Optimizing operation of a mixed fleet of hydraulic fracturing rigs

US12516592B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12516592-B2
Application numberUS-202217577852-A
CountryUS
Kind codeB2
Filing dateJan 18, 2022
Priority dateJan 18, 2022
Publication dateJan 6, 2026
Grant dateJan 6, 2026

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method may include receiving a set of inputs for operation of at least one electric hydraulic fracturing rig and at least one mechanical hydraulic fracturing rig of a hydraulic fracturing system. The method may further include optimizing operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig based on at least the set of inputs. The method may further include iterating the optimization using a cost function for an operation mode of the hydraulic fracturing system.

First claim

Opening claim text (preview).

What is claimed is: 1 . A hydraulic fracturing system, comprising: at least one electric hydraulic fracturing rig, wherein the at least one electric hydraulic fracturing rig includes an electric motor, a variable frequency drive, and a pump; at least one mechanical hydraulic fracturing rig; and a non-transitory computer-readable medium storing instructions that, when executed by a processor of the hydraulic fracturing system, causes the processor to: receive a set of inputs for operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, wherein the set of inputs for operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig include one or more of: a cost of fuel or power for each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, a total cost of ownership of each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, or a cost of emissions for each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, optimize operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig based on at least the set of inputs; iterate the optimization using at least one cost function for at least one operation mode of the hydraulic fracturing system; determine one or more outputs for the at least one electric hydraulic fracturing rig and one or more outputs for the at least one mechanical hydraulic fracturing rig, wherein the one or more outputs for the at least one electric hydraulic fracturing rig include one or more outputs for one or more of the electric motor, the variable frequency drive, or the pump; and to coordinate operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig (1) output the one or more outputs for the at least one electric hydraulic fracturing rig to the at least one electric hydraulic fracturing rig, and (2) output the one or more outputs for the at least one mechanical hydraulic fracturing rig to the at least one mechanical hydraulic fracturing rig, wherein the one or more outputs for the at least one electric hydraulic fracturing rig include a flow rate or a motor speed for the at least one electric hydraulic fracturing rig, and wherein the one or more outputs for the at least one mechanical hydraulic fracturing rig include a flow rate, an engine speed, or a transmission gear for the at least one mechanical hydraulic fracturing rig. 2 . The hydraulic fracturing system of claim 1 , wherein the optimizing of the operation further comprises: optimize the operation for a first electric hydraulic fracturing rig of the at least one electric hydraulic fracturing rig or a first mechanical hydraulic fracturing rig of the at least one mechanical fracturing rig. 3 . The hydraulic fracturing system of claim 2 , wherein the iterating of the optimization further comprises: process optimized operational parameters of the first electric hydraulic fracturing rig or the first mechanical hydraulic fracturing rig based on the cost function; and determine whether a score from the cost function exceeds a threshold. 4 . The hydraulic fracturing system of claim 3 , wherein, for each of the at least one electric hydraulic fracturing rig, the optimized operational parameters comprise at least one of: the flow rate, or the motor speed. 5 . The hydraulic fracturing system of claim 1 , wherein the hydraulic fracturing system further comprises at least one power source, and wherein the optimizing of the at least one electric hydraulic fracturing rig further comprises: optimizing the at least one electric hydraulic fracturing rig based on costs associated with the at least one power source. 6 . The hydraulic fracturing system of claim 1 , wherein, for each of the at least one mechanical hydraulic fracturing rig, optimized operational parameters comprise at least one of: the flow rate, the engine speed, or the transmission gear. 7 . The hydraulic fracturing system of claim 1 , wherein the set of inputs comprises at least one of: a desired flow rate at a well head, a discharge pressure, or the at least one operation mode. 8 . The hydraulic fracturing system of claim 1 , wherein the at least one cost function comprises: a fuel cost function, a carbon dioxide equivalent (CO2e) cost function, and a nitrogen oxide (NOX) cost function. 9 . The hydraulic fracturing system of claim 1 , wherein the at least one operation mode comprises: a fuel conservation mode, an emissions reduction mode, or a hybrid mode. 10 . The hydraulic fracturing system of claim 1 , wherein the at least one cost function comprises a nitrogen oxide (NOX) cost function. 11 . A method, comprising: receiving a set of inputs for operation of at least one electric hydraulic fracturing rig and at least one mechanical hydraulic fracturing rig of a hydraulic fracturing system, wherein the at least one electric hydraulic fracturing rig includes an electric motor, a variable frequency drive, and a pump, wherein the set of inputs for operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig include one or more of: a cost of fuel or power for each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, a total cost of ownership of each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig, or a cost of emissions for each of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig; optimizing operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig based on at least the set of inputs; iterating the optimization using a cost function for an operation mode of the hydraulic fracturing system, wherein the cost function includes a nitrogen oxide (NOx) cost function; and operating both the least one hydraulic fracturing rig and the at least one mechanical fracturing rig based at least in part on the optimized operation. 12 . The method of claim 11 , wherein the optimizing of the operation further comprises: optimizing the operation for a first electric hydraulic fracturing rig of the at least one electric hydraulic fracturing rig or a first mechanical hydraulic fracturing rig of the at least one mechanical fracturing rig. 13 . The method of claim 12 , wherein the iterating of the optimization further comprises: processing optimized operational parameters of the first electric hydraulic fracturing rig or the first mechanical hydraulic fracturing rig based on the cost function; and determining whether a score from the cost function exceeds a threshold. 14 . The method of claim 13 , wherein, for each of the at least one electric hydraulic fracturing rig, the optimized operational parameters comprise at least one of: a flow rate for the pump, or a motor speed for the electric motor, wherein, for each of the at least one mechanical hydraulic fracturing rig, the optimized operational parameters include a flow rate, an engine speed, or a transmission gear for the at least one mechanical hydraulic fracturing rig. 15 . The method of claim 11 , wherein the hydraulic fracturing system further comprises at least

Assignees

Inventors

Classifications

  • Computer models or simulations, e.g. for reservoirs under production, drill bits · CPC title

  • in which a variable is automatically adjusted to optimise the performance · CPC title

  • driven by internal-combustion engines · CPC title

  • the driving mechanisms being situated at ground level (F04B47/12 takes precedence) · CPC title

  • Combinations of two or more pumps · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12516592B2 cover?
A method may include receiving a set of inputs for operation of at least one electric hydraulic fracturing rig and at least one mechanical hydraulic fracturing rig of a hydraulic fracturing system. The method may further include optimizing operation of the at least one electric hydraulic fracturing rig and the at least one mechanical hydraulic fracturing rig based on at least the set of inputs.…
Who is the assignee on this patent?
Caterpillar Inc
What technology area does this patent fall under?
Primary CPC classification E21B43/2607. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Jan 06 2026 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).