Compaction system including articulated joint force measurement
US-9845580-B2 · Dec 19, 2017 · US
US2020217033A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2020217033-A1 |
| Application number | US-202016823924-A |
| Country | US |
| Kind code | A1 |
| Filing date | Mar 19, 2020 |
| Priority date | Dec 14, 2017 |
| Publication date | Jul 9, 2020 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method includes receiving first information indicative of a location of a perimeter of a worksite surface, and receiving second information indicative of compaction requirements specific to the worksite surface. The method also includes generating a compaction plan based at least partly on the first and second information. Such a compaction plan includes a travel path for a compaction machine. In such a method, the travel path is substantially within the perimeter of the worksite surface. The method also includes causing at least part of the travel path to be displayed via a control interface of the compaction machine. The method further includes receiving an input indicative of approval of the travel path, and controlling operation of the compaction machine on the worksite surface, in accordance with the compaction plan, based at least partly on receiving the input.
Opening claim text (preview).
What is claimed is: 1 . A method, comprising: receiving, with one or more processors, first information indicative of a perimeter of a worksite surface, the worksite surface being disposed at a worksite; receiving, with the one or more processors, second information indicative of requirements specific to the worksite surface; generating, with the one or more processors, a plan based at least partly on the first and second information, the plan indicating one or more operations to be performed by a machine at the worksite and wherein generating the plan includes determining, for the machine, a travel path substantially within the perimeter of the worksite surface; and causing, with the one or more processors, the machine to perform the one or more operations on the worksite surface, in accordance with the plan. 2 . The method of claim 1 , further including: receiving, with the one or more processors, third information indicative of a property of a portion of the worksite surface located along the determined travel path; and adjusting the one or more operations as the machine traverses the determined travel path, based at least partly on the third information. 3 . The method of claim 1 , wherein: the machine is a compaction machine. 4 . The method of claim 3 , further comprising: receiving third information indicative of a property of a portion of the worksite surface located along the determined travel path; and adjusting the one or more operations as the machine traverses the determined travel path, based at least partly on the third information, wherein adjusting the one or more operations includes adjusting at least one of a vibration frequency of a drum connected to the machine and a vibration amplitude of the drum. 5 . The method of claim 1 , further comprising: causing at least part of the determined travel path to be displayed; and receiving an input indicating approval of the determined travel path, wherein causing the machine to perform the one or more operations on the worksite surface is based at least partly on receiving the input. 6 . The method of claim 5 , wherein: the at least part of the determined travel path is displayed via a control interface of the machine; and the input is received via the control interface of the machine. 7 . The method of claim 1 , wherein: the one or more processors are disposed at a location offboard of the machine. 8 . A method, comprising: receiving, with one or more processors, first information indicative of a perimeter of a worksite surface, the worksite surface being disposed at a worksite; receiving, with the one or more processors, second information indicative of compaction requirements specific to the worksite surface; generating, with the one or more processors, a compaction plan based at least partly on the first and second information, the compaction plan indicting one or more operations to be performed by a compaction machine at the worksite and wherein generating the compaction plan includes determining, for the compaction machine, a travel path substantially within the perimeter of the worksite surface; and causing, with the one or more processors, the compaction machine to perform the one or more operations on the worksite surface, in accordance with the compaction plan. 9 . The method of claim 8 , further comprising: causing at least part of the determined travel path to be displayed; and receiving an input indicating approval of the determined travel path, wherein causing the compaction machine to perform the one or more operations on the worksite surface is based at least partly on receiving the input. 10 . The method of claim 9 , wherein: the at least part of the determined travel path is displayed via a control interface of the compaction machine; and the input is received via the control interface of the compaction machine. 11 . The method of claim 8 , wherein: the one or more processors are disposed at a position offboard of the compaction machine. 12 . The method of claim 8 , further including: receiving, with the one or more processors, third information indicative of a property of a portion of the worksite surface located along the determined travel path; and adjusting the one or more operations as the compaction machine traverses the determined travel path, based at least partly on the third information. 13 . The method of claim 12 , wherein adjusting the one or more operations includes adjusting compaction operation of a drum of the compaction machine relative to the worksite surface. 14 . A control system, comprising: a control interface connected to a machine; and one or more processors remote from the machine and in communication with the control interface, the one or more processors configured to: receive first information indicative of a perimeter of a worksite surface, the worksite surface disposed at a worksite, receive second information indicative of requirements specific to the worksite surface, generate a plan based at least partly on the first and second information, the plan indicating one or more operations to be performed by the machine at the worksite and wherein generating the plan includes determining, for the machine, a travel path substantially within the perimeter of the worksite surface, and causing the machine to perform the one or more operations on the worksite surface, in accordance with the plan. 15 . The control system of claim 14 , wherein the one or more processors are further configured to: receive third information indicative of a property of a portion of the worksite surface located along the determined travel path; and adjust the one or more operations as the machine traverses the determined travel path, based at least partly on the third information. 16 . The control system of claim 15 , wherein: the machine is a compaction machine. 17 . The control system of claim 16 , wherein adjusting the one or more operations includes adjusting at least one of a vibration frequency of a drum connected to the machine and a vibration amplitude of the drum. 18 . The control system of claim 17 , wherein the control system is further configured to: cause at least part of the determined travel path to be displayed; and receive an input indicating approval of the determined travel path, wherein causing the machine to perform the one or more operations on the worksite surface is based at least partly on receiving the input. 19 . The control system of claim 18 , wherein: the at least part of the determined travel path is displayed via a control interface of the machine; and the input is received via the control interface of the machine. 20 . The control system of claim 14 , wherein the one or more processors are further configured to: cause at least part of the determined travel path to be displayed; and receive an input indicative of approval of the determined travel path, wherein causing the machine to perform the one or more operations on the worksite surface is based at least partly on receiving the input.
self-propelled, e.g. with an own traction-unit (E01C19/285 - E01C19/288 take precedence) · CPC title
pedestrian-controlled, e.g. with safety arrangements for operator · CPC title
comprising sensor means · CPC title
by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D3/026, E02D3/08 take precedence; generating or transmitting mechanical vibrations for performing mechanical work in general B06B; tamping or vibrating apparatus for working ballast or railways E01B27/00, for consolidating paving materials E01C19/30, for consolidating concrete in general E04G21/06) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.