Apparatus and methods for generating an instruction set for a user
US-2024419673-A1 · Dec 19, 2024 · US
US2016357606A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016357606-A1 |
| Application number | US-201615246577-A |
| Country | US |
| Kind code | A1 |
| Filing date | Aug 25, 2016 |
| Priority date | Nov 25, 2013 |
| Publication date | Dec 8, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Optimizing operational costs in a computing environment includes identifying high-cost jobs that are executed to generate one or more reports in the computing environment, identifying one or more reports the generation of which is dependent on the execution of the high-cost jobs, and culling at least a first job from among the high-cost jobs, in response to determining that a benefit achieved from the reports that depend on the first job does not justify costs associated with generating the reports.
Opening claim text (preview).
What is claimed is: 1 . A method for optimizing operational costs in a computing environment, the method comprising: identifying, via a computer processor, high-cost jobs from among a plurality of jobs that are executed by one or more computing devices in the computing environment to generate one or more reports in the computing environment, the high-cost jobs determined as a function of resource usage of resources in the computing environment, wherein the resource usage comprises at least one of CPU usage, data storage usage, memory usage, and network bandwidth usage; identifying, via the computer processor, one or more reports the generation of which is dependent on the execution of the high-cost jobs; and culling, via the computer processor, at least a first job from among the high-cost jobs, in response to determining that a benefit achieved from the reports that depend on the first job does not justify costs associated with generating the reports, wherein costs associated with a report are calculated based on aggregated cost of jobs on which the report depends, and wherein the cost of the individual job is determined by: if the job is not executing during the highest peak of resource usage, then its individual cost is zero; if the job is executing during the highest peak of resource usage but is needed by other reports too, then its individual cost is zero; and if the job is executing during the highest peak of resource usage and is only needed by a particular report, then the job cost is added to the report's individual job cost.
Resource planning, allocation, distributing or scheduling for enterprises or organisations · CPC title
Extract, transform and load [ETL] procedures, e.g. ETL data flows in data warehouses · CPC title
Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals · CPC title
Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues · CPC title
Performance analysis of employees; Performance analysis of enterprise or organisation operations · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.