Long Offset Acquisition
US-2024418893-A1 · Dec 19, 2024 · US
US2016178776A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016178776-A1 |
| Application number | US-201514977791-A |
| Country | US |
| Kind code | A1 |
| Filing date | Dec 22, 2015 |
| Priority date | Dec 23, 2014 |
| Publication date | Jun 23, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Embodiments of real-time infill in marine seismic surveys using an independent seismic source are described. One method of seismic data acquisition includes acquiring primary seismic data at a plurality of streamers towed by an acquisition vessel based at least in part on energy emitted by a first seismic source, and towing an independent seismic source to acquire infill seismic data at the plurality of streamers based at least in part on energy emitted by the independent seismic source while the primary seismic data is still being acquired at the plurality of streamers based at least in part on the energy emitted by the first seismic source, wherein the independent seismic source is towed independently of the acquisition vessel.
Opening claim text (preview).
What is claimed is: 1 . A method of seismic data acquisition, comprising: acquiring primary seismic data at a plurality of streamers towed by an acquisition vessel based at least in part on energy emitted by a first seismic source; and towing an independent seismic source to acquire infill seismic data at the plurality of streamers based at least in part on energy emitted by the independent seismic source while the primary seismic data is still being acquired at the plurality of streamers based at least in part on the energy emitted by the first seismic source, wherein the independent seismic source is towed independently of the acquisition vessel. 2 . The method of claim 1 , wherein the first seismic source is also towed independently of the acquisition vessel. 3 . The method of claim 1 , wherein the primary seismic data is acquired further based on energy emitted by second and third seismic sources. 4 . The method of claim 3 , wherein the first, second, and third seismic sources are towed over one or more of the plurality of streamers in an undulating manner between a left side and a right side of a source navigation region. 5 . The method of claim 1 , wherein the first seismic source is towed by the acquisition vessel. 6 . The method of claim 1 , wherein the independent seismic source is towed by an independent source vessel following posterior ends of the plurality of streamers and at a lateral displacement from a sail line traversed by the acquisition vessel. 7 . The method of claim 6 , further comprising: towing one or more additional streamers by the independent source vessel. 8 . The method of claim 6 , wherein the lateral displacement is adjusted in real-time based at least in part on measured feathering of the plurality of streamers. 9 . The method of claim 8 , wherein the lateral displacement is an average lateral displacement and the independent source vessel undulates about the average lateral displacement. 10 . The method of claim 6 , wherein an inline displacement behind the posterior ends of the plurality of streamers at which the independent seismic source is towed is adjusted in real-time based at least in part on measured feathering of the plurality of streamers or coverage of the acquired primary seismic data. 11 . The method of claim 1 , wherein the independent seismic source is towed by an independent source vessel ahead of the acquisition vessel and at a lateral displacement from a sail line traversed by the acquisition vessel. 12 . The method of claim 1 , wherein the acquisition vessel travels along a first sail line to acquire primary seismic data along the first sail line and subsequently travels along a second sail line, adjacent to the first sail line, to acquire primary seismic data along the second sail line. 13 . The method of claim 12 , further comprising: determining, while the acquisition vessel travels along the second sail line, whether to use the independent seismic source to acquire infill seismic data associated with the second sail line or to acquire infill seismic data associated with the first sail line. 14 . The method of claim 13 , wherein said determining is based at least in part on real-time analysis of coverage of a combination of the primary seismic data and infill seismic data acquired along the first sail line, coverage of the primary seismic data acquired along the second sail line, or coverage of the combination of primary seismic data and infill seismic data acquired along the first sail line and coverage of the primary seismic data acquired along the second sail line. 15 . The method of claim 13 , further comprising: performing real-time modeling or deterministic algorithmic prediction based at least in part on observed feathering of the plurality of streamers along the second sail line and analysis of coverage of a combination of the primary seismic data and infill seismic data acquired along the first sail line to predict likely improved coverage resulting from acquiring infill seismic data associated with the first sail line and likely improved coverage resulting from acquiring infill seismic data associated with the second sail line, wherein said determining to acquire infill seismic data associated with the second sail line or to acquire infill seismic data associated with the first sail line is based at least in part on said real-time modeling or said deterministic algorithmic prediction. 16 . The method of claim 1 , further comprising: analyzing the acquired primary seismic data in real-time to determine areas in which infill seismic data may need to be acquired; and positioning the independent seismic source based at least in part on the determined areas. 17 . The method of claim 16 , wherein the acquired primary seismic data is analyzed following sensing of reflected seismic energy but prior to posterior ends of the plurality of streamers completing acquisition of the primary seismic data along a first sail line. 18 . The method of claim 16 , wherein one or more parameters associated with a vessel towing the independent seismic source are controlled based at least in part on said analysis of the acquired primary seismic data, said one or more parameters including a speed, a direction, an inline distance from posterior ends of the plurality of streamers or ahead of the acquisition vessel, an average lateral distance from a sail line of the acquisition vessel, and an undulation around the average lateral distance from the acquisition vessel. 19 . The method of claim 16 , further comprising: predicting additional areas which are likely to require infill seismic data to be acquired; and towing the independent seismic source based at least in part on the predicted additional areas. 20 . The method of claim 1 , further comprising: replacing the first seismic source with the independent seismic source in the event that the first seismic source is taken out of service. 21 . The method of claim 1 , further comprising: following acquisition of the primary seismic data along a first sail line based at least in part on the energy emitted by the first seismic source, continuing to acquire the infill seismic data as posterior ends of the streamers continue to traverse the first sail line. 22 . The method of claim 1 , wherein the independent seismic source emits seismic energy substantially contemporaneously to the first seismic source emitting seismic energy. 23 . The method of claim 1 , wherein the independent seismic source is towed so as to generate ultra-long offset infill seismic data using the independent seismic source. 24 . The method of claim 1 , wherein towing the independent seismic source comprises: acquiring the infill seismic data based on an assessment of a coverage of the primary seismic data, the coverage of the primary seismic data including an interpolation of sub-surface sampling using a regularization process. 25 . A seismic data acquisition system, comprising: an acquisition vessel configured to tow a plurality of streamers; a first seismic source configured to cause the plurality of streamers to acquire primary seismic data based at least in part on seismic energy emitted by the first seismic source; an independent seismic source configured to cause the plurality of streamers to acquire infill seismic data based at least in part on seismic energy emitted by the independent seismic so
Seismic data acquisition, e.g. survey design · CPC title
Positioning of seismic devices · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.