System and method integrating an energy management system and yard planner system
US-2019367062-A1 · Dec 5, 2019 · US
US12545305B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12545305-B2 |
| Application number | US-202017912941-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 12, 2020 |
| Priority date | May 12, 2020 |
| Publication date | Feb 10, 2026 |
| Grant date | Feb 10, 2026 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A rail yard train-switching system includes train-moving machines and a control device. The train-moving machines each draw one of railroad trains in a rail yard. The control device transmits a traction command to the train-moving machines based on an operation schedule. The train-moving machines each move, based on the traction command transmitted from the control device, to a first location specified by the traction command to couple with an appropriate one of the railroad trains, and draw the one of the railroad trains from the first location to a second location specified by the traction command.
Opening claim text (preview).
The invention claimed is: 1 . A rail yard train-switching system comprising: a plurality of train-moving machines to draw a railroad train in a rail yard; and a controller comprising a processor and a memory and configured to select a train-moving machine of the plurality of train-moving machines to perform a switching operation based on states of the plurality of train-moving machines and to transmit a traction command to the selected train-moving machine based on an operation schedule of the switching operation including a start time for the traction command, wherein the selected train-moving machine moves, based on the traction command transmitted from the controller, to a first location specified by the traction command to couple with the railroad train, and draws the railroad train from the first location to a second location specified by the traction command, wherein the selected train-moving machine includes a target detection circuitry to detect an intrusion to be detected into the rail yard, the controller transmits a patrol command to the selected train-moving machine based on a preconfigured patrol schedule, and the selected train-moving machine patrols the rail yard while detecting presence or absence of the intrusion to be detected using the target detection circuitry, based on the patrol command transmitted from the controller. 2 . The rail yard train-switching system according to claim 1 , wherein the controller includes a route determination circuitry to determine a first travel route to the first location of the selected train-moving machine, and a second travel route from the first location to the second location of the selected train-moving machine, and a route establishment circuitry to cause a coordinator device to control a switch in the rail yard, based on the first travel route and on the second travel route determined by the route determination circuitry. 3 . The rail yard train-switching system according to claim 2 , wherein the controller transmits an entry prohibition command prohibiting ones of the plurality of the train-moving machines other than the selected train-moving machine that receives the traction command, among the plurality of the train-moving machines, from entering the first travel route and the second travel route. 4 . The rail yard train-switching system according to claim 1 , wherein the plurality of train-moving machines move, based on the traction command, in conjunction with each other a railroad train specified by the traction command. 5 . The rail yard train-switching system according to claim 1 , wherein the selected train-moving machine includes a sensor for inspecting the railroad train, and the controller or the selected train-moving machine inspects the railroad train based on a result of detection performed by the sensor. 6 . The rail yard train-switching system according to claim 5 , wherein the sensor is an image sensor, and the controller or the selected train-moving machine compares an image of the railroad train captured by the image sensor with an image of the railroad train in a normal condition to detect an anomaly of the railroad train.
Trackside optimisation of vehicle or train operation · CPC title
Automatic systems, e.g. controlled by train; Change-over to manual control · CPC title
Following schedules · CPC title
Obstacle detection · CPC title
Operations, e.g. scheduling or time tables · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.