Flow sate transfer for live migration of virtual machine
US-2018139101-A1 · May 17, 2018 · US
US12301671B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12301671-B2 |
| Application number | US-202418413370-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 16, 2024 |
| Priority date | Sep 14, 2020 |
| Publication date | May 13, 2025 |
| Grant date | May 13, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
One aspect of the present invention is an information processing system that includes a computing machine installed in a computing machine base, and a first transmitting/receiving apparatus connected to the computing machine, a second transmitting/receiving apparatus installed in a user base that is used by a user, and a device connected to the second transmitting/receiving apparatus, and a control apparatus configured to control connection between the first transmitting/receiving apparatus and the second transmitting/receiving apparatus. In the information processing system, the control apparatus is configured to change the connection between the first transmitting/receiving apparatus and the second transmitting/receiving apparatus, and copy the state of the pre-change computing machine from the pre-change computing machine into the post-change computing machine.
Opening claim text (preview).
The invention claimed is: 1. An information processing system comprising: a computing machine installed in a computing machine base, and a first transmitting/receiving apparatus connected to the computing machine; a second transmitting/receiving apparatus installed in a user base that is used by a user, and a device connected to the second transmitting/receiving apparatus; and a control apparatus configured to control connection between one first transmitting/receiving apparatus among a plurality of the first transmitting/receiving apparatuses and the second transmitting/receiving apparatus, wherein the control apparatus is configured to change a first connection between the second transmitting/receiving apparatus and the first transmitting/receiving apparatus to a second connection between the second transmitting/receiving apparatus and another one of the first transmitting/receiving apparatuses, and copy computing machine state information about a pre-change computing machine that is the computing machine before the change, into a post-change computing machine that is the computing machine after the change, before the user starts using the post-change computing machine, on a basis of a movement prediction or a change prediction about the user, the computing machine state information being copied from the pre-change computing machine, and the control apparatus is configured to make the change prediction about the user, on a basis of an operating rate of the pre-change computing machine. 2. The information processing system according to claim 1 , further comprising: a first network configured to perform data communication among a plurality of the computing machines; and a second network configured to perform communication between the first transmitting/receiving apparatus and the second transmitting/receiving apparatus, wherein the control apparatus is configured to change, via the second network, a first connection between the second transmitting/receiving apparatus and the first transmitting/receiving apparatus to a second connection between the second transmitting/receiving apparatus and another one of the first transmitting/receiving apparatuses, and copy the computing machine state information from the pre-change computing machine into the post-change computing machine via the first network. 3. The information processing system according to claim 1 , wherein the computing machine state information is information regarding a state of the computing machine used by the user before the change, and is at least one piece of CPU state information, GPU state information, memory state information, and storage state information, or an appropriate combination of CPU state information, GPU state information, memory state information, and storage state information, and the control apparatus is configured to copy the computing machine state information from the pre-change computing machine into the post-change computing machine. 4. The information processing system according to claim 1 , wherein the control apparatus is configured to make a movement prediction about the user, on a basis of location information detected by a location detector being carried by the user. 5. An information processing method implemented in an information processing system that includes: a computing machine installed in a computing machine base, and a first transmitting/receiving apparatus connected to the computing machine; a second transmitting/receiving apparatus installed in a user base that is used by a user, and a device connected to the second transmitting/receiving apparatus; and a control apparatus configured to control connection between one first transmitting/receiving apparatus among a plurality of the first transmitting/receiving apparatuses and the second transmitting/receiving apparatus, the information processing method comprising by the control apparatus, changing a first connection between the second transmitting/receiving apparatus and the first transmitting/receiving apparatus to a second connection between the second transmitting/receiving apparatus and another one of the first transmitting/receiving apparatuses, and copying computing machine state information about a pre-change computing machine that is the computing machine before the change, into a post-change computing machine that is the computing machine after the change, before the user starts using the post-change computing machine, on a basis of a movement prediction or a change prediction about the user, the computing machine state information being copied from the pre-change computing machine, wherein the information processing method further comprises, by the control apparatus, making the change prediction about the user, on a basis of an operating rate of the pre-change computing machine. 6. A non-transitory computer readable storage medium storing a program that is executed in an information processing system that includes: a computing machine installed in a computing machine base, and a first transmitting/receiving apparatus connected to the computing machine; a second transmitting/receiving apparatus installed in a user base that is used by a user, and a device connected to the second transmitting/receiving apparatus; and a control apparatus configured to control connection between one first transmitting/receiving apparatus among a plurality of the first transmitting/receiving apparatuses and the second transmitting/receiving apparatus, the program causing a computer of the control apparatus to: change a first connection between the second transmitting/receiving apparatus and the first transmitting/receiving apparatus to a second connection between the second transmitting/receiving apparatus and another one of the first transmitting/receiving apparatuses; and copy computing machine state information about a pre-change computing machine that is the computing machine before the change, into a post-change computing machine that is the computing machine after the change, before the user starts using the post-change computing machine, on a basis of a movement prediction or a change prediction about the user, the computing machine state information being copied from the pre-change computing machine, wherein the program further causes the computer of the control apparatus to make the change prediction about the user, on a basis of an operating rate of the pre-change computing machine.
based on copy from other elements · CPC title
Configuration by using pre-existing information, e.g. using templates or copying from other elements · CPC title
for predicting network behaviour · CPC title
Digital computers in general (details G06F1/00 – G06F13/00); Data processing equipment in general · CPC title
Setup of application sessions (admission control or resource allocation in data switching networks H04L47/70) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.