Hydrocarbon extraction well and a method of construction thereof

US2017022761A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2017022761-A1
Application numberUS-201514968292-A
CountryUS
Kind codeA1
Filing dateDec 14, 2015
Priority dateJul 23, 2015
Publication dateJan 26, 2017
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for forming a leg junction in a well is provided. The method includes drilling a vertical leg upto a first predetermined depth to form a well bore. The method also includes underreaming the vertical leg at a junction location in the vertical leg to form a first junction section. The method further includes infusing a binding material in the first junction section. The method also includes drilling a lateral leg upto a first predetermined distance through a sidewall of the first junction section. The method further includes underreaming the lateral leg through the sidewall of the first junction section to form a second junction section. The method also includes infusing the binding material in the first junction section and the second junction section to form the leg junction between the vertical leg and the lateral leg.

First claim

Opening claim text (preview).

1 . A method comprising: drilling a vertical leg upto a first predetermined depth to form a well bore; underreaming the vertical leg at a junction location in the vertical leg to form a first junction section; infusing a binding material in the first junction section; drilling a lateral leg upto a first predetermined distance through a sidewall of the first junction section; underreaming the lateral leg through the sidewall of the first junction section to form a second junction section; and infusing the binding material in the first junction section and the second junction section to form a leg junction between the vertical leg and the lateral leg. 2 . The method of claim 1 , further comprising drilling the vertical leg to a second predetermined depth through the first junction section at the junction location, prior to drilling the lateral leg. 3 . The method of claim 1 , further comprising installing a directional device in the first junction section at the junction location in the vertical leg prior to drilling the lateral leg. 4 . The method of claim 3 , further comprising removing the directional device from the first junction section at the junction location and installing a retrievable bridge plug in the first junction section prior to infusing the binding material in the first junction section and the second junction section. 5 . The method of claim 4 , further comprising removing the retrievable bridge plug and drilling the vertical leg to a second predetermined depth through the first junction section. 6 . The method of claim 1 , further comprising drilling the lateral leg upto a second predetermined distance through the second junction section after infusing the binding material in the first junction section and the second junction section. 7 . The method of claim 6 , further comprising installing a liner from the second junction section in the lateral leg. 8 . A well comprising: a vertical leg; one or more lateral legs in fluid communication with the vertical leg; and one or more leg junctions formed using a binding material, wherein the one or more lateral legs are connected to the vertical leg at one or more leg junctions. 9 . The well of claim 8 , wherein each of the one or more leg junctions comprise a first junction section and a second junction section. 10 . The well of claim 9 , wherein the first junction section is formed along the vertical leg and the second junction section is formed along the lateral leg. 11 . The well of claim 8 , wherein at least one of the one or more lateral legs, is a production leg. 12 . The well of claim 11 , wherein the vertical leg is a disposal leg coupled to a subterranean water disposal zone. 13 . The well of claim 8 , wherein at least one of the one or more lateral legs is a disposal leg. 14 . The well of claim 8 , further comprising a liner disposed extending from a second junction section of the leg junction within the lateral leg. 15 . The well of claim 8 , further comprising a casing installed within the vertical leg. 16 . The well of claim 8 , further comprising one or more downhole separators disposed in the one or more leg junctions. 17 . The well of claim 8 , further comprising a first isolation packer disposed at a first end and a second isolation packer disposed at a second end of each of the leg junctions in the vertical leg. 18 . The well of claim 17 , further comprising an electrical submersible pump provided above the first isolation packer, in the vertical leg.

Assignees

Inventors

Classifications

  • Obtaining from a multiple-zone well · CPC title

  • E21B7/06Primary

    Deflecting the direction of boreholes · CPC title

  • Methods or devices for cementing, for plugging holes, crevices or the like · CPC title

  • Packers; Plugs (used for cementing E21B33/134, E21B33/16) · CPC title

  • Adaptation of pump systems with down-hole electric drives · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2017022761A1 cover?
A method for forming a leg junction in a well is provided. The method includes drilling a vertical leg upto a first predetermined depth to form a well bore. The method also includes underreaming the vertical leg at a junction location in the vertical leg to form a first junction section. The method further includes infusing a binding material in the first junction section. The method also inclu…
Who is the assignee on this patent?
Gen Electric
What technology area does this patent fall under?
Primary CPC classification E21B7/06. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Thu Jan 26 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).