Method of controlling a wind turbine
US-2025003383-A1 · Jan 2, 2025 · US
US12577937B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12577937-B2 |
| Application number | US-202218695956-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 21, 2022 |
| Priority date | Oct 1, 2021 |
| Publication date | Mar 17, 2026 |
| Grant date | Mar 17, 2026 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of controlling a wind turbine is provided, including the steps of detecting a power-on time (TAP_on) at which auxiliary power becomes available after an absence of auxiliary power; determining, at power-on time (TAP_on), the elapsed time (Telapsed) since a dryness requirement of the wind turbine was satisfied; and subsequently initiating a wind turbine start-up procedure if the elapsed time (Telapsed) does not exceed a predetermined duration (Tsafe) or inhibiting a wind turbine start-up procedure if the elapsed time (Telapsed) exceeds the predetermined duration (Tsafe).
Opening claim text (preview).
The invention claimed is: 1 . A method of controlling a wind turbine, the method comprising: detecting a power-on time at which an auxiliary power for the wind turbine becomes available after an absence of the auxiliary power; determining, at the power-on time, an elapsed time since a dryness requirement of the wind turbine was satisfied, the dryness requirement including at least a dryness of an electrical system of the wind turbine; and either initiating a wind turbine start-up procedure if the elapsed time does not exceed a predetermined duration, or inhibiting the wind turbine start-up procedure if the elapsed time exceeds the predetermined duration. 2 . The method according to claim 1 , further comprising performing a dry-out procedure for the electrical system of the wind turbine if the elapsed time exceeds the predetermined duration. 3 . The method according to claim 2 , further comprising initiating the wind turbine start-up procedure after completion of the dry-out procedure. 4 . The method according to claim 2 , wherein a duration of the dry-out procedure is determined on a basis of the dryness of the electrical system of the wind turbine. 5 . The method according to claim 4 , wherein the dryness of the electrical system is established on a basis of a temperature measurement and/or a relative humidity measurement and/or a resistivity measurement obtained for the electrical system. 6 . The method according to claim 4 , wherein a state of the dryness of the electrical system of the wind turbine is recorded as a dryness timestamp, the dryness timestamp comprising a dryness status flag and a time of recording. 7 . The method according to claim 6 , further comprising initializing the dryness timestamp when a wind turbine control arrangement is installed, the initializing comprising setting the dryness status flag to indicate a dry state. 8 . The method according to claim 1 , further comprising computing a dry-out time for the electrical system of the wind turbine on a basis of a moisture-retention property of a material of the electrical system. 9 . The method according to claim 1 , further comprising computing a dry-out time for the electrical system of the wind turbine on a basis of an efficacy of a climate control apparatus arranged in an interior of the wind turbine, the climate control apparatus comprising at least one of a heater and a ventilator, wherein the efficacy is determined based on a rate of moisture evaporation measured during operation of the climate control apparatus. 10 . A computer program product, comprising a computer readable hardware storage device having computer readable program code stored therein, said program code executable by a processor of a computer system to implement a method according to claim 1 when the computer program is executed by a wind turbine control arrangement.
Starting · CPC title
Aeration, ventilation, dehumidification or moisture removal of closed spaces · CPC title
Wind turbines with rotation axis in wind direction · CPC title
Air humidity · CPC title
Power (if explicitly mentioned) · CPC title