Container production management system and method
US-2020219112-A1 · Jul 9, 2020 · US
US12545450B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12545450-B2 |
| Application number | US-202218050579-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 28, 2022 |
| Priority date | Apr 30, 2020 |
| Publication date | Feb 10, 2026 |
| Grant date | Feb 10, 2026 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Provided is a production line management system for managing a manufacturing line for containers. The production line management system includes a first reading unit for reading an identification code applied to each of the containers when the container with the identification code indicating an identifier being information identifying the container passes through a first point on the manufacturing line, a second reading unit for reading the identification code applied to each of the containers after the first reading unit reads the identification code, and a computing unit for generating a database in which the identifier indicated by the identification code and relevant information about each of the containers are associated, and determining normality/abnormality of each of the containers by comparing the relevant information associated in the database with the identifier indicated by the identification code read in the second reading unit with predetermined setting information.
Opening claim text (preview).
What is claimed is: 1 . A production line management system for managing a manufacturing line for containers and/or a filling line for containers, the production line management system comprising: a first reading unit configured to read an identification code applied to each of the containers when each of the containers with the identification code indicating an identifier being information identifying each of the containers passes through a first point on the manufacturing line and/or the filling line; a second reading unit configured to read the identification code applied to each of the containers after the first reading unit reads the identification code; and a computing unit configured to generate a database in which the identifier indicated by the identification code and relevant information on each of the containers are associated, determine normality/abnormality of each of the containers by comparing the relevant information associated in the database with the identifier indicated by the identification code read by the second reading unit with setting information that is predetermined, the relevant information includes information for identifying a time of day when the first reading unit reads the identification code, and the setting information includes information regarding the time of day that sets a time period during which the containers should be manufactured and/or filled. 2 . The production line management system according to claim 1 , wherein the production line management system is the production line management system for managing a manufacturing line for containers, and the production line management system further comprises a code applying unit configured to apply the identification code to each of the containers. 3 . The production line management system according to claim 1 , wherein the second reading unit reads the identification code applied to each of the containers when each of the containers with the identification code passes through a second point downstream from the first point on the manufacturing line and/or the filling line. 4 . The production line management system according to claim 1 , wherein the set time has a predetermined time range, and the computing unit determines that the container is abnormal when the first reading time is within the predetermined time range. 5 . The production line management system according to claim 1 , wherein each of the containers is a can having a bottom portion, the bottom portion includes a main bottom portion being dome-shaped or flat and constituting a main portion of the bottom portion, an annular portion formed in a portion of the bottom portion other than the main bottom portion, having an annular shape when viewed from a direction of a can axis, and having at least one of a convex shape and a concave shape in a cross-section perpendicular to the direction of the can axis, and an individual identification code applied to a side portion of the annular portion and corresponding to an individual identifier being information for identifying an individual can. 6 . A production line management method for managing a manufacturing line for containers and/or a filling line for containers, the production line management method comprising: (a) reading an identification code applied to each of the containers when each of the containers with the identification code indicating an identifier being information identifying each of the containers passes through a first point on the manufacturing line and/or the filling line; (b) generating a database in which the identifier indicated by the identification code and relevant information about each of the containers are associated; (c) reading the identification code applied to each of the containers after the identification code is read in step (a); and (d) determining normality/abnormality of each of the containers by comparing the relevant information associated in the database with the identifier indicated by the identification code read in step (c) with setting information that is predetermined, wherein the relevant information includes information for identifying a time of day when a first reading unit reads the identification code, and the setting information includes information regarding the time of day that sets a time period during which the containers should be manufactured and/or filled. 7 . The production line management method according to claim 6 , wherein the production line management method is the production line management method for managing a manufacturing line for containers, and the production line management method further comprises applying the identification code to each of the containers. 8 . The production line management method according to claim 6 , wherein step (c) is reading the identification code applied to each of the containers when each of the containers with the identification code passes through a second point downstream from the first point on the manufacturing line and/or the filling line. 9 . The production line management method according to claim 6 , wherein the set time has a predetermined time range, and in step (d), each of the containers is determined to be abnormal when the first reading time is within the predetermined time range.
characterised by quality surveillance of production · CPC title
to container bodies {(B65C3/065 takes precedence)} · CPC title
responsive to absence, presence, abnormal feed, or misplacement of binding or wrapping material, containers, or packages · CPC title
Performance analysis of employees; Performance analysis of enterprise or organisation operations · CPC title
Logistics, e.g. warehousing, loading or distribution; Inventory or stock management · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.