Automated construction of towers and columns
US-2018371785-A1 · Dec 27, 2018 · US
US2021108615A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2021108615-A1 |
| Application number | US-201917043507-A |
| Country | US |
| Kind code | A1 |
| Filing date | Apr 8, 2019 |
| Priority date | Apr 16, 2018 |
| Publication date | Apr 15, 2021 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The object is attained by a method of erecting a wind turbine tower having a plurality of tower segments which are tensioned by means of tensioning members. A plurality of tensioning members is provided and a fixing unit is fixed at an end of the tensioning members. Fixing of the fixing unit is effected by placing a multi-part wedge unit at a free end of the tensioning members which comprise a plurality of tensioning wires. A sleeve is fitted over the wedge unit and a pulling tab is fixed on or at the sleeve. The pulling tab has an opening. A cable is fixed at or in the hole in the pulling tab. The cable with the fixing unit and thus the tensioning members is pulled upwardly. The fixing unit is fixed at a segment of the tower, that is to be fixed. The sleeve is removed before the tensioning member is braced.
Opening claim text (preview).
1 . A method comprising: erecting a wind turbine tower having a plurality of tower segments tensioned by tensioning members, the method comprising: fixing a fixing unit at first ends of tensioning members, wherein fixing the fixing unit includes: placing a multi-part wedge unit at the first ends of the tensioning members, wherein the tensioning members comprise a plurality of tensioning wires; fitting a sleeve over the multi-part wedge unit; and fixing a pulling tab on or at the sleeve, wherein the pulling tab has an opening; fixing a cable at the opening in the pulling tab; pulling the cable with the fixing unit and the tensioning member upwardly; fixing the fixing unit to a segment of the tower for tensioning the plurality of tensioning members; and removing the sleeve over the multi-part wedge unit, wherein the sleeve is removed before the plurality of tensioning members are placed in tension. 2 . The method as claimed in claim 1 further comprising removing the pulling tab from the sleeve before the fixing unit is fixed to the segment. 3 . The method as claimed in claim 2 wherein removing the pulling tab comprises using the cable to remove the pulling tab. 4 . The method as claimed in claim 1 wherein second ends of the plurality of tensioning wires are coupled in a region of the foundation. 5 . The method as claimed in claim 1 wherein pulling the cable with the fixing unit and the tensioning member upwardly comprises using a roller system to pull the cable with the fixing unit and the tensioning member upwardly.
Prestressed structures · CPC title
the tensile members are anchored by wedge-action · CPC title
of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements · CPC title
Manufacturing or production processes characterised by the final manufactured product · CPC title
Assembly of wind motors; Arrangements for erecting wind motors · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.