Method for producing functional film, control device, and control method

US2017113247A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2017113247-A1
Application numberUS-201615297686-A
CountryUS
Kind codeA1
Filing dateOct 19, 2016
Priority dateOct 23, 2015
Publication dateApr 27, 2017
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A coating amount is adjusted based on a result of the inspecting step, then the coating amount is not adjusted during a standby period (Wt) which is a time taken to transfer the film from a coating section ( 21 ) to an inspecting section ( 26 ), and then the coating amount is adjusted based on the result of the inspecting step after the standby period has elapsed. With the configuration, an amount of a coating layer on a film base material is stabilized.

First claim

Opening claim text (preview).

1 . A method for producing a functional film comprising: coating step of coating a film base material with a coating material in a coating section; processing step of processing an applied coating material in a processing section; and inspecting step of inspecting a film obtained by the coating step in an inspecting section, wherein a coating amount is adjusted based on a result of the inspecting step, then the coating amount is not adjusted during a standby period which is a time taken to transfer the film from the coating section to the inspecting section, and then the coating amount is adjusted based on a result of the inspecting step after the standby period has elapsed. 2 . The method as set forth in claim 1 , wherein: in the inspecting step, a physical quantity is measured for obtaining an amount of the coating material on the film base material before the processing step or for obtaining an amount of a coating layer on the film base material after the processing step. 3 . The method as set forth in claim 2 , wherein: in a case where the physical quantity which has been measured crosses a threshold, the coating amount is adjusted. 4 . The method as set forth in claim 3 , wherein: in a case where a difference between the physical quantity which has been measured and a criterion value of the physical quantity is greater than a tolerance, the coating amount is changed by an adjustment value that is obtained by dividing the difference by a ratio of a change in physical quantity relative to a change in coating amount. 5 . The method as set forth in claim 4 , wherein: in a case where the adjustment value is greater than a predetermined value, the coating amount is changed by the predetermined value. 6 . The method as set forth claim 2 , wherein: the physical quantity is a weight per unit area or a thickness of the film; or the physical quantity is a weight per unit area or a thickness of a part of the film excluding the film base material. 7 . The method as set forth in claim 1 , wherein: the inspecting step is carried out after the processing step. 8 . The method as set forth in claim 1 , wherein: the processing step includes drying the coating material on the film base material. 9 . The method as set forth in claim 1 , wherein: the coating step is carried out with a gravure coater method; and the coating amount corresponds to a rotation ratio of a gravure roll. 10 . The method as set forth in claim 1 , wherein: the coating step is carried out with a bar coater method; and the coating amount corresponds to an amount of a gap between a coating bar and the film. 11 . The method as set forth in claim 1 , wherein: the coating step is carried out with a die coater method; and the coating amount corresponds to a supplied liquid amount from a nozzle. 12 . The method as set forth in claim 1 , wherein the functional film is a battery separator. 13 . A control device for controlling a production apparatus for producing a functional film, wherein: the production apparatus includes (i) a coating section for coating a film base material with a coating material, (ii) a processing section for processing the coating material which has been applied, and (iii) an inspecting section for inspecting a film which has been coated; and a coating amount is adjusted based on a result of inspection carried out by the inspecting section, then the coating amount is not adjusted during a standby period which is a time taken to transfer the film from the coating section to the inspecting section, and then the coating amount is adjusted based on the result of inspection carried out by the inspecting section after the standby period has elapsed. 14 . A method for controlling a production apparatus for producing a functional film, wherein: the production apparatus includes (i) a coating section for coating a film base material with a coating material, (ii) a processing section for processing the coating material which has been applied, and (iii) an inspecting section for inspecting a film which has been coated; and a coating amount is adjusted based on a result of inspection carried out by the inspecting section, then the coating amount is not adjusted during a standby period which is a time taken to transfer the film from the coating section to the inspecting section, and then the coating amount is adjusted based on the result of inspection carried out by the inspecting section after the standby period has elapsed.

Assignees

Inventors

Classifications

  • Li-accumulators · CPC title

  • Natural polymers · CPC title

  • comprising three or more layers · CPC title

  • Polyamide resins · CPC title

  • comprising layers of only organic material and layers containing inorganic material · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2017113247A1 cover?
A coating amount is adjusted based on a result of the inspecting step, then the coating amount is not adjusted during a standby period (Wt) which is a time taken to transfer the film from a coating section ( 21 ) to an inspecting section ( 26 ), and then the coating amount is adjusted based on the result of the inspecting step after the standby period has elapsed. With the configuration, an amo…
Who is the assignee on this patent?
Sumitomo Chemical Co
What technology area does this patent fall under?
Primary CPC classification B05D3/007. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Thu Apr 27 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).