Quantitative analysis apparatus, method and program and manufacturing control system
US-12174131-B2 · Dec 24, 2024 · US
US2016019662A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2016019662-A1 |
| Application number | US-201414335387-A |
| Country | US |
| Kind code | A1 |
| Filing date | Jul 18, 2014 |
| Priority date | Jul 18, 2014 |
| Publication date | Jan 21, 2016 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Various arrangements are presented for performing comparisons of indented cost BOM (bill of material) structures of two or more items in a supply chain management system. By understanding the hierarchical nature of the indented cost BOM structure of each item and various nested relationships, it may be possible to perform complex comparisons that involve multi-level structures.
Opening claim text (preview).
What is claimed is: 1 . A method for performing a cost comparison of at least a first item and a second item, the method comprising: receiving, by a computer system, a request for the cost comparison that identifies the first item and the second item; based on the request, determining, by the computer system, a first cost bill of materials (BOM) structure for the first item and a second cost BOM structure for the second item; comparing, by the computer system, the first cost BOM structure to the second cost BOM structure to identify a first group of entries that are common to the first cost BOM structure and the second cost BOM structure, the first group of entries comprising a plurality of components and resources; identifying, by the computer system, a second group of entries present in the first cost BOM structure but not the second cost BOM structure; identifying, by the computer system, a third group of entries present in the second cost BOM structure but not the first cost BOM structure; determining, by the computer system, for each entry of each cost BOM structure, a cost associated with the entry; and creating, by the computer system, a listing of the first group of entries, the second group of entries, and the third group of entries, wherein the first group of entries has, for at least one entry of the first group of entries, the first item is associated with a different cost than the second item. 2 . The method for performing the cost comparison of claim 1 , wherein the first item and the second item are a same type of item, but are manufactured at geographically-separated manufacturing facilities. 3 . The method for performing the cost comparison of claim 1 , wherein the cost for a first entry present on the first cost BOM structure and the second cost BOM structure comprises a cost related to overhead. 4 . The method for performing the cost comparison of claim 3 , wherein a second entry present on the first cost BOM structure and the second cost BOM structure is acquired from different suppliers for the first item and the second item. 5 . The method for performing the cost comparison of claim 1 , the method further comprising: outputting, by the computer system, for presentation the listing of the first group of entries, the second group of entries, and the third group of entries in the form of a table to a user computer system from which the request was received. 6 . The method for performing the cost comparison of claim 1 , wherein the first group of entries is listed in the listing above the second group of entries and the third group of entries. 7 . The method for performing the cost comparison of claim 5 , wherein at least one entry of the first group of entries is comprised of a plurality of components, the method further comprising: outputting, by the computer system, for presentation a first entry of the first group of entries as a collapsible field within the table, wherein: the collapsible field, when collapsed, indicates a total cost for a subassembly of the first item and the second item, and the collapsible field, when expanded, lists costs for each component of the subassembly for the first item and the second item. 8 . A system for performing a cost comparison of at least a first item and a second item, the system comprising: one or more processors; and a memory communicatively coupled with and readable by the one or more processors and having stored therein processor-readable instructions which, when executed by the one or more processors, cause the one or more processors to: receive a request for the cost comparison that identifies the first item and the second item; based on the request, determine a first cost bill of materials (BOM) structure for the first item and a second cost BOM structure for the second item; compare the first cost BOM structure to the second cost BOM structure to identify a first group of entries that are common to the first cost BOM structure and the second cost BOM structure, the first group of entries comprising a plurality of components and resources; identify a second group of entries present in the first cost BOM structure but not the second cost BOM structure; identify a third group of entries present in the second cost BOM structure but not the first cost BOM structure; determine for each entry of each cost BOM structure, a cost associated with the entry; and create a listing of the first group of entries, the second group of entries, and the third group of entries, wherein the first group of entries has, for at least one entry of the first group of entries, the first item is associated with a different cost than the second item. 9 . The system for performing the cost comparison of claim 8 , wherein the first item and the second item are a same type of item, but are manufactured at geographically-separated manufacturing facilities. 10 . The system for performing the cost comparison of claim 8 , wherein the cost for a first entry present on the first cost BOM structure and the second cost BOM structure comprises a cost related to overhead. 11 . The system for performing the cost comparison of claim 10 , wherein a second entry present on the first cost BOM structure and the second cost BOM structure is acquired from different suppliers for the first item and the second item. 12 . The system for performing the cost comparison of claim 8 , wherein the processor-readable instructions, when executed, further cause the one or more processors to: output for presentation the listing of the first group of entries, the second group of entries, and the third group of entries in the form of a table to a user computer system from which the request was received. 13 . The system for performing the cost comparison of claim 8 , wherein the first group of entries is listed in the listing above the second group of entries and the third group of entries. 14 . The system for performing the cost comparison of claim 12 , wherein at least one entry of the first group of entries is comprised of a plurality of components, and the processor-readable instructions, when executed, further cause the one or more processors to: output for presentation a first entry of the first group of entries as a collapsible field within the table, wherein: the collapsible field, when collapsed, indicates a total cost for a subassembly of the first item and the second item, and the collapsible field, when expanded, lists costs for each component of the subassembly for the first item and the second item. 15 . A non-transitory processor-readable medium for performing a cost comparison of at least a first item and a second item, comprising processor-readable instructions configured to cause one or more processors to: receive a request for the cost comparison that identifies the first item and the second item; based on the request, determine a first cost bill of materials (BOM) structure for the first item and a second cost BOM structure for the second item; compare the first cost BOM structure to the second cost BOM structure to identify a first group of entries that are common to the first cost BOM structure and the second cost BOM structure, the first group of entries comprising a plurality of components and resources; identify a second group of entries present in the first cost BOM structure but not the second cost BOM structure; identify a third group of entries present in the second cost BOM structure but not the first cost BOM structure; determine for each entry of each cost BOM structure, a cost associated with the entry; and create
Resource planning in a project environment · CPC title
Manufacturing · CPC title
Computing systems specially adapted for manufacturing · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.