Assembly method for crane

US12258243B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12258243-B2
Application numberUS-202117996823-A
CountryUS
Kind codeB2
Filing dateApr 14, 2021
Priority dateApr 27, 2020
Publication dateMar 25, 2025
Grant dateMar 25, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Provided is an assembly method for a crane, by which method a crane including a strut can be assembled easily. The assembly method for the crane includes a strut coupling step of coupling a base end of a strut, a cylinder connecting step of extending a cylinder unit having one end supported by the strut, the cylinder unit being capable of extending/contracting, to connect the other end of the cylinder unit to the boom, a strut raising step of causing the cylinder unit to contract to raise the strut, and a strut supporting step of stretching a stretching member, such as a rear side guy line or a luffing cable, between a front end of the strut and a base end of the boom to support the strut in a raised state.

First claim

Opening claim text (preview).

The invention claimed is: 1. An assembly method for a crane which includes: a lower travelling body capable of travelling on a travelling surface; an upper slewing body on the lower travelling body, the upper slewing body being slewably supported by the lower travelling body within a plane parallel to the travelling surface; a boom having a boom base end coupled to the upper slewing body and a boom front end located opposite to the boom base end, the boom being supported by the upper slewing body so as to be capable of rising and falling; a jib having a jib base end coupled to the boom front end and a jib front end located opposite to the jib base end and supporting a load-suspending cable, the jib being supported by the boom so as to be capable of rising and falling; and at least one strut having a strut base end rotatably coupled to the jib base end or the boom front end, the at least one strut having a strut front end located opposite to the strut base end, the strut front end being connected to the jib front end at least via a front side guy line, the method comprising: a strut coupling step of rotatably coupling the strut base end of the at least one strut to the jib base end or the boom front end; a cylinder connecting step of extending a cylinder unit having one end supported by one structure that is one of the at least one strut and the boom, and the other end opposite to the one end, the cylinder unit being capable of extending/contracting, to connect the other end of the cylinder unit to the other structure that is one of the at least one strut and the boom and different from the one structure; a strut raising step of causing the cylinder unit to contract to raise the at least one strut with the strut base end as a fulcrum; a strut supporting step of stretching a stretching member between the strut front end of the at least one strut and a specific part of the boom, the specific part being closer to the boom base end than the boom front end, to support the at least one strut in a raised state; and a rail laying step of laying a rail on the other structure, wherein the cylinder connecting step includes causing the other end of the cylinder unit to keep moving on the rail as a result of extension of the cylinder unit until reaching a position where the other end is connected to the other structure. 2. The assembly method for a crane according to claim 1 , wherein the rail laying step includes providing the rail or the other end of the cylinder unit with a guide, and the cylinder connecting step includes guiding the other end of the cylinder unit onto the rail by the guide. 3. The assembly method for a crane according to claim 1 , wherein the cylinder connecting step further include using the cylinder unit having the other end provided with a roller, and the cylinder connecting step includes causing the roller to keep rolling on the rail as a result of extension of the cylinder unit until the other end of the cylinder unit reaches a position where the other end is connected to the other structure. 4. The assembly method for a crane according to claim 1 , wherein the at least one strut includes: a front strut having a front strut base end coupled rotatably to the jib base end or the boom front end and a front strut front end located opposite to the front strut base end, the front strut front end being connected to the jib front end via a front side guy line; and a rear strut having a rear strut base end coupled rotatably, at rear of the front strut base end, to the jib base end or the boom front end and a rear strut front end located opposite to the rear strut base end, the rear strut front end being connected to the front strut front end via a connection member, the strut coupling step includes rotatably coupling each of the front strut base end and the rear strut base end to the jib base end or to the boom front end, the cylinder connecting step includes, with the one end of the cylinder unit being supported by the one structure out of the rear strut and the boom, extending the cylinder unit to connect the other end of the cylinder unit to the other structure out of the rear strut and the boom, the strut raising step includes causing the cylinder unit to contract to raise the rear strut with the rear strut base end as a fulcrum, and the stretching step includes stretching the stretching member between the rear strut front end and the specific part of the boom and giving tension to the stretching member to support the rear strut in a raised state. 5. The assembly method for a crane according to claim 1 , the method further comprising a boom raising step of raising the boom with respect to the upper slewing body with the cylinder unit being interposed between the at least one strut and the boom so that the cylinder unit functions as a strut backstop that prevents the at least one strut from falling backward.

Assignees

Inventors

Classifications

  • with jibs of adjustable configuration, e.g. foldable · CPC title

  • Luffing gear · CPC title

  • B66C23/348Primary

    the erection being operated by jacks · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12258243B2 cover?
Provided is an assembly method for a crane, by which method a crane including a strut can be assembled easily. The assembly method for the crane includes a strut coupling step of coupling a base end of a strut, a cylinder connecting step of extending a cylinder unit having one end supported by the strut, the cylinder unit being capable of extending/contracting, to connect the other end of the c…
Who is the assignee on this patent?
Kobelco Constr Mach Co Ltd
What technology area does this patent fall under?
Primary CPC classification B66C23/348. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Mar 25 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).