Operation control system for monitoring process control anomalies and applying countermeasures

US12422830B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12422830-B2
Application numberUS-202017772173-A
CountryUS
Kind codeB2
Filing dateOct 9, 2020
Priority dateOct 31, 2019
Publication dateSep 23, 2025
Grant dateSep 23, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An operation control system includes: a storing processing part configured to store collected information on abnormality in countermeasure progress information storage parts in which information on an abnormality or countermeasure information on a countermeasure to the abnormality is stored; an equipment abnormality monitor part configured to, when a length of a time period during which the abnormality continues exceeds a prescribed time period, update a state of the abnormality; a countermeasure monitor part configured to monitor a state of the countermeasure, and, when the state of the countermeasure changes, update the state of the countermeasure; and an output processing part configured to change how to output alarm information in accordance with the length of the time period during which the abnormality continues and the state of the countermeasure.

First claim

Opening claim text (preview).

The invention claimed is: 1. An operation control system, comprising: at least one memory storing at least one program; and at least one processor which when executing the at least one program configures the at least one processor to: collect information on an abnormality in a plurality of departments of a factory, a plurality of the departments having a hierarchical relationship therebetween, and store the collected information on the abnormality in at least one database in which abnormality information including information on a state of the abnormality is stored, or in which countermeasure information including information on a state of a countermeasure for the abnormality is stored; receive information on one of the departments requested by a user and information on a work category of the user, the work category being a position of the user in the department; store selection information which is information on, in the department and the work category, which one of the abnormality information stored in the abnormality information storage part and the countermeasure information stored in the countermeasure information is to be selected; monitor a length of a time period during which the abnormality continues, and, when the length of the time period exceeds a prescribed time period, update the state of the abnormality in the abnormality information; monitor the state of the countermeasure, and, when the state of the countermeasure changes, update the state of the countermeasure of the countermeasure information; select the abnormality information and the countermeasure information stored in the at least one database, based on the information received, and change how to output alarm information representing the state of the abnormality and the state of the countermeasure, in accordance with the state of the abnormality in the abnormality information and the state of the countermeasure in the countermeasure information; output the selected abnormality information and the selected countermeasure information as the alarm information; and receive abnormality registration information and, based on the stored countermeasure information, store a predetermined countermeasure and its contents along with the received abnormality registration information and execute the predetermined countermeasure by a department in response to receiving the abnormality registration information. 2. The operation control system according to claim 1 , wherein the at least one database stores therein information on which alarm information is outputted with respect to the department and an operation performed in the department or which alarm information is outputted with respect to the work category and the operation. 3. The operation control system according to claim 1 , wherein a priority order is displayed to a plurality of pieces of the alarm information having been outputted to the output part. 4. The operation control system according to claim 1 , wherein a department at which a countermeasure to an abnormality is currently taken is allowed to pass information on a state of a progress of the countermeasure, to another department. 5. The operation control system according to claim 1 , further comprising: a display, wherein the at least one processor is configured to display the outputted alarm information on a single screen in the display. 6. The operation control system according to claim 1 , further comprising a display; wherein the at least one processor is configured to: divide a screen of the display into two parts, make the alarm information on the department displayed on a first part of the screen, and make the alarm information on a department having the hierarchical relationship lower than the department displayed on a second part of the screen. 7. An operation control method performed by an operation control system, comprising the steps of: collecting information on an abnormality in a plurality of departments of a factory, a plurality of the departments having a hierarchical relationship therebetween; storing the collected information on the abnormality in at least one database of the operation control system, in which abnormality information including information on a state of the abnormality is stored, or in which countermeasure information including information on a state of a countermeasure for the abnormality is stored; receiving information on one of the departments requested by a user and information on a work category of the user, the work category being a position of the user in the department; storing selection information which is information on, in the department and the work category, which one of the abnormality information stored in the abnormality information storage part and the countermeasure information stored in the countermeasure information is to be selected; monitoring a length of a time period during which the abnormality continues; when the length of the time period exceeds a prescribed time period, updating the state of the abnormality of the abnormality information; monitoring the state of the countermeasure; when the state of the countermeasure changes, updating the state of the countermeasure of the countermeasure information; selecting the abnormality information and the countermeasure information stored in the at least one database, based on the information received, and changing how to output alarm information representing the state of the abnormality and the state of the countermeasure, in accordance with the state of the abnormality in the abnormality information and the state of the countermeasure in the countermeasure information; outputting the selected abnormality information and the selected countermeasure information as the alarm information; and receiving abnormality registration information and, based on the stored countermeasure information, storing a predetermined countermeasure and its contents along with the received abnormality registration information and executing the predetermined countermeasure by a department in response to receiving the abnormality registration information.

Assignees

Inventors

Classifications

  • CIM, total factory control · CPC title

  • Operations research, analysis or management · CPC title

  • Graphical display of process as function of detected alarm signals · CPC title

  • Manufacturing · CPC title

  • characterised by program execution · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12422830B2 cover?
An operation control system includes: a storing processing part configured to store collected information on abnormality in countermeasure progress information storage parts in which information on an abnormality or countermeasure information on a countermeasure to the abnormality is stored; an equipment abnormality monitor part configured to, when a length of a time period during which the abn…
Who is the assignee on this patent?
Hitachi Ind & Control Solutions Ltd
What technology area does this patent fall under?
Primary CPC classification G05B19/41835. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Sep 23 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 6 related publications on this page (citations in our corpus or others sharing the same primary CPC).