System and method for adjusting leaching operations based on leach analytic data

US12443899B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12443899-B2
Application numberUS-202519064968-A
CountryUS
Kind codeB2
Filing dateFeb 27, 2025
Priority dateJun 27, 2022
Publication dateOct 14, 2025
Grant dateOct 14, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

First claim

Opening claim text (preview).

We claim: 1. A method comprising: forecasting, by one or more processors at a first time, mining production using a plurality of parameters and a simulation model, wherein the simulation model simulates adjustments to the plurality of parameters for leaching operations to optimize the mining production based on the plurality of parameters; backcasting, by the one or more processors at a second time, an expected mining production, wherein the backcasting uses a predictive model to determine deviations from the expected mining production as compared to observed results of the mining production by replacing forecast values associated with the forecasting the mining production with the observed results of the mining production; determining, by the one or more processors, an impact of one or more of the plurality of parameters on the deviations; refining, by the one or more processors, the one or more of the plurality of parameters in the predictive model based on the impact and the deviations to improve the forecasting the mining production; transmitting, by the one or more processors, an activation signal to a mining machine, wherein the activation signal is based on the forecasting the mining production; and activating, by the one or more processors, the mining machine in response to the activation signal, to continue and to optimize the mining production. 2. The method of claim 1 , wherein the forecasting the mining production further uses at least one of future production assumptions and the predictive model. 3. The method of claim 1 , further comprising adjusting, by the one or more processors, one or more of the plurality of parameters based on the deviations to obtain one or more adjusted parameters. 4. The method of claim 3 , further comprising re-forecasting, by the one or more processors, the mining production using the one or more adjusted parameters. 5. The method of claim 3 , wherein the one or more adjusted parameters at least partially compensate for the deviations from the expected mining production. 6. The method of claim 1 , wherein the mining machine pumps raffinate as part of leaching operations. 7. The method of claim 1 , further comprising simulating, by the one or more processors, adjusting of one or more of the plurality of parameters in the simulation model to optimize the mining production based on one or more of the plurality of parameters. 8. The method of claim 1 , wherein the first time is before the mining production is complete, and wherein the second time is after the first time and after the mining production is complete. 9. The method of claim 1 , further comprising training, by the one or more processors, the predictive model with historical data from the mining production to create a trained predictive model. 10. The method of claim 9 , wherein the historical data is for a stockpile during a time period. 11. The method of claim 9 , wherein the historical data comprises at least one of ore map data, mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement, blower data, PLS (pregnant leach solution) data, stockpile data, section mapping data, economic data or accounting data. 12. The method of claim 11 , wherein the ore map data comprises at least one of data from a column test predictive model for a column test, data from a test pad or section mapping data that includes creating a polygon map. 13. The method of claim 12 , wherein a machine learning model receives data from the column test to create the column test predictive model. 14. The method of claim 12 , wherein the column test provides output data including at least one of days under leach of a mineral, a percentage of each mineral reacted or an amount of acid consumed. 15. The method of claim 12 , wherein input data from the column test includes at least one of raffinate TFe, raffinate acid, leach additive, leach catalyst, raffinate Cu 2+ , DUL, XCu, QLT, application rate or cure acid. 16. The method of claim 1 , further comprising adding, by the one or more processors, future assumption data to the predictive model, wherein the future assumption data is based on mine plan data from sensors. 17. The method of claim 3 , wherein the adjusting the one or more of the plurality of parameters comprises changing ore routing in real-time. 18. The method of claim 1 , further comprising validating, by the one or more processors, the predictive model using test data with a time lag. 19. An article of manufacture including a non-transitory, tangible computer readable storage medium having instructions stored thereon that, in response to execution by one or more processors, cause the one or more processors to perform operations comprising: forecasting, by the one or more processors at a first time, mining production using a plurality of parameters and a simulation model, wherein the simulation model simulates adjustments to the plurality of parameters for leaching operations to optimize the mining production based on the plurality of parameters; backcasting, by the one or more processors at a second time, an expected mining production, wherein the backcasting uses a predictive model to determine deviations from the expected mining production as compared to observed results of the mining production by replacing forecast values associated with the forecasting the mining production with the observed results of the mining production; determining, by the one or more processors, an impact of one or more of the plurality of parameters on the deviations; refining, by the one or more processors, the one or more of the plurality of parameters in the predictive model based on the impact and the deviations to improve the forecasting the mining production; transmitting, by the one or more processors, an activation signal to a mining machine, wherein the activation signal is based on the forecasting the mining production; and activating, by the one or more processors, the mining machine in response to the activation signal, to continue and to optimize the mining production. 20. A system comprising: one or more processors; and one or more tangible, non-transitory memories configured to communicate with the one or more processors, the one or more tangible, non-transitory memories having instructions stored thereon that, in response to execution by the one or more processors, cause the one or more processors to perform operations comprising: forecasting, by the one or more processors at a first time, mining production using a plurality of parameters and a simulation model, wherein the simulation model simulates adjustments to the plurality of parameters for leaching operations to optimize the mining production based on the plurality of parameters; backcasting, by the one or more processors at a second time, an expected mining production, wherein the backcasting uses a predictive model to determine deviations from the expected mining production as compared to observed results of the mining production by replacing forecast values associated with the forecasting the mining production with the observed results of the mining production; determining, by the one or more processors, an impact of one or more of the plurality of parameters on the deviations; refining, by the one or more processors, the one or more of the plurality of parameters in the predictive model based on the impact and the deviations to improve the forecasting the mining production; transmitting, by the one or more process

Assignees

Inventors

Classifications

  • Resource planning, allocation, distributing or scheduling for enterprises or organisations · CPC title

  • with acids or salts thereof · CPC title

  • in inorganic acid solutions {, e.g. with acids generated in situ; in inorganic salt solutions other than ammonium salt solutions} · CPC title

  • Process control or regulation methods · CPC title

  • Agriculture; Fishing; Forestry; Mining · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12443899B2 cover?
The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of param…
Who is the assignee on this patent?
Freeport Minerals Corp
What technology area does this patent fall under?
Primary CPC classification G06Q10/04. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Oct 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).