Once-through steam generator

US2016178190A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2016178190-A1
Application numberUS-201414909585-A
CountryUS
Kind codeA1
Filing dateJul 29, 2014
Priority dateAug 6, 2013
Publication dateJun 23, 2016
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A once-through steam generator includes a combustion chamber, the walls of which comprise vertically arranged evaporator pipes connected to one another in gas-tight fashion by pipe webs, through which evaporator pipes flows a flow medium from bottom to top. The evaporator pipes are combined by upstream inlet collectors to form more intensely and less intensely heated pipe groups. A feed water supply is assigned to respective inlet collectors. At least one regulating valve regulates throttling of the mass flow of the flow medium into the evaporator pipes. To determine a control variable for the regulating valve, temperature measurement device measures outlet temperatures of the flow medium exiting the evaporator pipes. Each of the more intensely and less intensely heated pipe groups is assigned to one of the inlet collectors and to an outlet collector, and each of the outlet collectors has one of the temperature measurement devices.

First claim

Opening claim text (preview).

1 .- 6 . (canceled) 7 . A once-through steam generator, comprising: a burning chamber of substantially rectangular cross section, the burning chamber walls of which comprise substantially vertically arranged evaporator tubes of the once-through steam generator which are connected to one another in a gastight manner via tube webs and are flowed through by a flow medium from the bottom to the top, wherein the evaporator tubes of the burning chamber walls are combined in accordance with their degree of heating by inlet headers which are arranged upstream in each case to form more heated tube groups and less heated tube groups, and wherein the respective inlet headers are assigned a feed water supply, at least one control valve provided in the region of the feed water supply for the controlled throttling of the mass flow of the flow medium in the evaporator tubes, temperature measuring devices for measuring outlet temperatures of the flow medium from the evaporator tubes located in the region of outlet headers which are arranged downstream in order to determine a control variable for the at least one control valve, wherein each of the more heated tube groups and less heated tube groups are assigned in each case to one of the inlet headers and an outlet header, wherein each of the outlet headers has one of the temperature measuring devices, and wherein the less heated tube groups being corner wall regions of the substantially rectangular burning chamber, and wherein each of the four corner wall regions has a dedicated feed water supply line with in each case one control valve. 8 . The once-through steam generator as claimed in claim 7 , wherein the more heated tube groups are middle wall regions of the substantially rectangular burning chamber, and each of the four middle wall regions has a dedicated feed water supply with in each case one control valve. 9 . A method for operating a once-through steam generator as claimed in claim 7 , comprising: reducing the feed water supply of the less heated tube groups by throttling of the at least one control valve to such an extent that outlet temperatures of the more heated tube groups are equalized to those of the less heated tube groups. 10 . The method as claimed in claim 9 , further comprising: reducing the feed water supply of the more heated tube groups by throttling of the at least one control valve to such an extent that the outlet temperatures of the more heated tube groups are equalized to those of the less heated tube groups. 11 . The method as claimed in claim 9 , further comprising: establishing an equalization of the outlet temperatures between the more heated and less heated tube groups. 12 . The once-through steam generator as claimed in claim 7 , wherein the once-through steam generator comprises a forced-flow steam generator.

Assignees

Inventors

Classifications

  • Control systems by injecting water (for superheaters F22G5/12) · CPC title

  • F22B29/062Primary

    involving vertically-disposed water tubes · CPC title

  • with a tube bundle between an upper and a lower drum in the convection pass · CPC title

  • of once-through type · CPC title

  • Control systems for steam generators having multiple flow paths · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2016178190A1 cover?
A once-through steam generator includes a combustion chamber, the walls of which comprise vertically arranged evaporator pipes connected to one another in gas-tight fashion by pipe webs, through which evaporator pipes flows a flow medium from bottom to top. The evaporator pipes are combined by upstream inlet collectors to form more intensely and less intensely heated pipe groups. A feed water s…
Who is the assignee on this patent?
Siemens Ag
What technology area does this patent fall under?
Primary CPC classification F22B29/062. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Thu Jun 23 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).