Full-duplex communication method and apparatus
US-11496190-B2 · Nov 8, 2022 · US
US12563582B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12563582-B2 |
| Application number | US-202017084382-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 29, 2020 |
| Priority date | Nov 8, 2019 |
| Publication date | Feb 24, 2026 |
| Grant date | Feb 24, 2026 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Aspects described herein relate to determining, by a node, to establish a first connection with a first upstream node for receiving downlink communications, and determining, by the node, to establish a second connection with a second upstream node for transmitting uplink communications or establishing a second connection with the same upstream node based on a second transmit/receive beam pair. The first connection can be established with the first upstream node based on a first transmit/receive beam pair. The second connection can be established with the second upstream node (or the same upstream node) based on a second transmit/receive beam pair and concurrently with the first connection is established with the first upstream node.
Opening claim text (preview).
What is claimed is: 1 . A method of wireless communication, comprising: determining, by a node, to establish a first connection with a first upstream node for receiving downlink communications for transmitting to a device; determining, by the node, based on the first upstream node being unable to receive a transmit beam from the node at at least a threshold signal strength, to establish a second connection with a second upstream node for transmitting uplink communications received from the device, wherein the second upstream node is different from the first upstream node; establishing the first connection with the first upstream node based on a first transmit/receive beam pair; and establishing the second connection with the second upstream node based on a second transmit/receive beam pair and concurrently with the first connection established with the first upstream node. 2 . The method of claim 1 , wherein determining to establish the first connection is based on performing beam training and determining that a first beam from the first upstream node is desirable for downlink communications. 3 . The method of claim 2 , wherein determining to establish the second connection is based on performing the beam training and determining that a second beam from the second upstream node is desirable for uplink communications. 4 . The method of claim 3 , wherein determining to establish the first connection or determining to establish the second connection is based on comparing a first signal quality of the first beam to a first threshold or comparing a second signal quality of the second beam to a second threshold. 5 . The method of claim 4 , wherein the first signal quality and the second signal quality correspond to at least one of a signal-to-noise ratio (SNR) or a signal-to-interference-and-noise ratio (SINR). 6 . The method of claim 1 , further comprising performing beam training and sending one or more beam reports to a centralized entity indicating signal measurements of multiple beams. 7 . The method of claim 6 , wherein determining to establish the first connection and determining to establish the second connection are based on an indication of the first transmit/receive beam pair or the second transmit/receive beam pair received from the centralized entity based on the one or more beam reports. 8 . The method of claim 1 , wherein the node, the first upstream node, or the second upstream node include at least one of an integrated access and backhaul (IAB) node, a user equipment (UE), a customer premises equipment (CPE), an access point, a relay node, or a repeater. 9 . A method of wireless communication, comprising: determining, by a first node and based on a first transmit/receive beam pair, to establish a first connection with an upstream node for receiving downlink communications for transmitting to a device; determining, by the first node and based on the first node being unable to receive a transmit beam from the upstream node at at least a threshold signal strength when using the first transmit/receive beam pair, to establish, using the second transmit/receive beam pair different from the first transmit/receive beam pair, a second connection with the upstream node for transmitting uplink communications received from the device; establishing the first connection with the upstream node based on the first transmit/receive beam pair; and establishing the second connection with the upstream node based on the second transmit/receive beam pair concurrently with the first connection established with the upstream node. 10 . The method of claim 9 , wherein determining to establish the first connection is based on performing beam training and determining that a first beam from the upstream node is desirable for downlink communications and determining that a second beam from the upstream node is desirable for uplink communications. 11 . The method of claim 10 , wherein determining to establish the first connection or determining to establish the second connection is based on comparing a first signal quality of the first beam to a first threshold or comparing a second signal quality of the second beam to a second threshold. 12 . The method of claim 11 , wherein the first signal quality and the second signal quality correspond to at least one of a signal-to-noise ratio (SNR) or a signal-to-interference-and-noise ratio (SINR). 13 . The method of claim 9 , further comprising performing beam training and sending one or more beam reports to a centralized entity indicating signal measurements of multiple beams. 14 . The method of claim 13 , wherein determining to establish the first connection and determining to establish the second connection are based on an indication of the first transmit/receive beam pair or the second transmit/receive beam pair received from the centralized entity based on the one or more beam reports. 15 . The method of claim 9 , wherein the first node or the upstream node include at least one of an integrated access and backhaul (IAB) node, a user equipment (UE), a customer premises equipment (CPE), an access point, a relay node, or a repeater. 16 . An apparatus for wireless communication, comprising: a transceiver; a memory configured to store instructions; and one or more processors communicatively coupled with the transceiver and the memory, wherein the one or more processors are configured to: determine to establish a first connection with a first upstream node for receiving downlink communications for transmitting to a device; determine, based on the first upstream node being unable to receive a transmit beam from the apparatus at at least a threshold signal strength, to establish a second connection with a second upstream node for transmitting uplink communications received from the device, wherein the second upstream node is different from the first upstream node; establish the first connection with the first upstream node based on a first transmit/receive beam pair; and establish the second connection with the second upstream node based on a second transmit/receive beam pair and concurrently with the first connection established with the first upstream node. 17 . The apparatus of claim 16 , wherein the one or more processors are configured to determine to establish the first connection based on performing beam training and determining that a first beam from the first upstream node is desirable for downlink communications. 18 . The apparatus of claim 17 , wherein the one or more processors are configured to determine to establish the second connection based on performing the beam training and determining that a second beam from the second upstream node is desirable for uplink communications. 19 . The apparatus of claim 18 , wherein the one or more processors are configured to determine to establish the first connection or determine to establish the second connection based on comparing a first signal quality of the first beam to a first threshold or comparing a second signal quality of the second beam to a second threshold. 20 . The apparatus of claim 19 , wherein the first signal quality and the second signal quality correspond to at least one of a signal-to-noise ratio (SNR) or a signal-to-interference-and-noise ratio (SINR). 21 . The apparatus of claim 16 , wherein the one or more processors are further configured to perform beam training and send one or more beam reports to a centralized entity indicating signal measurements of m
Determining beam pairs · CPC title
the resource being in the space domain, e.g. beams · CPC title
Quality of the received signal, e.g. BER, SNR, water filling · CPC title
Time-frequency-space · CPC title
Two-way operation using the same type of signal, i.e. duplex · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.