxide, sodium silicate, a styrene acrylic emulsion and water; a fitting mouth is disposed at one end of the hole fixing screen pipe, and a fitting buckle is disposed at the other end of the hole fixing screen pipe; the fitting mouth and the fitting buckle cooperate with each other;a sealing ring is disposed at both ends of the hole fixing screen pipe; wherein the method specially comprises: at step A, fixedly connecting the drainage pipe with the metal baffle plates and placing into a gas drainage borehole; at step B, placing the hole fixing screen pipes into the gas drainage borehole along the drainage pipe, and fixedly connecting the hole fixing screen pipes with the metal baffle plates; at step C, sequentially connecting the metal baffle plates with the hole fixing screen pipes; wherein a length of the hole fixing screen pipe is determined based on a length of the gas drainage borehole, each hole fixing screen pipe has a length of 1-3 m, and air holes are uniformly disposed on the hole fixing screen pipes; at step D, after the hole fixing screen pipes are mounted, disposing a sealing plug at an inner side of a hole mouth segment of the gas drainage borehole, wherein the sealing plug is closely attached to the metal baffle plate; wherein the sealing plug firstly mounted is closely attached to the outermost metal baffle plate of the borehole to ensure stability of in-borehole structure, a direction from a hole bottom of the borehole to a hole mouth of the borehole is an outward direction and a direction from the hole mouth to the hole bottom is an inward direction; at step E, disposing a sealing plug at a hole mouth position of the gas drainage borehole so that the two sealing plugs form a sealed space; at step F, connecting the grouting pipe and the grouting pressure pump such that the grouting pressure pump injects a pressurized sealing material into the sealed space through the grouting pipe and stops injection when the grout discharge pipe discharges grout; wherein in the pressurized sealing material, a mass ratio of water to the silicate cement is 0.4, an addition amount of the nano-silicon dioxide is 4% of a mass of the silicate cement, an addition amount of sodium silicate is 0.5% of the mass of the silicate cement, and an addition amount of the styrene-acrylate emulsion is 2% of the mass of the silicate cement; when the pressurized sealing material is prepared, the nano-silicon dioxide, sodium silicate and the styrene-acrylate emulsion are firstly mixed with water and stirred for 3 minutes and then added with the silicate cement, and then stirred until the materials are uniformly mixed; at step G, completing hole packing, and connecting the drainage pipe with a gas drainage system to carry out gas drainage. 11 . The method of claim 10 , wherein a pipe mouth of the grouting pipe is protruded to an inner side of the sealed space and a pipe mouth of the grout discharge pipe is protruded out of the sealed space.
as filling material for cavities or the like · CPC title
Injection moldable mixtures · CPC title
in mining operations, e.g. for backfilling; in making tunnels or galleries · CPC title
Screens comprising porous materials, e.g. prepacked screens · CPC title
Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.