Systems and methods for adaptively tuning thresholds for fault detection in buildings
US-2019302709-A1 · Oct 3, 2019 · US
US12400046B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12400046-B2 |
| Application number | US-202117334524-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 28, 2021 |
| Priority date | Jan 21, 2021 |
| Publication date | Aug 26, 2025 |
| Grant date | Aug 26, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A system includes processors configured to perform operations including obtaining a base design resource production of a building asset and a base resource production data set comprising a base resource production of the building asset at a plurality of operating points, calculating a scaled resource production data set comprising a scaled resource production of the building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the building asset relative to the base design resource production of the building asset, generating a resource consumption data set comprising a resource consumption of the building asset at the plurality of operating points based on the scaled resource production data set, and initiating an automated action based on the scaled resource production data set and the resource consumption data set.
Opening claim text (preview).
What is claimed is: 1. A method comprising: obtaining a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculating a scaled resource production data set comprising a scaled resource production of a second building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the second building asset relative to the base design resource production of the first building asset; generating a resource consumption data set comprising a resource consumption of the second building asset at the plurality of operating points based on the scaled resource production data set; generating a model for the second building asset relating the resource consumption of the second building asset and the scaled resource production of the second building asset without requiring a model for the first building asset; and initiating an automated action based on the model for the second building asset. 2. The method of claim 1 , further comprising: obtaining a base coefficient of performance (COP) data set comprising a base COP of the first building asset at the plurality of operating points; and calculating a new COP data set comprising a new COP of the second building asset at the plurality of operating points by adjusting the base COP data set. 3. The method of claim 2 , wherein adjusting the base COP data set comprises: determining a delta between a base COP of the first building asset at base design conditions and a new COP of the second building asset at new design conditions; and adjusting the base COP of the first building asset at the plurality of operating points based on the delta between the base COP of the first building asset at base design conditions and the new COP of the second building asset at new design conditions. 4. The method of claim 2 , wherein generating the resource consumption data set comprises calculating the resource consumption of the second building asset at the plurality of operating points based on the scaled resource production of the second building asset at the plurality of operating points and the new COP of the second building asset at the plurality of operating points. 5. The method of claim 1 , a base design resource consumption and the base design resource production of the first building asset correspond to a resource consumption and a resource production of the first building asset at full load. 6. The method of claim 1 , wherein the first building asset and the second building asset comprise at least one of a water-cooled chiller, a heat recovery chiller, a dual-compressor chiller, a steam-driven chiller, an air-cooled chiller, a steam absorption chiller, a double bundle heat recovery chiller, a heat pump chiller, a cooling tower, a boiler, a heater, a steam generator, an air handling unit, or a rooftop unit. 7. The method of claim 1 , wherein the automated action comprises using the model for the second building asset to predict a future resource consumption of the second building asset as a function of a future resource production of the second building asset. 8. The method of claim 7 , wherein the automated action comprises controlling building equipment based on operational parameters predicted to achieve the future resource consumption or the future resource production. 9. A system comprising: one or more memory devices having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations comprising: obtaining a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculating a scaled resource production data set comprising a scaled resource production of a second building asset at the plurality of operating points by scaling the base resource production data set based on a new design resource production of the second building asset relative to the base design resource production of the first building asset; generating a resource consumption data set comprising a resource consumption of the second building asset at the plurality of operating points based on the scaled resource production data set; generating a model for the second building asset relating the resource consumption of the second building asset and the scaled resource production of the second building asset without requiring a model for the first building asset; and initiating an automated action based on the model for the second building asset. 10. The system of claim 9 , the operations further comprising: obtaining a base coefficient of performance (COP) data set comprising a base COP of the first building asset at the plurality of operating points; and calculating a new COP data set comprising a new COP of the second building asset at the plurality of operating points by adjusting the base COP data set. 11. The system of claim 10 , wherein adjusting the base COP data set comprises: determining a delta between a base COP of the first building asset at base design conditions and a new COP of the second building asset at new design conditions; and adjusting the base COP of the first building asset at the plurality of operating points based on the delta between the base COP of the first building asset at base design conditions and the new COP of the second building asset at new design conditions. 12. The system of claim 10 , wherein generating the resource consumption data set comprises calculating the resource consumption of the second building asset at the plurality of operating points based on the scaled resource production of the second building asset at the plurality of operating points and the new COP of the second building asset at the plurality of operating points. 13. The system of claim 9 , a base design resource consumption and the base design resource production of the first building asset correspond to a resource consumption and a resource production of the first building asset at full load. 14. The system of claim 9 , wherein the first building asset and the second building asset comprise at least one of a water-cooled chiller, a heat recovery chiller, a dual-compressor chiller, a steam-driven chiller, an air-cooled chiller, a steam absorption chiller, a double bundle heat recovery chiller, a heat pump chiller, a cooling tower, a boiler, a heater, a steam generator, an air handling unit, or a rooftop unit. 15. The system of claim 9 , wherein the automated action comprises using the model for the second building asset to predict a future resource consumption of the second building asset as a function of a future resource production of the second building asset. 16. The system of claim 15 , wherein the automated action comprises controlling building equipment based on operational parameters predicted to achieve the future resource consumption or the future resource production. 17. A non-transitory computer-readable medium having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to: obtain a base design resource production of a first building asset and a base resource production data set comprising a base resource production of the first building asset at a plurality of operating points; calculate a scaled resource production data set comprising a scaled resource production
not using a perturbation signal · CPC title
Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling · CPC title
Real estate management · CPC title
Energy or water supply · CPC title
Thermal analysis or thermal optimisation · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.