Determining Appraisal Locations in a Reservoir System
US-2015369018-A1 · Dec 24, 2015 · US
US2016108705A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016108705-A1 |
| Application number | US-201414896685-A |
| Country | US |
| Kind code | A1 |
| Filing date | Jul 2, 2014 |
| Priority date | Mar 11, 2011 |
| Publication date | Apr 21, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of performing a fracture operation is provided at a wellsite. The wellsite is positioned about a subterranean formation having a wellbore therethrough and a complex fracture network therein. The complex fracture network includes natural fractures, and the wellsite stimulated by injection of an injection fluid with proppant into the complex fracture network. The method involves generating wellsite data comprising measurements of microseismic events of the subterranean formation, modeling a hydraulic fracture network and a discrete fracture network of the complex fracture network based on the wellsite data, and performing a seismic moment operation. The method involves determining an actual seismic moment density based on the wellsite data and a predicted seismic moment density based on shear and tensile components of the simulated hydraulic fracture network, and calibrating the discrete fracture network based on a comparison of the predicted moment density and the actual moment density.
Opening claim text (preview).
What is claimed is: 1 . A method of performing a fracture operation at a wellsite, the wellsite positioned about a subterranean formation having a wellbore ( 1204 ) therethrough and a complex fracture network therein, the fracture network comprising natural fractures, the wellsite stimulated by injection of an injection fluid with proppant into the fracture network, the method comprising: generating wellsite data ( 2352 ) comprising measurements of microseismic events of the subterranean formation; modeling ( 2375 ) a hydraulic fracture network and a discrete fracture network of the complex fracture network based on the wellsite data; characterized in that the method further comprises: performing ( 4553 . 2 ) a seismic moment operation, comprising: determining ( 4559 ) an actual seismic moment density based on the wellsite data and a predicted seismic moment density based on shear and tensile components of the simulated hydraulic fracture network; and calibrating ( 4561 ) the discrete fracture network based on a comparison of the predicted moment density and the actual moment density; and adjusting ( 2387 ) the injection based on the calibrating. 2 . The method of claim 1 , wherein the determining the predicted seismic moment density comprises: defining ( 4557 ) the shear and tensile components of the simulated hydraulic fracture network; and converting ( 4558 ) the shear and tensile components of the simulated hydraulic fracture network to a simulated moment density. 3 . The method of any preceding claim, further comprising predicting ( 4567 ) proppant placement based on the modeled discrete fracture network. 4 . The method of claim 3 , further comprising predicting ( 4568 ) production based on the predicted proppant placement. 5 . The method of claim 3 or 4 , further comprising predicting ( 4569 ) reservoir pressure based on the predicted proppant placement. 6 . The method of any preceding claim, wherein the modeling a discrete fracture network comprises generating an initial discrete fracture network from at least one of wellsite data comprising seismic measurement, geological structure, borehole imaging log, core, and combinations thereof based on description measurement. 7 . The method of any preceding claim, wherein the modeling hydraulic fracture network comprises generating an initial hydraulic fracture design and carrying out simulation using a complex fracture model that incorporates the interaction of hydraulic fractures and natural fractures. 8 . The method of any preceding claim, wherein the generating wellsite data comprises pumping fracturing treatment into a wellbore of the wellsite and collecting microseismic data in real-time. 9 . The method of any preceding claim, wherein the calibrating comprises: calibrating ( 4777 ) the discrete fracture network and redistributing the natural fractures according to an observed microseismic event distribution over an event area; calibrating ( 4779 ) additional natural fracture and formation parameters using the calibrated discrete fracture network to match a coverage area of the modeled hydraulic fracture network against the event area and the simulated treatment pressure against a measured pressure; and optimizing ( 4781 ) the injection at the wellsite by revising the modeled hydraulic fracture based on the calibrated discrete fracture network. 10 . The method of any preceding claim, further comprising performing a shear failure operation comprising: determining ( 2377 ) a stress field of the hydraulic fractures using a geomechanical model; determining ( 2379 ) shear failure parameters comprising a failure envelope and a stress state about the fracture network; determining ( 2381 ) a location of shear failure of the fracture network from the failure envelope and the stress state; and comparing ( 2383 ) the modeled hydraulic fractures and the locations of shear failure against the measured microseismic events. 11 . The method of any preceding claim, further comprising stimulating ( 2350 ) the wellsite by injecting the injection fluid with proppant into the fracture network. 12 . The method of claim 11 , wherein the adjusting comprises adjusting ( 2387 ) the stimulation operation based on the calibrating.
Fixed Constructions · mapped topic
reinforcing fractures by propping · CPC title
by forming crevices or fractures · CPC title
Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.