Broken Rail Detection System for Communications-Based Train Control

US2016107664A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2016107664-A1
Application numberUS-201414893714-A
CountryUS
Kind codeA1
Filing dateMay 6, 2014
Priority dateMay 30, 2013
Publication dateApr 21, 2016
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system and method for detecting broken rails in a track of parallel rails includes at least one first broken rail detection module configured to measure a current through the track and a central control system configured to determine a location of at least one train on the track. The at least one first broken rail detection module is configured to send the central control system a signal based on the measured current. The central control office is configured to determine if a broken rail exists on the track and/or a location of the broken rail on the track based at least partially on the measured current and the location of the at least one train on the track.

First claim

Opening claim text (preview).

What is claimed is: 1 . A system for detecting broken rails in a track of parallel rails, the system comprising: at least one first broken rail detection module configured to measure a current through the track; and a central control system configured to determine a location of at least one train on the track, wherein the at least one first broken rail detection module is configured to send the central control system a signal based on the measured current, and wherein the central control system is configured to determine if a broken rail exists on the track based at least partially on the measured current and the location of the at least one train on the track. 2 . The system of claim 1 , wherein the central control system is configured to determine a location of the broken rail on the track based at least partially on a measurement time of the measured current and a location of the at least one train on the track at the measurement time. 3 . The system of claim 1 , wherein the central control system is configured to determine locations of at least a first train and a second train on the track, wherein the at least one first broken rail detection module is configured to measure a current through a dynamic track circuit formed in the track between the first train and the second train, and wherein the central control system is configured to determine if a broken rail exists on the track based at least partially on the measured current and the location of the first train and the second train. 4 . The system of claim 1 , further comprising: at least one second broken rail detection module configured to apply a shunt to the track, wherein the at least one first broken rail detection module is configured to measure a current through a dynamic track circuit formed in the track between the at least one train and the shunt applied by the at least one second broken rail detection module. 5 . A system for detecting broken rails in a track of parallel rails, the system comprising: at least one first broken rail detection module configured to measure a current through the track; and a central control system configured to determine a location of at least one train on the track, wherein the central control system is configured to send the at least one first broken rail detection module the location of the at least one train on the track, and wherein the at least one first broken rail detection module is configured to determine if a broken rail exists on the track based at least partially on the measured current and the location of the at least one train on the track. 6 . A system for detecting broken rails in a track of parallel rails, the system comprising: at least one first broken rail detection module configured to measure a current through the track; and a central control system configured to determine a location of at least one train on the track, wherein the at least one first broken rail detection module is configured to send the central control system a signal indicating a broken rail condition on the track; and wherein the central control system is configured to determine a location of the broken rail on the track based at least partially on the location of the at least one train on the track. 7 . A system for detecting broken rails in a track of parallel rails, the system comprising: a first broken rail detection module configured to apply a first shunt to the track at a first location; a second broken rail detection module configured to apply a second shunt to the track at a second location; a third broken rail detection module configured to measure a current in a track circuit formed between the first shunt and the second shunt; and a central control system configured to determine if a broken rail exists on the track between the first broken rail detection module and the second broken rail detection module based at least partially on the measured current in the track circuit. 8 . A method for detecting broken rails in a track of parallel rails, the method comprising: measuring, by at least one first broken rail detection module, a current through the track; determining, by a central control system, a location of at least one train on the track; communicating, by the at least one first broken rail detection module, a signal based on the measured current to the central control system; and determining, by the central control system, if a broken rail exists on the track based at least partially on the measured current and the location of the at least one train on the track. 9 . The method of claim 8 , wherein the determining, by the central control system, if a broken rail exists on the track comprises determining a location of the broken rail on the track based on a measurement time of the measured current and a location of the at least one train on the track at the measurement time. 10 . The method of claim 8 , further comprising: determining, by the central control system, locations of at least a first train and a second train on the track, wherein the current measured through the track is a current through a dynamic track circuit formed in the track between the first train and the second train, and wherein the central control system determines if a broken rail exists in the track based at least partially on the signal based on the measured current and the location of the first train and the second train. 11 . The method of claim 8 , further comprising: applying, by at least one second broken rail detection module, a shunt to the track, wherein the current measured through the track is a current through a dynamic track circuit formed in the track between the at least one train and the shunt applied by the at least one second broken rail detection module. 12 . A method for detecting broken rails in a track of parallel rails, the method comprising: measuring, by at least one first broken rail detection module, a current through the track; determining, by a central control system, a location of at least one train on the track; communicating, by the central control system, the location of the at least one train on the track to the at least one first broken rail detection module; and determining, by the at least one first broken rail detection module, if a broken rail exists on the track based at least partially on the measured current and the location of the at least one train on the track. 13 . A method for detecting broken rails in a track of parallel rails, the method comprising: measuring, by at least one first broken rail detection module, a current through the track; determining, by a central control system, a location of at least one train on the track; communicating, by the at least one first broken rail detection module, a signal indicating a broken rail condition on the track to the central control system; and determining, by the central control system, a location of the broken rail on the track based at least partially on the location of the at least one train on the track. 14 . A method for detecting broken rails in a track of parallel rails, the method comprising: applying, by a first broken rail detection module, a first shunt to the track at a first location; applying, by a second broken rail detection module, a second shunt to the track at a second location; measuring, by a third broken rail detection module, a current in a track circuit formed between the first shunt and the second shunt; and determining, by a central control system, if a broken rail exists on the track between the first broken rail detection module and the second broken rail detection modu

Assignees

Inventors

Classifications

  • B61L23/044Primary

    Broken rails · CPC title

  • Indicating or recording positions or identities of vehicles or trains · CPC title

  • Operations & Transport · mapped topic

  • B61L27/53Primary

    for trackside elements or systems, e.g. trackside supervision of trackside control system conditions · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2016107664A1 cover?
A system and method for detecting broken rails in a track of parallel rails includes at least one first broken rail detection module configured to measure a current through the track and a central control system configured to determine a location of at least one train on the track. The at least one first broken rail detection module is configured to send the central control system a signal base…
Who is the assignee on this patent?
Wabtec Holding Corp
What technology area does this patent fall under?
Primary CPC classification B61L23/044. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Thu Apr 21 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).