Use of traffic load reduction indicator for facilitating mobility management entity overload control function

US2016366607A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2016366607-A1
Application numberUS-201514736082-A
CountryUS
Kind codeA1
Filing dateJun 10, 2015
Priority dateJun 10, 2015
Publication dateDec 15, 2016
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

In accordance with one example embodiment, there is provided a method that includes determining whether a received overload message includes a traffic load reduction indication element; determining a percentage of network elements to which to relay the received overload message if the received overload message includes the traffic load reduction indication element; and selecting ones of the network elements to which to send the received overload message based on the determined percentage. The method may further include modifying the received message to change a value of the traffic load reduction indication element; and sending the modified message to the selected ones of the network elements. In some embodiments, the received overload message includes a mobility management element (“MME”) START message.

First claim

Opening claim text (preview).

What is claimed is: 1 . A method comprising: determining whether a received overload message includes a traffic load reduction indication element; determining a percentage of network elements to which to relay the received overload message if the received overload message includes the traffic load reduction indication element; selecting ones of the network elements to which to send the received overload message based on the determined percentage; modifying the received message to change a value of the traffic load reduction indication element; and sending the modified message to the selected ones of the network elements. 2 . The method of claim 1 , wherein the received overload message comprises a mobility management element (“MME”) START message. 3 . The method of claim 1 further comprising sending the received overload message to all of the network elements if the received overload message does not include the traffic load reduction indication element. 4 . The method of claim 1 further comprising sending the received overload message to a configurable percentage of the network elements if the received overload message does not include the traffic load reduction indication element. 5 . The method of claim 1 , wherein each of the network elements comprises a Home eNodeB (“HeNB”). 6 . The method of claim 1 further comprising, prior to the determining whether the received overload message includes a traffic load reduction indication element, receiving at a gateway element the overload message. 7 . The method of claim 6 , wherein the gateway element comprises an HeNB gateway disposed between an MME and the network elements. 8 . The method of claim 1 , wherein upon receipt of the modified overload message, the selected network elements perform traffic filtering based on the modified overload message. 9 . One or more non-transitory tangible media that includes code for execution and when executed by a processor is operable to perform operations comprising: determining whether a received overload message includes a traffic load reduction indication element; determining a percentage of network elements to which to relay the received overload message if the received overload message includes the traffic load reduction indication element; selecting ones of the network elements to which to send the received overload message based on the determined percentage; modifying the received message to change a value of the traffic load reduction indication element; and sending the modified message to the selected ones of the network elements. 10 . The media of claim 9 , wherein the received overload message comprises a mobility management element (“MME”) START message. 11 . The media of claim 9 , wherein the operations further comprise sending the received overload message to all of the network elements if the received overload message does not include the traffic load reduction indication element. 12 . The media of claim 9 , wherein the operations further comprise sending the received overload message to a configurable percentage of the network elements if the received overload message does not include the traffic load reduction indication element. 13 . The media of claim 9 , wherein each of the network elements comprises a Home eNodeB (“HeNB”). 14 . The media of claim 9 , wherein the operations further comprise, prior to the determining whether the received overload message includes a traffic load reduction indication element, receiving at a gateway element the overload message. 15 . The media of claim 9 , wherein upon receipt of the modified overload message, the selected network elements perform traffic filtering based on the modified overload message. 16 . An apparatus comprising: a memory element configured to store data; and a processor operable to execute instructions associated with the data; wherein the apparatus is configured to: determine whether a received overload message includes a traffic load reduction indication element; determine a percentage of network elements to which to relay the received overload message if the received overload message includes the traffic load reduction indication element; select ones of the network elements to which to send the received overload message based on the determined percentage; modify the received message to change a value of the traffic load reduction indication element; and send the modified message to the selected ones of the network elements. 17 . The apparatus of claim 16 , wherein the apparatus is further configured to send the received overload message to all of the network elements if the received overload message does not include the traffic load reduction indication element. 18 . The apparatus of claim 16 , wherein the apparatus is further configured to send the received overload message to a configurable percentage of the network elements if the received overload message does not include the traffic load reduction indication element. 19 . The apparatus of claim 16 , wherein the apparatus is further configured to, prior to the determining whether the received overload message includes a traffic load reduction indication element, receiving at a gateway element the overload message. 20 . The apparatus of claim 16 , wherein upon receipt of the modified overload message, the selected network elements perform traffic filtering based on the modified overload message.

Assignees

Inventors

Classifications

  • Arrangements for connecting between networks having differing types of switching systems, e.g. gateways · CPC title

  • between access point and backbone network device · CPC title

  • using signalling between network elements · CPC title

  • Arrangements for optimising operational condition · CPC title

  • based on location or mobility (handoff or reselection H04W36/00; mobile application services making use of the location of users or terminals H04W4/02) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2016366607A1 cover?
In accordance with one example embodiment, there is provided a method that includes determining whether a received overload message includes a traffic load reduction indication element; determining a percentage of network elements to which to relay the received overload message if the received overload message includes the traffic load reduction indication element; and selecting ones of the net…
Who is the assignee on this patent?
Cisco Tech Inc
What technology area does this patent fall under?
Primary CPC classification H04W28/0226. Mapped technology areas include Electricity.
When was this patent published?
Publication date Thu Dec 15 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).