Plant complex for producing steel and a method for operating the plant complex

US2021238700A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2021238700-A1
Application numberUS-201915734745-A
CountryUS
Kind codeA1
Filing dateJun 3, 2019
Priority dateJun 7, 2018
Publication dateAug 5, 2021
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A plant complex for producing steel, having a blast furnace for producing pig iron; a converter steel works for producing crude steel; a gas pipeline system for gases that occur in the production of pig iron and/or the production of crude steel; a chemical plant and/or a biotechnology plant which are/is connected to the gas pipeline system, wherein the plant complex additionally includes a biogas plant which is connected to the gas pipeline system.

First claim

Opening claim text (preview).

1 .- 15 . (canceled) 16 . A plant complex for producing steel, comprising a blast furnace for producing pig iron; a converter steel works for producing crude steel; a gas pipeline system for gases that occur in the production of pig iron and/or the production of crude steel; a chemical plant and/or a biotechnology plant which are/is connected to the gas pipeline system, and a biogas plant which is connected to the gas pipeline system. 17 . The plant complex of claim 16 wherein the plant complex further comprises a coke oven plant which is connected to the gas pipeline system. 18 . The plant complex of claim 16 wherein the plant complex further comprises at least one hydrogen generation plant which is connected to the gas pipeline system. 19 . The plant complex of claim 16 wherein the plant complex further comprises a biosynthesis gas generation plant. 20 . The plant complex of claim 16 wherein the plant complex further comprises a power generation plant for electricity, wherein the power generation plant is a gas-turbine power generation plant or a gas-turbine and steam-turbine power generation plant and is operated with a gas that comprises a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the converter steel works and/or a partial amount of the biogas that occurs in the biogas plant and/or a partial amount of the coke oven gas that occurs in the coke oven plant and/or a partial amount of the biosynthesis gas that occurs in the biosynthesis gas generation plant and/or a partial amount of the hydrogen that occurs in the hydrogen generation plant. 21 . The plant complex of claim 16 wherein the gas pipeline system comprises at least one operatively controllable gas diverter for dividing the streams of gas that are fed to the chemical plant and/or the biotechnology plant and/or the hydrogen generation plant and/or the power generation plant and/or the coke oven plant and/or the blast furnace and/or the converter steel works and/or the biosynthesis gas generation plant. 22 . The plant complex of claim 16 wherein the gas pipeline system in the flow direction upstream of the at least one operatively controllable gas diverter has at least one mixing device for producing a mixed gas composed of blast-furnace top gas and/or converter gas and/or biogas and/or coke oven gas and/or hydrogen and/or oxygen and/or biosynthesis gas, and in that streams of gas that are fed to the chemical plant and/or the biotechnology plant and/or the hydrogen generation plant and/or the power generation plant and/or the coke oven plant and/or the blast furnace and/or the converter steel works and/or the biosynthesis gas generation plant are able to be controlled by means of the operatively controllable gas diverter. 23 . The plant complex of claim 16 wherein the plant complex further comprises an energy accumulator for providing at least part of the electricity requirement of the plant complex. 24 . The plant complex of claim 16 wherein the plant complex further comprises a gas purification and/or gas conditioning plant. 25 . A method for operating a plant complex including a blast furnace for producing pig iron, a converter steel works for producing crude steel, a biogas plant for producing biogas, a gas pipeline system for gases that occur in the production of pig iron and/or the production of crude steel and/or the production of biogas, and a chemical plant and/or a biotechnology plant, the method comprising: using at least a partial amount of the biogas that occurs in the biogas plant and a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the production of crude steel are/is for operating the chemical plant and/or the biotechnology plant and/or the blast furnace for the production of pig iron and/or the converter steel works for the production of crude steel. 26 . The method for operating a plant complex of claim 25 wherein the plant complex further comprises a coke oven plant which is connected to the gas pipeline system, wherein at least a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the production of crude steel and/or a partial amount of the biogas that occurs in the biogas plant and/or a partial amount of the coke oven gas that occurs in the production of coke in the coke oven plant are/is used as useful gas for operating the chemical plant and/or the biotechnology plant and/or the blast furnace for the production of pig iron and/or the converter steel works for the production of crude steel and/or the coke oven plant. 27 . The method for operating a plant complex of claim 25 wherein the plant complex further comprises a hydrogen generation plant which is connected to the gas pipeline system, wherein at least a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the production of crude steel and/or a partial amount of the biogas that occurs in the biogas plant and/or a partial amount of the coke oven gas that occurs in the production of coke in the coke oven plant and/or a partial amount of the hydrogen that occurs in the hydrogen generation plant are/is used as useful gas for operating the chemical plant and/or the biotechnology plant and/or the blast furnace for the production of pig iron and/or the converter steel works for the production of crude steel and/or the coke oven plant and/or the hydrogen generation plant. 28 . The method for operating a plant complex of claim 25 wherein the plant complex further additionally comprises a biosynthesis gas generation plant which is connected to the gas pipeline system, wherein at least a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the production of crude steel and/or a partial amount of the biogas that occurs in the biogas plant and/or a partial amount of the coke oven gas that occurs in the production of coke in the coke oven plant and/or a partial amount of the hydrogen that occurs in the hydrogen generation plant and/or a partial amount of the biosynthesis gas that occurs in the biosynthesis gas generation plant are/is used as useful gas for operating the chemical plant and/or the biotechnology plant and/or the blast furnace for the production of pig iron and/or the converter steel works for the production of crude steel and/or the coke oven plant and/or the hydrogen generation plant and/or the biosynthesis gas generation plant. 29 . The method for operating a plant complex of claim 25 wherein the plant complex further comprises a power generation plant which is connected to the gas pipeline system, wherein at least a partial amount of the blast-furnace top gas that occurs in the production of pig iron in the blast furnace and/or a partial amount of the converter gas that occurs in the production of crude steel and/or a partial amount of the biogas that occurs in the biogas plant and/or a partial amount of the coke oven gas that occurs in the production of coke in the coke oven plant and/or a partial amount of the hydrogen that occurs in the hydrogen generation plant and/or a partial amount of the biosynthesis gas that occurs in the biosynthesis gas generation plant are/is used as useful gas

Assignees

Inventors

Classifications

  • Multi-stage processes {processes carried out in different vessels or furnaces} · CPC title

  • C21B5/06Primary

    using top gas in the blast furnace process · CPC title

  • Process efficiency · CPC title

  • Evacuating and treating of exhaust gases · CPC title

  • Removal of waste gases or dust · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2021238700A1 cover?
A plant complex for producing steel, having a blast furnace for producing pig iron; a converter steel works for producing crude steel; a gas pipeline system for gases that occur in the production of pig iron and/or the production of crude steel; a chemical plant and/or a biotechnology plant which are/is connected to the gas pipeline system, wherein the plant complex additionally includes a biog…
Who is the assignee on this patent?
Thyssenkrupp Ind Solutions Ag, Thyssenkrupp Ag
What technology area does this patent fall under?
Primary CPC classification C21B5/06. Mapped technology areas include Chemistry & Metallurgy.
When was this patent published?
Publication date Thu Aug 05 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).