Method and Device for Planning a Specific Process System
US-2021048800-A1 · Feb 18, 2021 · US
US12284083B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12284083-B2 |
| Application number | US-202318474668-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 26, 2023 |
| Priority date | Sep 28, 2022 |
| Publication date | Apr 22, 2025 |
| Grant date | Apr 22, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for automatic generation of a specification for an IT topology of a control system, the method comprising: creating a system structure from a machine-readable data defining production process requirements and generating specification data of the IT topology based on the extracted system structure; optimizing the generated specification data of the IT topology by utilization of pre-defined rules and generating abstract aggregated IT topology data based on the optimized specification data; and instantiating and mapping the abstract aggregated IT topology data to specific technology instance data.
Opening claim text (preview).
What is claimed is: 1. A method for automatic generation of a specification for an information technology (IT) topology of a control system, the method comprising: generating specification data of the IT topology by extracting the specification data, using natural language processing, from machine-readable data that defines production process requirements and an extracted system structure that comprises mapping controllers, actuators, or sensors of the IT topology; creating a system structure from the machine-readable data; optimizing the generated specification data of the IT topology by utilization of pre-defined rules and generating abstract aggregated IT topology data based on the optimized specification data, wherein the predefined rules are used to group multiple control applications to a same executing node if a name of the actuators and instruments share a common prefix; and instantiating and mapping the abstract aggregated IT topology data to specific technology instance data. 2. The method according to claim 1 , wherein the machine-readable data comprises P&IDs, I/O lists, control narratives or control diagrams relevant for a configuration of the IT topology. 3. The method according to claim 1 , wherein system elements of the IT topology are software modules and/or hardware components. 4. The method according to claim 1 , wherein the method further comprises the step of an automatic cost estimation of the IT topology based on the specific technology instance data. 5. The method according to claim 1 , wherein the specification data defining the IT topology comprises information that is stored in a generic IT topology specification by using abstract types. 6. The method according to claim 1 , wherein the pre-defined rules are defined by a user during execution of the method or beforehand or the pre-defined rules are activated during execution of the method. 7. The method according to claim 1 , wherein the pre-defined rules are applied based on a target domain of the IT topology specification for power-plants, papermills or chemical production plants. 8. The method according to claim 1 , wherein the specific technology instance data comprises data defining IT nodes, capable to execute control logic, or data defining software modules, or data defining server structures. 9. The method according to claim 1 , wherein the optimizing of the generated specification data of the IT topology comprises optimizing the IT topology with regard to location, structure, topology, costs or user requirements. 10. A system for automatic generation of a specification for an information technology (IT) topology of a control system, the system comprising a processor for executing a method, the method comprising: generating specification data of the IT topology by extracting the specification data, using natural language processing, from machine-readable data that defines production process requirements and an extracted system structure that comprises mapping controllers, actuators, or sensors of the IT topology; creating a system structure from the machine-readable data; optimizing the generated specification data of the IT topology by utilization of pre-defined rules and generating abstract aggregated IT topology data based on the optimized specification data, wherein the predefined rules are used to group multiple control applications to a same executing node if a name of the actuators and instruments share a common prefix; and instantiating and mapping the abstract aggregated IT topology data to specific technology instance data. 11. The system according to claim 10 , wherein the machine-readable data comprises P&IDs, I/O lists, control narratives or control diagrams relevant for a configuration of the IT topology. 12. The system according to claim 10 , wherein system elements of the IT topology are software modules and/or hardware components. 13. The system according to claim 10 , wherein the method further comprises the step of an automatic cost estimation of the IT topology based on the specific technology instance data. 14. The system according to claim 10 , wherein the specification data defining the IT topology comprises information that is stored in a generic IT topology specification by using abstract types. 15. The system according to claim 10 , wherein the pre-defined rules are defined by a user during execution of the method or beforehand or the pre-defined rules are activated during execution of the method. 16. The system according to claim 10 , wherein the pre-defined rules are applied based on a target domain of the IT topology specification for power-plants, papermills or chemical production plants. 17. The system according to claim 10 , wherein the specific technology instance data comprises data defining IT nodes, capable to execute control logic, or data defining software modules, or data defining server structures.
characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability (for optimising operational conditions of wireless networks H04W24/02) · CPC title
Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202) · CPC title
Needs-based resource requirements planning or analysis · CPC title
Resource planning in a project environment · CPC title
Discovery or management of network topologies · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.