A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An apparatus and a method for relieving a tension strand, in particular a tension strand of a prestressed tower, preferably a prestressed concrete tower of a wind power plant. Furthermore, the disclosure relates to a method for dismantling a prestressed tower and to the use of an apparatus. The apparatus comprises a first anchoring unit with a first tension strand receptacle for a first section of the tension strand, a second anchoring unit with a second tension strand receptacle for a second section of the tension strand, and a lifting unit which is configured to change a spacing between the first and second anchoring unit.
Opening claim text (preview).
1 . An apparatus for relieving a tension strand of a prestressed tower of a wind power plant the apparatus comprising: a first anchoring unit with a first tension strand receptacle for receiving a first section of the tension strand, a second anchoring unit with a second tension strand receptacle for receiving a second section of the tension strand, a lifting unit configured to change a spacing between the first and second anchoring units. 2 . The apparatus as claimed in claim 1 , wherein the lifting unit is configured to increase and/or decrease the spacing between the first and second anchoring units. 3 . The apparatus as claimed in claim 1 , wherein the lifting unit connects the first and second anchoring units and is arranged between the first and second anchoring units. 4 . The apparatus as claimed in claim 1 wherein the lifting unit is a hydraulic cylinder or a spindle lifting mechanism. 5 . The apparatus as claimed in claim 1 wherein at least one of the first anchoring unit or the second anchoring unit is configured in two pieces. 6 . The apparatus as claimed in claim 1 wherein at least one of the first anchoring unit or the second anchoring unit has a first anchor base and a first anchor plate. 7 . The apparatus as claimed in claim 1 wherein at least one of the first anchoring unit and the second anchoring unit has a length, a width, and a depth, the depth being multiple times smaller than the width and/or the length. 8 . The apparatus as claimed in claim 1 wherein at least one of the first anchoring unit or the second anchoring unit has a first clamping unit, the first clamping unit and the second anchoring unit being arranged at least in sections in the first and second tension strand receptacles, respectively. 9 . A method for relieving a tension strand of a prestressed tower of a wind power plant, the method comprising: arranging a first section of the tension strand in a first tension strand receptacle, and anchoring the first section of the tension strand in a first anchoring unit, arranging a second section of the tension strand in a second tension strand receptacle, and anchoring the second section of the tension strand in a second anchoring unit, and changing a spacing between the first and second anchoring units using a lifting unit. 10 . The method as claimed in claim 9 , wherein changing the spacing between the first and second anchoring units using the lifting unit comprises increasing a spacing of the tension strand with respect to an adjacent tension strand and/or with respect to a tower wall. 11 . The method as claimed in claim 9 , wherein changing the spacing between the first and second anchoring units using the lifting unit comprises decreasing the spacing between the first and second anchoring unit. 12 . The method as claimed in claim 9 , further comprises severing of the tension strand between the first and second anchoring units. 13 . The method as claimed in claim 9 , further increasing the spacing between the first and second anchoring units. 14 . A method for dismantling a prestressed tower of a wind power plant, the method comprising: relieving of at least one tension strand using the apparatus as claimed in claim 1 ; and removing the at least one tension strand and/or tower segments. 15 . (canceled) 16 . The method as claimed in claim 14 , wherein the at least one tension strand is a plurality of tension strands. 17 . The apparatus as claimed in claim 1 wherein the prestressed tower is a prestressed concrete tower of the wind power plant. 18 . The method as claimed in claim 10 , wherein increasing the spacing of the tension strand comprises using an air cushion.
Prestressed structures · CPC title
Disassembly methods · CPC title
Wind turbines with rotation axis in wind direction · CPC title
Construction of stressing jacks · CPC title
Related publications grouped by family.