Torque sensing arrangement of power tool
US-2024123583-A1 · Apr 18, 2024 · US
US12233518B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12233518-B2 |
| Application number | US-202418653201-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 2, 2024 |
| Priority date | May 26, 2023 |
| Publication date | Feb 25, 2025 |
| Grant date | Feb 25, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for the installation of a threaded fastener ( 10 ) in a structure, the threaded fastener comprising a screw ( 20 ) and a nut ( 28 ), the method comprising the following steps: a) inserting the screw into the structure, and tightening the nut onto the screw, b) simultaneously transmitting/receiving ultrasonic waves into/from the fastener for the measurement of a parameter representative of a variation in said waves, said first parameter providing an indirect measurement of an axial tension in the screw, c) stopping the screwing when a target value for the first parameter is reached. The process further comprises determining the thickness of the structure to be tightened, and determining the target value of the first parameter in accordance with the thickness of the structure to be tightened and the geometrical characteristics of the fastener ( 10 ).
Opening claim text (preview).
What is claimed: 1. A method of installing a threaded fastener into a hole in a structure, the threaded fastener including a screw, having an end, a length (L 0 ) and a head having a length (L t ), and a nut having a length (L e ), the method comprising the following steps: a) inserting the screw into the hole, placing the nut at an initial position on the end of the screw, and screwing the nut onto the screw, b) simultaneously transmitting ultrasonic waves into the fastener and receiving reflected ultrasonic waves for the measurement of a first parameter representative of a variation in said waves, said first parameter providing an indirect measure of an axial tension in the screw, c) stopping the screwing when a target value for the first parameter is reached, characterized in that the process further comprises the following steps: d) determining the thickness of the structure to be tightened (L 1 ) by calculating the thickness (L 1 ) with a calculator during the screwing of the nut onto the screw, and e) determining the target value of the first parameter in accordance with the thickness of the structure to be tightened (L 1 ) and geometrical characteristics of the fastener ( 10 ). 2. The method according to claim 1 , wherein the first parameter is selected from: a time-of-flight of a longitudinal ultrasonic wave; a resonance frequency shift of the screw; and a ratio of the time-of-flight of a longitudinal or transverse ultrasonic wave to the thickness (L 1 ) of the structure to be tightened. 3. The method according to claim 1 , wherein the geometrical characteristics of the fastener are selected from: the length (L 0 ) of the screw, a length of the threaded portion of the screw, a screw thread pitch, the nut length (L e ), a nut counterbore length, a threading length of the nut and a distance between an end surface of the nut and at least one locking point. 4. The method according to claim 1 , wherein determining the target value of the first parameter comprises comparing the structural thickness with a set of thickness values, said set of thickness values being associated with a set of target values of the first parameter for a given screw, corresponding to a set of target tensions for a given screw. 5. The method according to claim 1 , in which determining the thickness of the structure (L 1 ) comprises a step of detecting the start of tightening of the structure, corresponding to the application of axial tension in the screw. 6. The method according to claim 5 , in which a screwing step is performed with an installation device provided with an electric motor, the method further comprising: measuring a second parameter representative of an energy variation of the electric motor as a function of time; and detecting the start of tightening, said start of tightening corresponding to a predetermined variation of the second parameter. 7. A method of installing a threaded fastener into a hole in a structure, the threaded fastener comprising a screw and a nut, the method comprising the following steps: a) inserting the screw into the hole, and screwing the nut onto the screw with an installation device provided with an electric motor, b) simultaneously transmitting ultrasonic waves into the fastener and receiving reflected ultrasonic waves for the measurement of a first parameter representative of a variation in said waves, said first parameter providing an indirect measure of an axial tension in the screw, c) stopping the screwing when a target value for the first parameter is reached, characterized in that the process further comprises the following steps: d) determining the thickness of the structure to be tightened (L 1 ), including a step of detecting the start of tightening of the structure, corresponding to the application of axial tension in the screw, e) determining the target value of the first parameter in accordance with the thickness of the structure to be tightened (L 1 ) and geometrical characteristics of the fastener ( 10 ), measuring a second parameter representative of an energy variation of the electric motor as a function of time, and detecting the start of tightening, said start of tightening corresponding to a predetermined variation of the second parameter, wherein the second parameter is selected from the current intensity of an electric motor and the torque of a drive shaft. 8. The method according to claim 1 , in which the determination of the structure thickness comprises a step of detecting the initial position of the nut on the screw. 9. A method of installing a threaded fastener into a hole in a structure, the threaded fastener comprising a screw and a nut, the method comprising the following steps: a) inserting the screw into the hole, and screwing the nut onto the screw, b) simultaneously transmitting ultrasonic waves into the fastener and receiving reflected ultrasonic waves for the measurement of a first parameter representative of a variation in said waves, said first parameter providing an indirect measure of an axial tension in the screw, c) stopping the screwing when a target value for the first parameter is reached, characterized in that the process further comprises the following steps: d) determining the thickness of the structure to be tightened (L 1 ), including a step of detecting the initial position of the nut on the screw by Bringing an annular metal element into contact with an annular surface of the nut, an inner diameter of the annular metal element being smaller than a inner diameter of the annular surface of the nut, Detecting contact between the annular metal element and the annular surface of the nut, Rotating the nut on the threaded portion of the screw, and applying pressure to the annular metal element so as to maintain contact with the annular surface of the nut, and Detecting a loss of contact between the annular metal element and the annular surface of the nut as soon as one end of the threaded portion passes through the inner diameter of the annular surface of the nut, the detection of the loss of contact corresponding to the initial position of the nut, and e) determining the target value of the first parameter in accordance with the thickness of the structure to be tightened (L 1 ) and geometrical characteristics of the fastener ( 10 ). 10. The method according to claim 1 , further comprises monitoring the temperature in the screw, and adjusting the target value of the first parameter according to the temperature. 11. The method according to claim 1 , wherein at least one of said screw and said nut comprises a marking containing at least one identifier or geometrical characteristic of said screw or nut, the installation method further comprising a step of reading the marking and identifying at least the identifier or the geometrical characteristic of the screw and/or nut, said reading step being performed prior to step e). 12. The method according to claim 1 , wherein stopping the screwing comprises stopping the screwing when the nut has covered a distance (L p ) from the initial position to a start of tightening position; and calculating the thickness (L 1 ) comprises subtracting from the screw length (L 0 ) the distance (L p ) from the initial position to the start of tightening position, the screw head length (L t ) and the nut length (L e ).
by electrical means · CPC title
for special purposes · CPC title
specially adapted for electrically operated wrenches or screwdrivers · CPC title
by electrical means · CPC title
Arrangement of torque limiters or torque indicators in wrenches or screwdrivers (couplings for transmitting rotation or clutches F16D; devices for measuring torque per se G01L) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.