Management system and management method

US12561189B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12561189-B2
Application numberUS-202418815375-A
CountryUS
Kind codeB2
Filing dateAug 26, 2024
Priority dateNov 29, 2023
Publication dateFeb 24, 2026
Grant dateFeb 24, 2026

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A management system manages one or more infrastructures, and a processor of the management system executes a plurality of consecutive processes on the infrastructure in response to a request, determines whether an error occurs during execution of the plurality of consecutive processes, selects a handling based on at least one of a classification of the error, an execution status of the processes, and a preset handling start condition when the error occurs, and executes the selected handling.

First claim

Opening claim text (preview).

What is claimed is: 1 . A management system that manages one or more infrastructures, the management system comprising: a processor, wherein the processor: executes a plurality of consecutive processes on the infrastructure in response to a request; determines whether an error occurs during execution of the plurality of consecutive processes; selects a handling based on at least one of a classification of the error, an execution status of the processes, and a preset handling start condition when the error occurs; executes the selected handling, wherein, when the classification of the error is temporary, the processor selects a retry for re-executing a process in which the error occurs, and wherein, when the classification of the error is not temporary, the processor selects a rollback for returning to a state before the execution of the plurality of consecutive processes, or selects a suspension in a state during the execution of the plurality of consecutive processes, performs, when the error occurs, trial calculation on a rollback completion time taken for the rollback and a request completion time taken for executing a process subsequent to the process in which the error occurs in the plurality of consecutive processes and compares the rollback completion time with the request completion time; and selects the handling based on a result of the comparison. 2 . The management system according to claim 1 , wherein the processor further: selects the rollback when the rollback completion time is shorter than the request completion time as the result of the comparison; and selects the suspension when the rollback completion time is longer than the request completion time as the result of the comparison. 3 . The management system according to claim 1 , wherein the handling start condition includes a state of the infrastructure, and when it is determined that the handling is executable based on the handling start condition, the processor selects the handling. 4 . The management system according to claim 1 , wherein when the suspension is selected, the processor presents a handling procedure to be performed by a user to the user. 5 . The management system according to claim 1 , wherein the processor selects the handling according to a preset priority order. 6 . The management system according to claim 5 , wherein the priority order includes at least one of a retry priority, a rollback priority, a user presentation priority, a candidate selection, an operation completion time priority, and a cost priority. 7 . A management method of a management system that manages one or more infrastructures, the management method comprising: by a processor included in the management system: executing a plurality of consecutive processes on the infrastructure in response to a request; determining whether an error occurs during execution of the plurality of consecutive processes; selecting a handling based on at least one of a classification of the error, an execution status of the processes, and a preset handling start condition when the error occurs; executing the selected handling, wherein, when the classification of the error is temporary, the processor selects a retry for re-executing a process in which the error occurs, and wherein, when the classification of the error is not temporary, the processor selects a rollback for returning to a state before the execution of the plurality of consecutive processes, or selects a suspension in a state during the execution of the plurality of consecutive processes, performing, when the error occurs, trial calculation on a rollback completion time taken for the rollback and a request completion time taken for executing a process subsequent to the process in which the error occurs in the plurality of consecutive processes and compares the rollback completion time with the request completion time; and selecting the handling based on a result of the comparison.

Assignees

Inventors

Classifications

  • at system level · CPC title

  • Content or structure details of the error report, e.g. specific table structure, specific error fields · CPC title

  • Remedial or corrective actions (recovery from an exception in an instruction pipeline G06F9/3861; by retry G06F11/1402; for recovering from a failure of a protocol instance or entity H04L69/40) · CPC title

  • Means for error signaling, e.g. using interrupts, exception flags, dedicated error registers · CPC title

  • Error filtering or prioritizing based on a policy defined by the user or on a policy defined by a hardware/software module, e.g. according to a severity level · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12561189B2 cover?
A management system manages one or more infrastructures, and a processor of the management system executes a plurality of consecutive processes on the infrastructure in response to a request, determines whether an error occurs during execution of the plurality of consecutive processes, selects a handling based on at least one of a classification of the error, an execution status of the processe…
Who is the assignee on this patent?
Hitachi Vantara Ltd
What technology area does this patent fall under?
Primary CPC classification G06F11/0793. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Feb 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 7 related publications on this page (citations in our corpus or others sharing the same primary CPC).