Method for forming gourd petal component using electric pulse creep aging

US12460287B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12460287-B2
Application numberUS-202418784656-A
CountryUS
Kind codeB2
Filing dateJul 25, 2024
Priority dateJan 10, 2024
Publication dateNov 4, 2025
Grant dateNov 4, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for forming a gourd petal component is provided. The method includes obtaining a sheet material with M installation ends. Second wires are divided into M groups based on a cross-sectional area of each installation end. The sheet material is installed on a flexible mold. First wires and the second wires are connected to the sheet material and a current cabinet respectively. A power supply is turned on, electric pulses are applied to M areas including different installation ends for heating. When a temperature of the sheet material reaches a creep aging temperature, a load is applied on a top of the flexible mold to adsorb the sheet material. A creep aging forming is maintained for a preset time under the load and a high temperature. Once the load and the external current are unloaded, the gourd petal component is obtained after a cooling.

First claim

Opening claim text (preview).

What is claimed is: 1 . A method for forming a metal component using electric pulse creep aging, the metal component having a curved surface structure, and the metal component having an isosceles trapezoidal shape when the metal component is flattened, wherein the method comprises following steps: step (1), providing a sheet material, and processing the sheet material into a sheet material to be formed having a preset shape, wherein the sheet material to be formed comprises a main body and two stepped parts, the main body has a same structure as a flattened form of the metal component, the main body in the isosceles trapezoidal shape has a top surface corresponding to a shorter one of two parallel sides of the isosceles trapezoidal shape, a bottom surface corresponding to a longer one of the two parallel sides of the isosceles trapezoidal shape, and two slanted sides between the top surface and the bottom surface, and the two stepped parts are symmetrically arranged and located on the slanted sides of the main body, each of the stepped parts comprising a plurality of stepped platforms arranged parallel to the bottom surface of the main body, and two stepped platforms are in a same plane as the top surface of the main body, wherein all the stepped platforms and the top surface of the main body together form M installation ends of different heights, and M is a positive integer greater than or equal to 2; step (2), providing a plurality of first wires and a plurality of second wires, a total number of the first wires being the same as a total number of the second wires; and dividing all the second wires into M groups of second wires based on cross-sectional areas of the M installation ends such that each unit cross-sectional area of each installation end has a same number of second wires; step (3), installing the sheet material to be formed on a flexible mold, and connecting one end of each of the plurality of first wires to the bottom surface of the main body and connecting the other end of each first wire to a current cabinet, and connecting one end of each second wire in each group of second wires to the corresponding installation end and connecting the other end of each second wire to the current cabinet, wherein the plurality of first wires and the plurality of second wires are respectively arranged opposite to each other and are evenly distributed; step (4), turning on a power supply, applying electric pulses to M installation ends respectively, so that a current flows from one end of the sheet material to be formed to the other end of the sheet material to be formed to heat the sheet material to be formed, each area of the M installation ends having a regular shape and a current density applied to each area is the same; wherein in the step (4), electric pulses are applied to the M installation ends in a staggered manner, and when the electric pulses is applied to a target area, no electric pulses is applied to other areas, and a sum of the duty cycle of the pulse current applied to each area is less than 100%, wherein the target area is any one of the M installation ends, and the other areas are all areas of the M installation ends excluding the target area; step (5), when the temperature of the sheet material to be formed reaches a creep aging temperature, adjusting the flexible mold to form a target mold surface, the target mold surface matching a shape of the metal component; Step (6), maintaining a temperature generated by a load and the electric pulses for a preset time length to allow the sheet material to be formed to undergo a creep aging forming, and unloading the load and the current that is applied, and obtaining the metal component including an edge material after a rebound. 2 . The method for forming the metal component using electric pulse creep aging according to claim 1 , wherein the step (2) further comprises: based on a number of connection ports of a positive shunt bar and a number of connection ports of a negative shunt bar connected to the current cabinet, providing the plurality of first wires and the plurality of second wires of the same number; calculating a cross-sectional area of each of the installation ends separately; and determining a number of second wires to be installed at each installation end based on the total number of the second wires and the cross-sectional area of each installation end such that each unit cross-sectional area of each installation end has a same number of second wires. 3 . The method for forming the metal component using electric pulse creep aging according to claim 1 , wherein the cross-sectional area of each installation end is the same, a number of second wires installed at each installation end is the same, and the duty cycle of the pulse current in each area is the same. 4 . The method for forming the metal component using electric pulse creep aging according to claim 1 , wherein the sheet material to be formed is a 2195-T34 aluminum-lithium alloy, the corresponding creep aging temperature is 160˜185° C., and the preset time is 3˜25 h. 5 . The method for forming the metal component using electric pulse creep aging according to claim 1 , wherein pulse parameters corresponding to the electric pulse applied in step (4) are determined by a following method, comprising: determining pulse parameters for reaching a target temperature based on an experiment with given pulse parameters making for the sheet material to be formed, the target temperature being a preset temperature of a creep age forming, wherein the pulse parameters comprise a pulse frequency, a pulse current density, and a duty cycle; based on the pulse parameters that have been determined, maintaining a temperature of a creep age deformation at the target temperature by adjusting a current using a proportion integration differentiation (PID). 6 . The method for forming the gourd petal metal component using electric pulse creep aging according to claim 1 , wherein a number of the stepped platforms of each stepped part is 3 to 5. 7 . The method for forming the metal component using electric pulse creep aging according to claim 4 , wherein when the creep aging temperature is maintained at 185° C., the preset time length is 3 to 5 hours; when the creep aging temperature is maintained at 160° C., the preset time length is 20 to 25 hours. 8 . The method for forming the metal component using electric pulse creep aging according to claim 6 , wherein the two stepped platforms at the uppermost end and the top surface of the main body together serve as one installation end, and for other stepped platforms except the two stepped platforms at the uppermost end, each two stepped platforms at a same height serve as one installation end.

Assignees

Inventors

Classifications

  • Heating or cooling · CPC title

  • C22F1/04Primary

    of aluminium or alloys based thereon · CPC title

  • B21D31/00Primary

    Other methods for working sheet metal, metal tubes, metal profiles (deforming one surface of tubes helically by rolling B21H3/00; upsetting B21J5/08; working metal by removing material therefrom B23; embossing B44B) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12460287B2 cover?
A method for forming a gourd petal component is provided. The method includes obtaining a sheet material with M installation ends. Second wires are divided into M groups based on a cross-sectional area of each installation end. The sheet material is installed on a flexible mold. First wires and the second wires are connected to the sheet material and a current cabinet respectively. A power supp…
Who is the assignee on this patent?
Univ Central South
What technology area does this patent fall under?
Primary CPC classification C22F1/04. Mapped technology areas include Chemistry & Metallurgy.
When was this patent published?
Publication date Tue Nov 04 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).