Wood plank and method of manufacturing the same
US-2024227270-A1 · Jul 11, 2024 · US
US12311405B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12311405-B2 |
| Application number | US-202017112723-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 4, 2020 |
| Priority date | Dec 6, 2019 |
| Publication date | May 27, 2025 |
| Grant date | May 27, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
In a method and a device for producing a powder coating melt, firstly a first powder coating melt is produced from a powder coating premix by a screw machine. Powder coating particles are supplied to the first powder coating melt. Then a second powder coating melt is produced by mixing the first powder coating melt and the powder coating particles by the screw machine. This allows a simple, gentle and efficient recycling of powder coating particles, in particular of so-called off-spec powder coating particles.
Opening claim text (preview).
What is claimed is: 1. A method for producing a powder coating melt, comprising the following steps: providing a screw machine with a housing, a first supply opening for supplying a powder coating premix into the housing, and a second supply opening arranged downstream for supplying powder coating particles into the housing, producing a first powder coating melt from the powder coating premix by means of the screw machine, supplying the powder coating particles into the first powder coating melt present in the screw machine by means of a supply device for supplying the powder coating particles to the screw machine through the second supply opening, wherein the supply device comprises a supply screw machine, wherein the supply screw machine has at least two screw shafts, wherein the supply screw machine is configured as a side feed machine and is connected to a side of the housing of the screw machine, wherein the supply device comprises a supply insert, wherein the supply screw machine is connected to the screw machine by means of the supply insert, wherein the supply insert comprises a supply channel component and a flange attached thereto, wherein the flange is attached to a housing of the supply screw machine and the supply channel component is arranged in an associated housing opening of the housing of the screw machine, cooling the supply screw machine by means of a cooling device, wherein the supply insert is cooled by means of the cooling device, and producing a second powder coating melt by mixing the first powder coating melt and the powder coating particles by means of the screw machine, wherein bores are formed in the supply channel component and the at least two screw shafts of the supply screw machine extend into said bores. 2. The method according to claim 1 , wherein the supplied powder coating particles each have a maximum particle dimension A max , wherein for at least 50% of the supplied powder coating particles: A max <100 μm. 3. The method according to claim 1 , wherein the supplied powder coating particles each have a maximum particle dimension A max , wherein for at least 50% of the supplied powder coating particles: A max >1 μm. 4. The method according to claim 1 , wherein the powder coating particles are melted before the second powder coating melt is discharged from the screw machine. 5. The method according to claim 1 , wherein the powder coating particles are supplied downstream of a plasticization zone of the screw machine. 6. The method according to claim 1 , wherein the powder coating particles are supplied in a supply zone of the screw machine which is arranged downstream of a plasticization zone and upstream of a mixing zone. 7. The method according to claim 1 , wherein the supply device comprises a dosing unit. 8. The method according to claim 1 , wherein the powder coating particles are provided by a separating device. 9. The method according to claim 1 , wherein at least one of the housing, at least one screw shaft and an inlet hopper of the supply screw machine is cooled. 10. The method according to claim 1 , wherein the powder coating particles are supplied by means of a dosing unit. 11. The method according to claim 10 , wherein the dosing unit is cooled. 12. The method according to claim 1 , wherein at least one of an inlet hopper, the housing and at least one screw shaft of the supply screw machine is cooled by means of the cooling device. 13. The method according to claim 1 , wherein the supply insert comprises a cooling channel which is connected to the cooling device. 14. The method according to claim 13 , wherein the cooling channel extends through the flange and through the supply channel component of the supply insert. 15. The method according to claim 1 , wherein said bores are mutually penetrating. 16. The method according to claim 1 , wherein the supply insert forms the second supply opening. 17. A device for producing a powder coating melt, comprising a screw machine with a housing, a first supply opening for supplying a powder coating premix into the housing, and a second supply opening arranged downstream for supplying powder coating particles into the housing, and a supply device for supplying the powder coating particles to the screw machine through the second supply opening, wherein the supply device comprises a supply screw machine, wherein the supply screw machine has at least two screw shafts, wherein the supply screw machine is configured as a side feed machine and is connected to a side of the housing of the screw machine, wherein the supply device comprises a supply insert, wherein the supply screw machine is connected to the screw machine by means of the supply insert, wherein the supply insert comprises a supply channel component and a flange attached thereto, wherein the flange is attached to a housing of the supply screw machine and the supply channel component is arranged in an associated housing opening of the housing of the screw machine, a cooling device for cooling the supply screw machine, wherein the supply insert is cooled by means of the cooling device, wherein bores are formed in the supply channel component and the at least two screw shafts of the supply screw machine extend into said bores. 18. The device according to claim 17 , wherein the second supply opening is arranged between a plasticization zone and a discharge opening of the screw machine. 19. The device according to claim 17 , wherein the supply device comprises a dosing unit. 20. The device according to claim 19 , wherein the dosing unit is cooled by means of the cooling device. 21. The device according to claim 17 , wherein at least one of an inlet hopper, the housing and at least one screw shaft of the supply screw machine is cooled by means of the cooling device. 22. The device according to claim 17 , wherein the supply insert comprises a cooling channel which is connected to the cooling device. 23. The device according to claim 22 , wherein the cooling channel extends through the flange and through the supply channel component of the supply insert. 24. The device according to claim 17 , wherein the supply insert forms the second supply opening. 25. A device for producing a powder coating melt, comprising a screw machine with a housing, a first supply opening for supplying a powder coating premix into the housing, and a second supply opening arranged downstream for supplying powder coating particles into the housing, and a supply device for supplying the powder coating particles to the screw machine through the second supply opening, wherein the supply device comprises a supply screw machine, wherein the supply screw machine has at least two screw shafts, wherein the supply screw machine is configured as a side feed machine and is connected to a side of the housing of the screw machine, wherein the supply device comprises a supply insert, wherein the supply screw machine is connected to the screw machine by means of the supply insert, wherein the supply insert comprises a supply channel component and a flange attached thereto, wherein the flange is attached to a housing of the supply screw machine and the supply channel component is arranged in an associated housing opening of the housing of the screw machine, a cooling device for cooling the supply screw machine, wherein the supply insert is cooled by means
Cooling with air · CPC title
Storage, supply or control of the application of particulate material; Recovery of excess particulate material · CPC title
Thermal treatment of the extrusion moulding material or of preformed parts or layers, e.g. by heating or cooling · CPC title
in a location other than through a barrel, e.g. through a screw · CPC title
of materials · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.