System and method for determining lift heights of a stockpile

US12259256B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12259256-B2
Application numberUS-202217850880-A
CountryUS
Kind codeB2
Filing dateJun 27, 2022
Priority dateJun 27, 2022
Publication dateMar 25, 2025
Grant dateMar 25, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

First claim

Opening claim text (preview).

We claim: 1. A method comprising: receiving, by one or more processors, location coordinates of vehicles driving on top of a second lift of a stockpile and making dumps on the top of the second lift of the stockpile, wherein the second lift is a n+1 layer among many layers of the stockpile, and wherein a height of the second lift extends from a top of a first lift to the top of the second lift; aggregating and averaging, by the one or more processors, the location coordinates of the vehicles driving on the top of the second lift of the stockpile to determine a location of the vehicles driving on the top of the second lift of the stockpile; receiving, by the one or more processors, elevation data measured from a bottom of the stockpile of the vehicles and from the location of the vehicles; determining, by the one or more processors, a second elevation of the second lift from the bottom of the stockpile to the top of the second lift, based on the elevation data of the vehicles; and determining, by the one or more processors, the height of the second lift from a top of a first lift to the top of the second lift, by deducting a first elevation of the first lift from the bottom of the stockpile to the top of the first lift, from the second elevation of the second lift from the bottom of the stockpile to the top of the second lift, wherein the first lift is a n layer among many layers of the stockpile. 2. The method of claim 1 , wherein the location coordinates of the vehicles are determined at a time preceding the dumps. 3. The method of claim 1 , wherein the location coordinates are determined by a GPS sensor on each of the vehicles. 4. The method of claim 1 , further comprising revising, by the one or more processors, the height of the second lift by replacing the height with the conveyor height for crush-for-leach stockpiles. 5. The method of claim 1 , further comprising determining, by the one or more processors, an estimate of a boundary of the second lift based on paths that the vehicles traversed. 6. The method of claim 1 , further comprising transmitting, by the one or more processors, the height of the second lift to a mine material tracking tool. 7. The method of claim 6 , wherein the mine material tracking tool provides data to a stockpile and section mapping tool. 8. The method of claim 7 , wherein the stockpile and section mapping tool provides data to an ore map. 9. The method of claim 8 , wherein the ore map provides data to a forecast model input table. 10. The method of claim 7 , wherein the stockpile and section mapping tool provides data to a predictive model. 11. The method of claim 1 , further comprising transmitting, by the one or more processors, the height of the second lift to a stockpile and section mapping tool. 12. An article of manufacture including one or more non-transitory, tangible computer readable storage mediums having instructions stored thereon that, in response to execution by one or more processors, cause the one or more processors to perform operations comprising: receiving, by the one or more processors, location coordinates of vehicles driving on top of a second lift of a stockpile and making dumps on the top of the second lift of the stockpile, wherein the second lift is a n+1 layer among many layers of the stockpile, and wherein a height of the second lift extends from a top of a first lift to the top of the second lift; aggregating and averaging, by the one or more processors, the location coordinates of the vehicles driving on the top of the second lift of the stockpile to determine a location of the vehicles driving on the top of the second lift of the stockpile; receiving, by the one or more processors, elevation data measured from a bottom of the stockpile of the vehicles and from the location of the vehicles; determining, by the one or more processors, a second elevation of the second lift from the bottom of the stockpile to the top of the second lift, based on the elevation data of the vehicles; and determining, by the one or more processors, the height of the second lift from a top of a first lift to the top of the second lift, by deducting a first elevation of the first lift from the bottom of the stockpile to the top of the first lift, from the second elevation of the second lift from the bottom of the stockpile to the top of the second lift, wherein the lift is a first n layer among many layers of the stockpile. 13. A system comprising: one or more processors; and one or more tangible, non-transitory memories configured to communicate with the one or more processors, the one or more tangible, non-transitory memories having instructions stored thereon that, in response to execution by the processor, cause the processor to perform operations comprising: receiving, by the one or more processors, location coordinates of vehicles driving on top of a second lift of a stockpile and making dumps on the top of the second lift of the stockpile, wherein the second lift is a n+1 layer among many layers of the stockpile, and wherein a height of the second lift extends from a top of a first lift to the top of the second lift; aggregating and averaging, by the one or more processors, the location coordinates of the vehicles driving on the top of the second lift of the stockpile to determine a location of the vehicles driving on the top of the second lift of the stockpile; receiving, by the one or more processors, elevation data measured from a bottom of the stockpile of the vehicles and from the location of the vehicles; determining, by the one or more processors, a second elevation of the second lift from the bottom of the stockpile to the top of the second lift, based on the elevation data of the vehicles; and determining, by the one or more processors, the height of the second lift from a top of a first lift to the top of the second lift, by deducting a first elevation of the first lift from the bottom of the stockpile to the top of the first lift, from the second elevation of the second lift from the bottom of the stockpile to the top of the second lift, wherein the first lift is a n layer among many layers of the stockpile. 14. The system of claim 13 , wherein the location coordinates of the vehicles are determined at a time preceding the dumps. 15. The system of claim 13 , wherein the location coordinates are determined by a GPS sensor on each of the vehicles. 16. The system of claim 13 , further comprising revising, by the one or more processors, the height of the second lift by replacing the height with the conveyor height for crush-for-leach stockpiles. 17. The system of claim 13 , further comprising determining, by the one or more processors, an estimate of a boundary of the second lift based on paths that the vehicles traversed. 18. The system of claim 13 , further comprising transmitting, by the one or more processors, the height of the second lift to a stockpile and section mapping tool. 19. The system of claim 18 , wherein the stockpile and section mapping tool provides data to an ore map, and wherein the ore map provides data to at least one of a predictive model or a forecast model input table. 20. The system of claim 13 , further comprising transmitting, by the one or more processors, the height of the second lift to a mine material tracking tool.

Assignees

Inventors

Classifications

  • Terrain data · CPC title

  • Point data, e.g. Point of Interest [POI] · CPC title

  • E21C41/00Primary

    Methods of underground or surface mining (E21C45/00 takes precedence); Layouts therefor (for peat E21C49/00) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12259256B2 cover?
The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of param…
Who is the assignee on this patent?
Freeport Minerals Corp
What technology area does this patent fall under?
Primary CPC classification G01C21/3811. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Mar 25 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).