Method of starting a wind park
US-11286903-B2 · Mar 29, 2022 · US
US12196178B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12196178-B2 |
| Application number | US-202218284315-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 9, 2022 |
| Priority date | Mar 29, 2021 |
| Publication date | Jan 14, 2025 |
| Grant date | Jan 14, 2025 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of performing a black start in a wind farm is provided, the wind farm including a primary black start enabled wind turbine, at least one secondary black start enabled wind turbine, and a wind farm grid interconnecting at least a part of the wind turbines in the wind farm, the method including (a) starting the primary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid, (b) monitoring, at the at least one secondary black start enabled wind turbine, an electric parameter value in the wind farm grid, and (c) starting the at least one secondary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid when the monitored electric parameter value meets a predetermined condition. A corresponding wind farm is also provided.
Opening claim text (preview).
The invention claimed is: 1. A method of performing a black start in a wind farm, the wind farm comprising a primary black start enabled wind turbine, at least one secondary black start enabled wind turbine, and a wind farm grid interconnecting at least a part of the wind turbines in the wind farm, the method comprising; starting the primary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid; monitoring, at the at least one secondary black start enabled wind turbine, an electric parameter value in the wind farm grid; and starting the at least one secondary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid when the electric parameter value meets a predetermined condition; and wherein the electric parameter value is a code modulated onto the grid voltage, and wherein the predetermined condition is met when the code corresponds to a predetermined code. 2. The method according to claim 1 , wherein the code is modulated onto the grid voltage when the primary black start enabled wind turbine has been operating in black start mode for a predetermined period of time and/or when the voltage level in the wind farm grid reaches a predetermined voltage level and/or when the wind farm grid frequency is above or below a predetermined frequency value and/or when the primary black start enabled wind turbine has used a pre-determined amount of capacity. 3. The method according to claim 1 , wherein the at least one secondary black start enabled wind turbine comprises a plurality of secondary black start enabled wind turbines, and the predetermined condition is individual for each of the secondary black start enabled wind turbines. 4. The method according to claim 3 , wherein the predetermined condition is different for each of the secondary black start enabled wind turbines. 5. The method according to claim 3 , wherein the predetermined condition is identical for each of the secondary black start enabled wind turbines. 6. The method according to claim 3 , wherein the predetermined condition is a first predetermined condition for a first group of the secondary black start enabled wind turbines, and the predetermined condition is a second predetermined condition for a second group of the secondary black start enabled wind turbines. 7. The method according to claim 1 , wherein starting the primary black start enabled wind turbine occurs in response to receiving a black start initiation signal at the primary black start enabled wind turbine. 8. The method according to claim 1 , further comprising operating the at least one secondary black start enabled wind turbine in a black start stand-by mode prior to starting the preselected black start enabled wind turbine in black start mode. 9. The method according to claim 8 , wherein operating the at least one secondary black start enabled wind turbine in the black start stand-by mode is initiated when receiving the black start initiation signal at the at least one secondary black start enabled wind turbine. 10. A wind farm comprising; a primary black start enabled wind turbine; at least one secondary black start enabled wind turbine; and a wind farm grid interconnecting at least a part of the wind turbines in the wind farm; wherein the primary black start enabled wind turbine is configured to start operating in a black start mode in order to supply voltage to the wind farm grid; and wherein the at least one secondary black start enabled wind turbine is configured to monitor an electric parameter value in the wind farm grid and to start operating in black start mode in order to supply voltage to the wind farm grid when the electric parameter value meets a predetermined condition; and wherein the electric parameter value is a code modulated onto the grid voltage, and wherein the predetermined condition is met when the code corresponds to a predetermined code. 11. The wind farm according to claim 10 , further comprising at least one ordinary wind turbine that is not black start enabled. 12. The wind farm according to claim 10 , further comprising a controller configured to transmit a black start initiation signal to the primary black start enabled wind turbine and/or to the at least one secondary black start enabled wind turbine.
Wind energy · CPC title
being internal to power sources or power generation plants · CPC title
using pulsed signals · CPC title
Dispersed generators · CPC title
Electrical grid status parameters, e.g. voltage, frequency or power demand · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.