Engine system and methods for dispatching and controlling distributed energy resources

US12413093B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12413093-B2
Application numberUS-202217672206-A
CountryUS
Kind codeB2
Filing dateFeb 15, 2022
Priority dateFeb 15, 2022
Publication dateSep 9, 2025
Grant dateSep 9, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An engine system and methods for dispatching and controlling a plurality of distributed energy resources, e.g., a plurality of microgrids, involving: a server; a controller configured to operably couple with the server and the plurality of DERs; and at least one processor configured to operably couple with the server and the controller, the at least one processor configured to operate the server and the controller in an online mode and an offline mode, whereby at least one of forecast information and real-time information is providable, operational expense is reducible, and at least one new revenue generation avenue is establishable.

First claim

Opening claim text (preview).

What is claimed: 1. An engine system for dispatching and controlling a plurality of distributed energy resources (DERs) comprising a plurality of microgrids, the engine system comprising: a server; a controller configured to operably couple with the server and the plurality of DERs; and at least one processor configured to operably couple with the server and the controller, the at least one processor configured to operate the server and the controller in an online mode and an offline mode, the at least one processor further configured, when operating in the offline mode, to: operate the server to perform a first stage optimization by applying a first stage objective function with a first set of constraints to a first set of parameters at a first time of a predetermined time frame, thereby determining a first stage optimal peak shaving limit; and operate the server to perform a second optimization by applying a second stage objective function with a second set of constraints to a second set of parameters and the first stage optimal peak shaving limit at a second time of the pre-determined time frame, thereby determining a second stage soft constraint and at least one grid service recommendation, and the at least one processor further configured, when operating in the online mode, to: operate the server to perform a third stage optimization by applying a third stage objective function with a third set of constraints to a third set of parameters, the first stage optimal peak shaving limit, the second stage soft constraint, and the least one grid service recommendation at a third time of the pre-determined time frame, thereby determining a third stage soft constraint and at least one optimal dispatch point, and operate the controller to perform a fourth stage optimization by applying a fourth stage objective function with a fourth set of constraints to a fourth set of parameters, the first stage optimal peak shaving limit, the second stage soft constraint, the third stage soft constraint, and the at least one optimal dispatch point in real-time, thereby determining a final set of set-points, whereby at least one of forecast information and real-time information is providable, operational expense is reducible, and at least one new revenue generation avenue is establishable, wherein a first interval between the first time and the second time of the pre-determined time frame is greater than a second interval between the second time and the third time, and wherein the second interval between the second time and the third time is greater than a third interval between the second time and the time when the fourth stage optimization is performed. 2. The system of claim 1 , wherein the controller comprises a programmable logic controller (PLC). 3. The system of claim 1 , wherein the at least one processor is further configured to operate the controller to transmit the final set of set-points to the plurality of DERs. 4. The system of claim 1 , wherein the first stage objective function comprises minimization of an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgrid+max(Pgrid)*Dgrid. 5. The system of claim 1 , wherein the second stage objective function comprises minimization of an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgrid. 6. The system of claim 1 , wherein the third stage objective function comprises minimization of an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgrid. 7. The system of claim 1 , wherein the fourth stage objective function comprises a rule-based optimization algorithm, the rule-based optimization algorithm basing rules on at least one of node balance and stability of a distributed energy resource management system (DERMS). 8. A method of providing an engine system for dispatching and controlling a plurality of distributed energy resources (DERs) comprising a plurality of microgrids, the method comprising: providing a server; providing a controller configured to operably couple with the server and the plurality of DERs; and providing at least one processor configured to operably couple with the server and the controller, providing the at least one processor comprising configuring the at least one processor to operate the server and the controller in an online mode and an offline mode, providing the at least one processor further comprising configuring the at least one processor, when operating in the offline mode, to: operate the server to perform a first stage optimization by applying a first stage objective function with a first set of constraints to a first set of parameters at a first time of a pre-determined time frame, thereby determining a first stage optimal peak shaving limit; and operate the server to perform a second optimization by applying a second stage objective function with a second set of constraints to a second set of parameters and the first stage optimal peak shaving limit at a second time of the pre-determined time frame, thereby determining a second stage soft constraint and at least one grid service recommendation, and providing the at least one processor further comprising configuring the at least one processor, when operating in the online mode, to: operate the server to perform a third stage optimization by applying a third stage objective function with a third set of constraints to a third set of parameters, the first stage optimal peak shaving limit, the second stage soft constraint, and the least one grid service recommendation at a third time of the pre-determined time frame, thereby determining a third stage soft constraint and at least one optimal dispatch point; and operate the controller to perform a fourth stage optimization by applying a fourth stage objective function with a fourth set of constraints to a fourth set of parameters, the first stage optimal peak shaving limit, the second stage soft constraint, the third stage soft constraint, and the at least one optimal dispatch point in real-time, thereby determining a final set of set-points, whereby at least one of forecast information and real-time information is providable, operational expense is reducible, and at least one new revenue generation avenue is establishable, wherein a first interval between the first time and the second time of the pre-determined time frame is greater than a second interval between the second time and the third time, and wherein the second interval between the second time and the third time is greater than a third interval between the second time and the time when the fourth stage optimization is performed. 9. The method of claim 8 , wherein providing the controller comprises providing a programmable logic controller (PLC). 10. The method of claim 8 , wherein providing the at least one processor further comprises configuring the at least one processor to operate the controller to transmit the final set of set-points to the plurality of DERs. 11. The method of claim 8 , wherein applying the first stage objective function comprises minimizing an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgrid+max(Pgrid)*Dgrid. 12. The method of claim 8 , wherein applying the second stage objective function comprises minimizing an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgrid. 13. The method of claim 8 , wherein applying the third stage objective function comprises minimizing an expression comprising Σ t Σ g (Cg*Pgt+NLg*ugt+SUg*vgt+SDg*wgt)+Σ t Σ S (C SD *P dt )+Σ t Pgridt*Cgri

Assignees

Inventors

Classifications

  • Dispersed power generation using fossil fuels, e.g. diesel generators · CPC title

  • H02J13/14Primary

    the power network being locally controlled, e.g. home energy management systems [HEMS] · CPC title

  • Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks · CPC title

  • H02J3/381Primary

    Dispersed generators · CPC title

  • Load forecast, e.g. methods or systems for forecasting future load demand · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12413093B2 cover?
An engine system and methods for dispatching and controlling a plurality of distributed energy resources, e.g., a plurality of microgrids, involving: a server; a controller configured to operably couple with the server and the plurality of DERs; and at least one processor configured to operably couple with the server and the controller, the at least one processor configured to operate the serve…
Who is the assignee on this patent?
Eaton Intelligent Power Ltd
What technology area does this patent fall under?
Primary CPC classification H02J13/14. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Sep 09 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 6 related publications on this page (citations in our corpus or others sharing the same primary CPC).