Selectively deploying probes at different resource levels

US2016294665A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2016294665-A1
Application numberUS-201514934944-A
CountryUS
Kind codeA1
Filing dateNov 6, 2015
Priority dateMar 30, 2015
Publication dateOct 6, 2016
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Systems and methods may include deploying a first probe within a unified infrastructure management (UIM) system to monitor a system-level resource. The systems and methods may include determining that a monitored value for the system-level resource has crossed a threshold value. The systems and methods may include deploying a second probe within the UIM system to monitor a process-level resource in response to determining that the monitored value for the system-level resource has crossed the threshold value. The systems and methods may include storing information about the process-level resource obtained by the second probe in a memory.

First claim

Opening claim text (preview).

What is claimed is: 1 . A method comprising: deploying a first probe within a unified infrastructure management (UM) system to monitor a system-level resource; determining that a monitored value for the system-level resource has crossed a threshold value; in response to determining that the monitored value fir the system-level resource has crossed the threshold value, deploying a second probe within the UIM system to monitor a process-level resource; and storing information about the process-level resource obtained by the second probe in a memory. 2 . The method of claim 1 , further comprising: in response to determining that the monitored value for the system-level resource has crossed the threshold value, generating an alert indicating that the monitored value for the system-level resource has crossed the threshold value, the alert tagged with a link to the information about the process-level resource obtained by the second probe. 3 . The method of claim 1 , further comprising: providing the information about the process-level resource obtained by the second probe in a user interface, the user interface presenting the information about the process-level resource graphically. 4 . The method of claim 1 , wherein deploying the second probe within the UIM system to monitor the process-level resources comprises: determining whether the second probe is already deployed within the UIM system in a first configuration to monitor a particular resource; and in response to determining that the second probe is already deployed within the UIM system in the first configuration: storing information specifying the first configuration of the second probe in the memory; reconfiguring the second probe in a second configuration to monitor the process-level resource; and controlling the second probe in the second configuration to obtain the information about the process-level resource. 5 . The method of claim 4 , further comprising: determining that the monitored value for the system-level resource has crossed the threshold value in an opposite direction; and in response to determining that the monitored value for the system-level resource has crossed the threshold value in the opposite direction: accessing the information specifying the first configuration of the second probe in the memory; reconfiguring the second probe in the second configuration to monitor the particular resource; and controlling the second probe in the first configuration to monitor the particular resource. 6 . The method of claim 1 , wherein the system-level resource is total processor utilization for a particular device within the UIM system, and wherein the process-level resource is a processor utilization for a particular process running on the particular device. 7 . The method of claim 1 , wherein the system-level resource is a total memory utilization for a particular device within the UIM system, and wherein the process-level resource is a memory utilization for a particular process running on the particular device. 8 . The method of claim 1 , wherein deploying the second probe within the UIM system comprises: activating the second probe; and collecting information about a plurality of process-level resources including the information about the process-level resource, wherein the method further comprises: providing the information about the plurality of process-level resources in a user interface, the user interface providing access to the information about the plurality of process-level resources with central visualization. 9 . The method of claim 8 , further comprising: providing an option in the user interface to select a particular one of the plurality of process-level resources; and providing detailed information about the particular one of the plurality of process-level resources in response to receiving a selection of the particular one of the plurality of process-level resources. 10 . The method of claim 1 , wherein the first probe is deployed from a particular hub, and wherein the second probe is also deployed from the particular hub. 11 . A system comprising: a processing system configured to: deploy a first probe within a unified infrastructure management (UIM) system to monitor a system-level resource; determine that a monitored value for the system-level resource has crossed a threshold value; in response to determining that the monitored value for the system-level resource has crossed the threshold value, deploy a second probe within the UIM system to monitor a process-level resource; and store information about the process-level resource obtained by the second probe in a memory. 12 . The system of claim 11 , wherein the processing system is further configured to: in response to determining that the monitored value for the system-level resource has crossed the threshold value, generate an alert indicating that the monitored value for the system-level resource has crossed the threshold value, the alert tagged with a link to the information about the process-level resource obtained by the second probe. 13 . The system of claim 11 , wherein the processing system is further configured to: provide the information about the process-level resource obtained by the second probe in a user interface, the user interface presenting the information about the process-level resource graphically. 14 . The system of claim 11 , wherein, when deploying the second probe within the UIM system to monitor the process-level resources, the processing system is configured to: determine whether the second probe is already deployed within the UIM system in a first configuration to monitor a particular resource; and in response to determining that the second probe is already deployed within the UIM system in the first configuration: store information specifying the first configuration of the second probe in the memory; reconfigure the second probe in a second configuration to monitor the process-level resource; and control the second probe in the second configuration to obtain the information about the process-level resource. 15 . The system of claim 14 , wherein the processing system is further configured to: determine that the monitored value for the system-level resource has crossed the threshold value in an opposite direction; and in response to determining that the monitored value fir the system-level resource has crossed the threshold value in the opposite direction: access the information specifying the first configuration of the second probe in the memory; reconfigure the second probe in the second configuration to monitor the particular resource; and control the second probe in the first configuration to monitor the particular resource. 16 . The system of claim 11 , wherein the system-level resource is total processor utilization for a particular device within the UIM system, and wherein the process-level resource is a processor utilization for a particular process running on the particular device. 17 . The system of claim 11 , wherein the system-level resource is a total memory utilization for a particular device within the UIM system, and wherein the process-level resource is a memory utilization for a particular process running on the particular device. 18 . The system of claim 11 , wherein, when deploying the second probe within the UIM system, the processing system is configured to: activate the second probe; and collect information about a plurality of process-level

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2016294665A1 cover?
Systems and methods may include deploying a first probe within a unified infrastructure management (UIM) system to monitor a system-level resource. The systems and methods may include determining that a monitored value for the system-level resource has crossed a threshold value. The systems and methods may include deploying a second probe within the UIM system to monitor a process-level resourc…
Who is the assignee on this patent?
Fowler Martin Carl, Ca Inc
What technology area does this patent fall under?
Primary CPC classification H04L43/12. Mapped technology areas include Electricity.
When was this patent published?
Publication date Thu Oct 06 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).