Powder supply hopper pressurizing apparatus, gasifier unit, integrated gasification combined cycle and control method of powder supply hopper pressurizing apparatus

US12434923B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12434923-B2
Application numberUS-201916971074-A
CountryUS
Kind codeB2
Filing dateFeb 15, 2019
Priority dateFeb 23, 2018
Publication dateOct 7, 2025
Grant dateOct 7, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A powder supply hopper pressurizing apparatus including a first buffer tank in which pressurizing gas to be supplied to a powder supply hopper is accumulated at a predetermined pressure, a second buffer tank, a lower part pressure adjustment nitrogen system connected to the powder supply hopper, to supply the gas toward powder fuel stored in the powder supply hopper when supplying the powder fuel to a burner, and a control unit that controls the first buffer tank to pressurize the powder supply hopper to a first pressure and then controls the second buffer tank to pressurize the powder supply hopper to a second pressure, and where the control unit determines that one of the first buffer tank or the second buffer tank is non-usable, the control unit pressurizes the powder supply hopper by use of the first or second buffer tank that is operable, and the gas supply system.

First claim

Opening claim text (preview).

The invention claimed is: 1. A powder supply hopper pressurizing apparatus, comprising: a first buffer tank in which pressurizing gas to be supplied to a powder supply hopper that supplies pressurized powder fuel is configured to be accumulated at a predetermined pressure, a second buffer tank that is provided in parallel with the first buffer tank and in which the pressurizing gas to be supplied to the powder supply hopper is configured to be accumulated at a predetermined pressure, a gas supply system connected to the powder supply hopper, configured to supply the pressurizing gas toward the powder fuel stored in the powder supply hopper when supplying the pressurized powder fuel, a pressurizing gas manufacturing device that is configured to supply the pressurizing gas to the first buffer tank, the second buffer tank and the gas supply system, a first buffer tank inlet valve provided on a pressurizing gas manufacturing device side of the first buffer tank, a first buffer tank outlet valve provided on a powder supply hopper side of the first buffer tank, a second buffer tank inlet valve provided on a pressurizing gas manufacturing device side of the second buffer tank, a second buffer tank outlet valve provided on a powder supply hopper side of the second buffer tank, and a control unit programmed to control the first buffer tank to pressurize the powder supply hopper to a first pressure and to control the second buffer tank to pressurize the powder supply hopper to a second pressure, wherein in a case where the control unit determines that one of the first buffer tank or the second buffer tank is non-usable, the control unit is programmed to pressurize the powder supply hopper by use of the first buffer tank or the second buffer tank that is operable, and the gas supply system, and the control unit is programmed to determine that the first buffer tank is non-usable when the first buffer tank inlet valve or the first buffer tank outlet valve becomes out of order, indicates an abnormality, and does not operate, and to determine that the second buffer tank is non-usable when the second buffer tank inlet valve or the second buffer tank outlet valve becomes out of order, indicates an abnormality, and does not operate. 2. The powder supply hopper pressurizing apparatus according to claim 1 , further comprising a buffer tank pressure adjustment valve provided between the pressurizing gas manufacturing device, and the first buffer tank inlet valve and the second buffer tank inlet valve, to adjust a pressure to be supplied to the first buffer tank and the second buffer tank, wherein the control unit is programmed to control the buffer tank pressure adjustment valve to a closed state, when pressurizing the powder supply hopper by use of at least the gas supply system. 3. The powder supply hopper pressurizing apparatus according to claim 1 , further comprising: a plurality of pressure nozzles configured to supply the pressurizing gas to the powder supply hopper, a plurality of filters provided at tips of the pressure nozzles, respectively, to face a space of the powder supply hopper in which the powder fuel is stored and configured to pass the pressurizing gas therethrough, a powder supply hopper pressure sensor configured to detect a pressure in the powder supply hopper, and a pressurizing gas pressure sensor configured to detect a pressure on an upstream side of a branch point of the pressurizing gas to be branched at the branch point and supplied to the pressure nozzles, wherein the control unit is programmed to determine that damage occurs on the filters, in a case where a differential pressure between the pressure detected by the powder supply hopper pressure sensor and the pressure detected by the pressurizing gas pressure sensor is equal to or less than a predetermined value. 