Automated work system

US12385220B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12385220-B2
Application numberUS-202118023454-A
CountryUS
Kind codeB2
Filing dateDec 13, 2021
Priority dateFeb 2, 2021
Publication dateAug 12, 2025
Grant dateAug 12, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An automated operation controller 45 of an automated work system 10 includes: a work status management section 452 that selects a work content according to a work DB 456 that records a work plan for a hydraulic excavator 1 and a work order in the work plan, creates an operation plan based on the selected work content and information on the surrounding environment measured by laser scanners 34 , and outputs a control signal to a vehicle body controller 41 based on the operation plan; and an abnormal object detection section 454 that detects an abnormal object present on a work site based on the information on the surrounding environment measured by the laser scanners 34 . When the execution of the operation plan is determined to be hindered by the presence of the abnormal object, the work status management section 452 selects another work content from the work plan.

First claim

Opening claim text (preview).

The invention claimed is: 1. An automated work system comprising: a surrounding environment measuring device that measures a surrounding environment of a work machine; and an automated operation controlling device that controls an automated operation of the work machine, wherein the automated operation controlling device includes: a work status management section that selects, according to a work order in a work plan obtained, a work content from the work plan, creates an operation plan for the work machine on a work site based on the selected work content and information on the surrounding environment measured by the surrounding environment measuring device, and outputs a control signal to a vehicle body controller disposed in the work machine based on the created operation plan, so as to manage a work status of the work machine; and an abnormal object detection section that detects an abnormal object present on the work site where the work plan is executed based on the information on the surrounding environment measured by the surrounding environment measuring device, and when an abnormal object is detected by the abnormal object detection section on the work site, the work status management section determines whether or not an execution of the operation plan is to be hindered by the presence of the abnormal object, and when the execution of the operation plan is determined to be hindered by the presence of the abnormal object, further determines whether or not a hindered work is dividable into a work executed in a range including the abnormal object and a work executed in a range not including the abnormal object by comparing a work amount in the range not including the abnormal object with a preliminarily determined threshold value, and when the hindered work is determined to be dividable, creates the operation plan for the range not including the abnormal object. 2. The automated work system according to claim 1 , wherein the work machine includes a traveling body and a working assembly, the automated operation controlling device further includes a computation section that computes a target trajectory of a distal end of the working assembly and a target trajectory of the traveling body based on the operation plan, and when the abnormal object that hinders at least one of the target trajectory of the distal end of the working assembly or the target trajectory of the traveling body computed by the computation section is present, the work status management section determines that the execution of the operation plan is to be hindered by the presence of the abnormal object. 3. The automated work system according to claim 1 , further comprising an object recording section that records at least one of information on a predicted present object predicted to be present on the work site or information on an unpredicted present object other than the predicted present object, wherein the object recording section is disposed in the automated operation controlling device or a server. 4. The automated work system according to claim 3 , wherein the abnormal object detection section detects an abnormal object present on the work site based on a concordance rate of the information on the surrounding environment measured by the surrounding environment measuring device and the information on an object recorded in the object recording section. 5. The automated work system according to claim 1 , further comprising a work recording section that records the work plan, wherein the work plan includes a work content and a work order executed by at least one work machine, and the work recording section is disposed in the automated operation controlling device or a server. 6. The automated work system according to claim 1 further comprising an information display device that displays the work content selected by the work status management section, an executing range of the work, and the information on the abnormal object that is to hinder the execution of the operation plan. 7. The automated work system according to claim 6 , further comprising an information input device that accepts input from at least a work administrator, wherein, when the execution of the operation plan is determined to be hindered by the presence of the abnormal object, and continuation of work is instructed by the input to the information input device by the work administrator, the work status management section creates a work plan for the range not including the abnormal object. 8. The automated work system according to claim 7 , wherein after the work machine is switched to manual control by the work administrator and the abnormal object is removed from the work site, and when an instruction for starting work of the work machine is given by the work administrator and a human is not detected around the work machine based on the information on the surrounding environment measured by the surrounding environment measuring device, the work status management section selects another work from the work plan.

Assignees

Inventors

Classifications

  • with follow-up actions to control the work tool, e.g. controller · CPC title

  • Remotely operated machines, e.g. unmanned vehicles (E02F3/8866 takes precedence) · CPC title

  • for preventing damage to underground objects during excavation, e.g. indicating buried pipes or the like (detection of pipes in the ground F16L1/11) · CPC title

  • E02F9/2054Primary

    Fleet management · CPC title

  • E02F3/437Primary

    providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12385220B2 cover?
An automated operation controller 45 of an automated work system 10 includes: a work status management section 452 that selects a work content according to a work DB 456 that records a work plan for a hydraulic excavator 1 and a work order in the work plan, creates an operation plan based on the selected work content and information on the surrounding environment measured by laser sca…
Who is the assignee on this patent?
Hitachi Construction Mach Co
What technology area does this patent fall under?
Primary CPC classification E02F9/2054. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Aug 12 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).