Central plant optimization system with scalable asset models

US12400046B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12400046-B2
Application numberUS-202117334524-A
CountryUS
Kind codeB2
Filing dateMay 28, 2021
Priority dateJan 21, 2021
Publication dateAug 26, 2025
Grant dateAug 26, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system includes processors configured to perform operations including obtaining a base design resource production of a building asset and a base resource production data set comprising a base resource production of the building asset at a plurality of operating points, calculating a scaled resource production data set comprising a scaled resource production of the building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the building asset relative to the base design resource production of the building asset, generating a resource consumption data set comprising a resource consumption of the building asset at the plurality of operating points based on the scaled resource production data set, and initiating an automated action based on the scaled resource production data set and the resource consumption data set.

First claim

Opening claim text (preview).

What is claimed is: 1. A method comprising: obtaining a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculating a scaled resource production data set comprising a scaled resource production of a second building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the second building asset relative to the base design resource production of the first building asset; generating a resource consumption data set comprising a resource consumption of the second building asset at the plurality of operating points based on the scaled resource production data set; generating a model for the second building asset relating the resource consumption of the second building asset and the scaled resource production of the second building asset without requiring a model for the first building asset; and initiating an automated action based on the model for the second building asset. 2. The method of claim 1 , further comprising: obtaining a base coefficient of performance (COP) data set comprising a base COP of the first building asset at the plurality of operating points; and calculating a new COP data set comprising a new COP of the second building asset at the plurality of operating points by adjusting the base COP data set. 3. The method of claim 2 , wherein adjusting the base COP data set comprises: determining a delta between a base COP of the first building asset at base design conditions and a new COP of the second building asset at new design conditions; and adjusting the base COP of the first building asset at the plurality of operating points based on the delta between the base COP of the first building asset at base design conditions and the new COP of the second building asset at new design conditions. 4. The method of claim 2 , wherein generating the resource consumption data set comprises calculating the resource consumption of the second building asset at the plurality of operating points based on the scaled resource production of the second building asset at the plurality of operating points and the new COP of the second building asset at the plurality of operating points. 5. The method of claim 1 , a base design resource consumption and the base design resource production of the first building asset correspond to a resource consumption and a resource production of the first building asset at full load. 6. The method of claim 1 , wherein the first building asset and the second building asset comprise at least one of a water-cooled chiller, a heat recovery chiller, a dual-compressor chiller, a steam-driven chiller, an air-cooled chiller, a steam absorption chiller, a double bundle heat recovery chiller, a heat pump chiller, a cooling tower, a boiler, a heater, a steam generator, an air handling unit, or a rooftop unit. 7. The method of claim 1 , wherein the automated action comprises using the model for the second building asset to predict a future resource consumption of the second building asset as a function of a future resource production of the second building asset. 8. The method of claim 7 , wherein the automated action comprises controlling building equipment based on operational parameters predicted to achieve the future resource consumption or the future resource production. 9. A system comprising: one or more memory devices having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations comprising: obtaining a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculating a scaled resource production data set comprising a scaled resource production of a second building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the second building asset relative to the base design resource production of the first building asset; generating a resource consumption data set comprising a resource consumption of the second building asset at the plurality of operating points based on the scaled resource production data set; generating a model for the second building asset relating the resource consumption of the second building asset and the scaled resource production of the second building asset without requiring a model for the first building asset; and initiating an automated action based on the model for the second building asset. 10. The system of claim 9 , the operations further comprising: obtaining a base coefficient of performance (COP) data set comprising a base COP of the first building asset at the plurality of operating points; and calculating a new COP data set comprising a new COP of the second building asset at the plurality of operating points by adjusting the base COP data set. 11. The system of claim 10 , wherein adjusting the base COP data set comprises: determining a delta between a base COP of the first building asset at base design conditions and a new COP of the second building asset at new design conditions; and adjusting the base COP of the first building asset at the plurality of operating points based on the delta between the base COP of the first building asset at base design conditions and the new COP of the second building asset at new design conditions. 12. The system of claim 10 , wherein generating the resource consumption data set comprises calculating the resource consumption of the second building asset at the plurality of operating points based on the scaled resource production of the second building asset at the plurality of operating points and the new COP of the second building asset at the plurality of operating points. 13. The system of claim 9 , a base design resource consumption and the base design resource production of the first building asset correspond to a resource consumption and a resource production of the first building asset at full load. 14. The system of claim 9 , wherein the first building asset and the second building asset comprise at least one of a water-cooled chiller, a heat recovery chiller, a dual-compressor chiller, a steam-driven chiller, an air-cooled chiller, a steam absorption chiller, a double bundle heat recovery chiller, a heat pump chiller, a cooling tower, a boiler, a heater, a steam generator, an air handling unit, or a rooftop unit. 15. The system of claim 9 , wherein the automated action comprises using the model for the second building asset to predict a future resource consumption of the second building asset as a function of a future resource production of the second building asset. 16. The system of claim 15 , wherein the automated action comprises controlling building equipment based on operational parameters predicted to achieve the future resource consumption or the future resource production. 17. A non-transitory computer-readable medium having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to: obtain a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculate a scaled resource production data set comprising a scaled resource production

Assignees

Inventors

Classifications

  • not using a perturbation signal · CPC title

  • Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling · CPC title

  • Real estate management · CPC title

  • Energy or water supply · CPC title

  • Thermal analysis or thermal optimisation · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12400046B2 cover?
A system includes processors configured to perform operations including obtaining a base design resource production of a building asset and a base resource production data set comprising a base resource production of the building asset at a plurality of operating points, calculating a scaled resource production data set comprising a scaled resource production of the building asset at the plural…
Who is the assignee on this patent?
Tyco Fire & Security Gmbh
What technology area does this patent fall under?
Primary CPC classification G06F30/13. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Aug 26 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).