System for managing component mounting line

US2020100410A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2020100410-A1
Application numberUS-201716471803-A
CountryUS
Kind codeA1
Filing dateJan 5, 2017
Priority dateJan 5, 2017
Publication dateMar 26, 2020
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system including: an automatic exchanging device configured to move along the multiple component mounters arranged in a line and automatically exchange automatically exchangeable units of the component mounters; an operation monitoring device configured to monitor an operation state of the automatically exchangeable units of the component mounters and monitor whether it is necessary to exchange the automatically exchangeable units due to maintenance or a breakdown; and a management device configured to, when the operation monitoring device determines that exchange of one of the automatically exchangeable units of the component mounters is necessary due to maintenance or a breakdown, move the automatic exchanging device to the component mounter in question and cause the automatic exchanging device to perform automatic exchange of the automatically exchangeable unit of the component mounter with an exchange-use unit.

First claim

Opening claim text (preview).

1 .- 9 . (canceled) 10 . A system for managing a component mounting line configured from multiple component mounters arranged in a line along a conveyance path of a circuit board, the component mounters producing a component-mounted board by mounting component on the circuit board, the system comprising: an automatic exchanging device configured to move along the multiple component mounters arranged in a line and automatically exchange automatically exchangeable units of the component mounters; an operation monitoring device configured to monitor an operation state of the automatically exchangeable units of the component mounters and monitor whether it is necessary to exchange the automatically exchangeable units due to maintenance or a breakdown; and a management device configured to, when the operation monitoring device determines that exchange of one of the automatically exchangeable units of the component mounters is necessary due to maintenance or a breakdown, move the automatic exchanging device to the component mounter in question and cause the automatic exchanging device to perform automatic exchange of the automatically exchangeable unit of the component mounter with an exchange-use unit. 11 . The system for managing the component mounting line according to claim 10 , wherein the automatically exchangeable unit is any of a feeder configured to supply components, a suction nozzle configured to pick up the component, a chuck configured to grasp the component, or a mounting head configured to hold the suction nozzle or the chuck. 12 . The system for managing the component mounting line according to claim 10 , wherein the component mounting line is provided with a storage compartment configured to store exchange-use units to be exchanged with the automatically exchangeable units of the multiple component mounters, and the automatic exchanging device is configured to, in accordance with an instruction from the management device, receive the exchange-use unit from the storage compartment, move to the component mounter at which automatic exchange is to be performed, automatically exchange the automatically exchangeable unit of the component mounter with the exchange-use unit, and load the collected automatically exchangeable unit in the storage compartment. 13 . The system for managing component mounting line according to claim 12 , further comprising a unit transport device configured to move to and from a work location at which an operator performs work and the storage compartment, wherein at the work location, an operator loads the exchange-use unit on the unit transport device, the unit transport device moves to the storage compartment, loads the exchange-use unit into the storage compartment, loads the exchanged automatically exchangeable unit collected in the storage compartment on the unit transport device, and returns to the work location. 14 . The system for managing the component mounting line according to claim 13 , wherein the work location and the unit transport device are shared between multiple component mounting lines. 15 . The system for managing the component mounting line according to claim 10 , wherein the operation monitoring device is provided on each the component mounters, and the operation monitoring device is configured to monitor at least one of a tape feeding time of a feeder that is the automatically exchangeable unit of the component mounter, a flow amount or a nozzle length of a suction nozzle that is the automatically exchangeable unit of the component mounter, or an axis movement time or valve operation time of a mounting head that is the automatically exchangeable unit of the component mounter, and to monitor whether it is necessary to exchange the automatically exchangeable units due to maintenance or a breakdown based on whether a specified value of the at least one of the tape feeding time, the flow amount, the nozzle length, the axis movement time, or the valve operation time exceeds a specified threshold. 16 . The system for managing the component mounting line according to claim 10 , wherein the operation monitoring device is provided with a determination criteria changing section configured to allow an operator to change a determination criteria used to determine whether it is necessary to exchange the automatically exchangeable unit due to maintenance or a breakdown. 17 . The system for managing the component mounting line according to claim 10 , wherein the operation monitoring device is configured to send, in advance, to the management device, information related to the automatically exchangeable unit for a case in which it was possible to predict a timing at which exchange of the automatically exchangeable unit of the component mounter is required due to maintenance or a breakdown, and the management device is configured to, when the information related to the exchange of the automatically exchangeable unit of the component mounter is received in advance from the operation monitoring device, as preparation for exchange of the automatically exchangeable unit, move the automatic exchanging device to or near to the component mounter. 18 . The system for managing the component mounting line according to claim 10 , wherein each component mounter is provided with a stock section configured to temporarily accommodate the exchange-use unit and the collected automatically exchangeable unit that has been exchanged, and the management device is configured to, as preparation for exchange of the automatically exchangeable unit of each component mounter, use a period in which the automatic exchanging device is not going to perform automatic exchange of the automatically exchangeable unit to move the automatic exchanging device to each of the component mounters, accommodate the exchange-use unit in the stock section, and collect the automatically exchangeable unit that has been exchanged from the stock section.

Assignees

Inventors

Classifications

  • tape feeders · CPC title

  • Maintenance systems or processes, e.g. indicating need for maintenance · CPC title

  • Supply management, e.g. supply of components or of substrates · CPC title

  • Loading or unloading of containers (H05K13/028 takes precedence) · CPC title

  • Feeding with belts or tapes · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2020100410A1 cover?
A system including: an automatic exchanging device configured to move along the multiple component mounters arranged in a line and automatically exchange automatically exchangeable units of the component mounters; an operation monitoring device configured to monitor an operation state of the automatically exchangeable units of the component mounters and monitor whether it is necessary to exchan…
Who is the assignee on this patent?
Fuji Corp
What technology area does this patent fall under?
Primary CPC classification H05K13/0895. Mapped technology areas include Electricity.
When was this patent published?
Publication date Thu Mar 26 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).