4. A gasifier unit comprising: the powder supply hopper pressurizing apparatus according to claim 1 , and a gasifier to which the powder fuel is supplied from the powder supply hopper pressurizing apparatus. 5. An integrated gasification combined cycle comprising: the gasifier unit according to claim 4 , a gas turbine configured to combust at least a part of raw syngas obtained by the gasifier unit to rotate and drive, a steam turbine configured to rotate and to drive with steam generated by a heat recovery steam generator into which turbine flue gas discharged from the gas turbine is introduced, and a generator rotatably coupled to the gas turbine and/or the steam turbine. 6. A control method of a powder supply hopper pressurizing apparatus comprising: a first buffer tank in which pressurizing gas to be supplied to a powder supply hopper that supplies pressurized powder fuel is configured to be accumulated at a predetermined pressure, a second buffer tank that is provided in parallel with the first buffer tank and in which the pressurizing gas to be supplied to the powder supply hopper is configured to be accumulated at a predetermined pressure, a gas supply system connected to the powder supply hopper, configured to supply the pressurizing gas toward the powder fuel stored in the powder supply hopper when supplying the pressurized powder fuel, a pressurizing gas manufacturing device that is configured to supply the pressurizing gas to the first buffer tank, the second buffer tank and the gas supply system, a first buffer tank inlet valve provided on a pressurizing gas manufacturing device side of the first buffer tank, a first buffer tank outlet valve provided on a powder supply hopper side of the first buffer tank, a second buffer tank inlet valve provided on a pressurizing gas manufacturing device side of the second buffer tank, and a second buffer tank outlet valve provided on a powder supply hopper side of the second buffer tank, the control method of the powder supply hopper pressurizing apparatus, comprising: controlling the first buffer tank to pressurize the powder supply hopper to a first pressure, and then controlling the second buffer tank to pressurize the powder supply hopper to a second pressure, and in a case where it is determined that the powder supply hopper cannot be pressurized to the first pressure by use of the pressurizing gas accumulated in the first buffer tank, pressurizing the powder supply hopper to the second pressure by use of the second buffer tank and the gas supply system, and in a case where it is determined that the powder supply hopper cannot be pressurized to the second pressure by use of the pressurizing gas accumulated in the second buffer tank, pressurizing the powder supply hopper to the second pressure by use of the first buffer tank and the gas supply system, determining that the first buffer tank is non-usable when the first buffer tank inlet valve or the first buffer tank outlet valve becomes out of order, indicates an abnormality, and does not operate, and determining that the second buffer tank is non-usable when the second buffer tank inlet valve or the second buffer tank outlet valve becomes out of order, indicates an abnormality, and does not operate.

Assignees

Inventors

Classifications

  • using a separate gas producer for gasifying the fuel before combustion · CPC title

  • Details of feeding means · CPC title

  • Fuel charging devices · CPC title

  • Sensors · CPC title

  • Devices for emptying otherwise than from the top · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12434923B2 cover?
A powder supply hopper pressurizing apparatus including a first buffer tank in which pressurizing gas to be supplied to a powder supply hopper is accumulated at a predetermined pressure, a second buffer tank, a lower part pressure adjustment nitrogen system connected to the powder supply hopper, to supply the gas toward powder fuel stored in the powder supply hopper when supplying the powder fu…
Who is the assignee on this patent?
Mitsubishi Hitachi Power Sys Ltd, Mitsubishi Heavy Ind Ltd
What technology area does this patent fall under?
Primary CPC classification B65G53/66. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Oct 07 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).