Systems and methods for monitoring and controlling industrial processes
US-2024361756-A1 · Oct 31, 2024 · US
US12358046B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12358046-B2 |
| Application number | US-202117916138-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 8, 2021 |
| Priority date | Apr 9, 2020 |
| Publication date | Jul 15, 2025 |
| Grant date | Jul 15, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A dynamic production planning method for a continuous casting plant for casting a strand with a production system which has a predefined production plan, which method includes comparing target production parameters with actual production parameters. If the actual production parameters deviate from the target production parameters, a strand image is created on the basis of actual production parameters. With the aid of the calculated strand image, a check is carried out within the predefined production plan and, if possible, a new production plan is created. If no solution can be found from the predefined production plan, the strand image is transmitted to a production planning system. The production planning system creates a new production plan from all available orders on the basis of a predefined optimization criterion. The new production plan is subsequently transmitted to the production system.
Opening claim text (preview).
The invention claimed is: 1. A dynamic production planning method for a continuous casting plant for casting a strand from a melt with a production system which has a predefined production plan, comprising: determining deviation of actual production parameters from setpoint production parameters by comparing the setpoint production parameters with the actual production parameters, responsive to the determination of deviation of the actual production parameters from the setpoint production parameters, creating a strand image on the basis of the actual production parameters, wherein the strand image comprises the strand which has already been cast and has not yet been cut, and at least that strand which is obtained on the basis of a residual weight in the continuous casting plant's tundish and predefined parameters, attempting to reconfigure the predefined production plan to compensate for the determined deviation of the actual production parameters from the set point production parameters, responsive to a determination that the predefined production plan cannot be reconfigured to compensate for the determined deviation, transmitting the strand image to a production planning system, creating with the production planning system a new production plan from all available orders on the basis of a predefined optimization criterion, transmitting the new production plan to the production system, wherein the predefined production plan is a cutting plan with a setpoint length, minimum length, maximum length, width and/or thickness, and wherein the optimization criterion is a maximum possible sales revenue with a minimum possible storage period or a maximum possible sales revenue with the prioritization of low-priority orders. 2. The dynamic production planning method for a continuous casting plant for casting a strand from a melt as claimed in claim 1 , wherein the strand image is formed from at least one of the following parameters: width profile on the strand, width profile in the tundish, scrap positions and lengths, quality prediction for the strand, product limits of a calculated solution for product specification, target quality of specified products. 3. The dynamic production planning method for a continuous casting plant for casting a strand from a melt as claimed in claim 1 , wherein a unique key, is calculated on the basis of the strand image and used in data exchange with the production system and the production planning system. 4. The dynamic production planning method for a continuous casting plant for casting a strand from a melt as claimed in claim 3 , wherein the unique key is a hash code. 5. The dynamic production planning method for a continuous casting plant for casting a strand from a melt as claimed in claim 1 , wherein a connection between the production system and the production planning system is a decoupled bi-directional connection. 6. The dynamic production planning method for a continuous casting plant for casting a strand from a melt as claimed in claim 1 , wherein the actual production parameters and the setpoint production parameters are a casting speed of the strand, a casting level, a mold width, a strand cooling parameter, a temperature of the melt and/or a casting powder thickness.
characterised by job scheduling, process planning, material flow · CPC title
Accessories for subsequent treating or working cast stock in situ (rolling immediately subsequent to continuous casting B21B1/46, B21B13/22) · CPC title
Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS] · CPC title
for cutting cast stock · CPC title
for cutting · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.