Structure and fabrication method of a multilayer overlay for plain bearings
US-2015369287-A1 · Dec 24, 2015 · US
US2016348204A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016348204-A1 |
| Application number | US-201615163636-A |
| Country | US |
| Kind code | A1 |
| Filing date | May 24, 2016 |
| Priority date | May 25, 2015 |
| Publication date | Dec 1, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present disclosure relates to a method for improving the steel structure of a steel component after heating including the steps of heating the steel component to a temperature of at least 1100° C., quenching the steel component to a temperature above the martensite start temperature (Ms) to form bainite, and maintaining the steel component at that temperature for a holding time sufficient for transformation of all austenite to bainite, re-heating the steel component to a temperature of at least 580° C. but below the Ac 1 transformation temperature, and maintaining the steel component at that temperature for the steel component to exhibit a hardness of 45 Rockwell hardness C or below, and cooling the steel component.
Opening claim text (preview).
1 . A method for restoring a steel structure for a steel component after heating characterized in that it comprises the steps of: a) heating a steel component to a temperature of at least 1100° C., b) quenching the steel component to a temperature above the martensite start temperature (Ms) to form bainite, and maintaining the steel component at that temperature for a holding time sufficient for transformation of all austenite to bainite, c) re-heating the steel ring to a temperature of at least 580° C. but below the Ac 1 transformation temperature, and maintaining the steel ring at that temperature for the steel ring to exhibit a hardness of 45 Rockwell hardness C or below, d) cooling the steel ring. 2 . Method according to claim 1 , characterized in that step a) comprises forming the steel component by hot rolling, forging and/or hot drawing at a temperature of at least 1100° C. 3 . Method according to claim 1 , characterized in that step a) comprises welding the steel component at a temperature of at least 1100° C. to form a welding joint. 4 . Method according to claim 3 , characterized in that the welding joint is a flash butt welded joint. 5 . Method according to claim 1 , characterized in that comprises quenching the steel component to a temperature above Ms and below 450° C. to form bainite, and maintaining the steel component at that temperature for a holding time sufficient for transformation of all austenite to bainite. 6 . Method according to claim 1 , characterized in that step b) comprises quenching the steel component to a temperature of 300 to 350° C. to form bainite, and maintaining the steel component at that temperature for a holding time sufficient for transformation of all austenite to bainite. 7 . Method according to claim 1 , characterized in that the steel component is a high-carbon steel component. 8 . Method according to claim 1 , characterized in that the steel component is a bearing component. 9 . Method according to claim 8 , characterized in that the bearing component is a bearing ring. 10 . Steel component characterized in that it is manufactured using a method for restoring a steel structure for a steel component after heating characterized in that it comprises the steps of a) heating a steel component to a temperature of at least 1100° C., b) quenching the steel component to a temperature above the martensite start temperature (Ms) to form bainite and maintaining the steel component at that temperature for a holding time sufficient for transformation of all austenite to bainite, c) re-heating the steel ring to a temperature of at least 580° C. but below the Ac 1 transformation temperature, and maintaining the steel ring at that temperature for the steel ring to exhibit a hardness of 45 Rockwell hardness C or below, and d) cooling the steel ring. 11 . Steel component according to claim 10 , characterized in that it is a steel ring. 12 . Steel component according to claim 11 , characterized in that it is a bearing ring.
Special methods of manufacture · CPC title
Selection of substances · CPC title
Hardness · CPC title
containing silicon · CPC title
containing manganese · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.