Method for constructing triple-shell tank

US12358713B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12358713-B2
Application numberUS-202218724030-A
CountryUS
Kind codeB2
Filing dateDec 21, 2022
Priority dateDec 27, 2021
Publication dateJul 15, 2025
Grant dateJul 15, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for constructing a triple shell tank including an inner tank, an intermediate tank, and an outer tank each having a roof and a side plate. According to the construction method, an intermediate tank roof is temporarily fixed onto an inner tank roof to form a connected roof body, a guide side plate having a predetermined height is installed around the connected roof body, a sealing process is performed between an outer peripheral edge of the connected roof body and an inner face of the guide side plate to form a sealed space, air is supplied to the sealed space to air-raise the connected roof body, at least a part of an outer tank roof is formed on the intermediate tank roof of the air-raised connected roof body, and an outer tank side plate is installed around the guide side plate.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for constructing a triple shell tank including an inner tank, an intermediate tank, and an outer tank each having a roof and a side plate, the method comprising: temporarily fixing an intermediate tank roof onto an inner tank roof to form a connected roof body; installing a guide side plate having a predetermined height around the connected roof body; performing a sealing process between an outer peripheral edge of the connected roof body and an inner face of the guide side plate to form a sealed space, and supplying air to the sealed space to air-raise the connected roof body; and forming at least a part of an outer tank roof on the intermediate tank roof of the air-raised connected roof body, and installing an outer tank side plate around the guide side plate. 2. The method for constructing a triple shell tank according to claim 1 , wherein a temporary support is placed on the intermediate tank roof of the air-raised connected roof body; and the outer tank roof is installed on the temporary support, and subsequently the outer tank roof and the outer tank side plate are fixed. 3. The method for constructing a triple shell tank according to claim 1 , wherein the guide side plate is an inner tank side plate, and an intermediate tank side plate having a predetermined height is installed around the inner tank side plate, in the air-raising, a sealing process is performed between an outer peripheral edge of the inner tank roof and an inner face of the inner tank side plate to form a sealed space, and after the air-raising, the inner tank roof and the inner tank side plate are fixed, subsequently the temporary fixing of the connected roof body is released to fix the intermediate tank roof and the intermediate tank side plate. 4. The method for constructing a triple shell tank according to claim 3 , wherein an inner tank bottom plate constituting a bottom part of a region surrounded by the inner tank side plate is formed at least before the air-raising. 5. The method for constructing a triple shell tank according to claim 3 , wherein the inner tank side plate, the intermediate tank side plate, and the outer tank side plate are assembled by stacking a plurality of circular steps formed by arranging a plurality of side plate pieces in a circular ring shape, and the circular step of the inner tank side plate, the circular step of the intermediate tank side plate, and the circular step of the outer tank side plate are stacked in parallel. 6. The method for constructing a triple shell tank according to claim 3 , wherein the inner tank side plate and the intermediate tank side plate are assembled by stacking a plurality of circular steps formed by arranging a plurality of side plate pieces in a circular ring shape, and the circular step of the inner tank side plate is assembled to an uppermost step prior to the intermediate tank side plate to fix the circular step of the uppermost step and the outer peripheral edge of the inner tank roof. 7. The method for constructing a triple shell tank according to claim 1 , wherein the guide side plate is an intermediate tank side plate, in the air-raising, a sealing process is performed between an outer peripheral edge of the intermediate tank roof and an inner face of the intermediate tank side plate to form a sealed space, after the air-raising, an inner tank side plate having a predetermined height is installed inside the intermediate tank side plate, and the intermediate tank roof and the intermediate tank side plate are fixed, subsequently the temporary fixing of the connected roof body is released to fix the inner tank roof and the inner tank side plate. 8. The method for constructing a triple shell tank according to claim 7 , wherein an intermediate tank bottom plate constituting a bottom part of a region surrounded by the intermediate tank side plate is formed at least before the air-raising. 9. The method for constructing a triple shell tank according to claim 3 , wherein the intermediate tank side plate and the outer tank side plate are assembled by stacking a plurality of circular steps formed by arranging a plurality of side plate pieces in a circular ring shape, and the circular step of the intermediate tank side plate and the circular step of the outer tank side plate are stacked in parallel. 10. The method for constructing a triple shell tank according to claim 3 , wherein the outer tank side plate is installed prior to installation of the inner tank side plate after the air-raising. 11. The method for constructing a triple shell tank according to claim 1 , wherein the guide side plate is an intermediate tank side plate, in the air-raising, a sealing process is performed between an outer peripheral edge of the inner tank roof and an inner face of the intermediate tank side plate to form a sealed space, after the air-raising, an inner tank side plate having a predetermined height is installed inside the intermediate tank side plate, and the intermediate tank roof and the intermediate tank side plate are fixed, subsequently the temporary fixing of the connected roof body is released to fix the inner tank roof and the inner tank side plate. 12. The method for constructing a triple shell tank according to claim 11 , wherein the outer peripheral edge of the inner tank roof includes an inner tank knuckle plate, and the sealing process includes a process of attaching a temporary roof closing a space between the inner tank knuckle plate and the inner face of the intermediate tank side plate to the inner tank knuckle plate. 13. The method for constructing a triple shell tank according to claim 1 , wherein the air-raising is executed in a state where an outer tank roof piece constituting the outer tank roof is mounted on the intermediate tank roof of the connected roof body. 14. The method for constructing a triple shell tank according to claim 1 , wherein a first construction opening, which is a construction entrance, is opened in the outer tank side plate when the outer tank side plate is installed, a second construction opening is opened in the inner tank side plate when the inner tank side plate is installed, and a third construction opening is opened in the intermediate tank side plate when the intermediate tank side plate is installed, the second construction opening is sealed after completion of work inside the inner tank, and then the third construction opening is sealed after completion of work inside the intermediate tank, and subsequently, the first construction opening is sealed after completion of work inside the outer tank.

Assignees

Inventors

Classifications

  • with a vertical axis · CPC title

  • formed with double walls, i.e. hollow · CPC title

  • Supports · CPC title

  • with features of cylindrical curvature · CPC title

  • cylindrical (B65D88/12 takes precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12358713B2 cover?
A method for constructing a triple shell tank including an inner tank, an intermediate tank, and an outer tank each having a roof and a side plate. According to the construction method, an intermediate tank roof is temporarily fixed onto an inner tank roof to form a connected roof body, a guide side plate having a predetermined height is installed around the connected roof body, a sealing proce…
Who is the assignee on this patent?
Kawasaki Heavy Ind Ltd
What technology area does this patent fall under?
Primary CPC classification B65D88/02. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jul 15 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).