Vessel and method for installation of a pile adapted to support an offshore wind turbine

US12195305B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12195305-B2
Application numberUS-202017603738-A
CountryUS
Kind codeB2
Filing dateApr 15, 2020
Priority dateApr 15, 2019
Publication dateJan 14, 2025
Grant dateJan 14, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A vessel and a method for installation of a pile adapted to support an offshore wind turbine are described. The method includes a) suspending the pile from a hoisting cable in a substantially vertical orientation; b) providing a lower end of the pile in a pile holding system limiting horizontal motion of a pile portion held by the pile holding system; and c) lowering the pile with the pile being held by the pile holding system. The lowering includes at least lowering the pile through a splash zone of a body of water, and during step c), two tugger lines are directly or indirectly connected to the pile at a location between the pile holding system and the hoisting cable, said tugger lines being operated to damp motion of the pile in two respective horizontal directions.

First claim

Opening claim text (preview).

The invention claimed is: 1. A vessel for installation of a pile adapted to support an offshore wind turbine, said vessel comprising: a crane with a hoisting cable and hoisting winch to suspend the pile in a substantially vertical orientation and to lower the pile; a pile holding system to hold the pile and limit horizontal motion of a pile portion held by the pile holding system; a tugger system including two tugger lines and corresponding tugger winches, said tugger lines being directly or indirectly connectable to the pile at a location between the pile holding system and the hoisting cable; and a control system for controlling the hoisting winch and the two tugger winches to lower the pile with the pile being held by the pile holding system using the hoisting winch and to damp motion of the pile in two respective horizontal directions using the two tugger winches, wherein the pile holding system is configured to pivot between an orientation corresponding to a substantially horizontal orientation of a pile held in the pile holding system and an orientation corresponding to a substantially vertical orientation of a pile held in the pile holding system, and wherein the tugger system is substantially aligned with the pile holding system and the pile held in the pile holding system in any orientation of the pile holding system and the pipe held in the pile holding system. 2. The vessel according to claim 1 , wherein the tugger system is arranged on the crane. 3. The vessel according to claim 1 , wherein the tugger system is arranged on a structure of the vessel other than the crane. 4. The vessel according to claim 1 , wherein the two tugger lines extend from the location between the pile holding system and the hoisting cable in a substantially horizontal direction. 5. The vessel according to claim 1 , wherein the location between the pile holding system and the hoisting cable is on an upper end of the pile. 6. The vessel according to claim 1 , wherein the location between the pile holding system and the hoisting cable is at a load connector suspended by the hoisting cable, or at an attachment device between the load connector and the upper end of the pile. 7. The vessel according to claim 1 , wherein the two tugger lines include a first tugger line and a second tugger line, and wherein the corresponding tugger winches include a first tugger winch for the first tugger line and a second tugger winch for the second tugger line. 8. A vessel for installation of a pile adapted to support an offshore wind turbine, said vessel comprising: a crane with a hoisting cable and hoisting winch to suspend the pile in a substantially vertical orientation and to lower the pile; a pile holding system to hold the pile and limit horizontal motion of a pile portion held by the pile holding system; a tugger system including two tugger lines and corresponding tugger winches, said tugger lines being directly or indirectly connectable to the pile at a location between the pile holding system and the hoisting cable; and a control system for controlling the hoisting winch and the two tugger winches to lower the pile with the pile being held by the pile holding system using the hoisting winch and to damp motion of the pile in two respective horizontal directions using the two tugger winches, wherein the two tugger lines include a first tugger line and a second tugger line, and wherein the corresponding tugger winches include a first tugger winch for the first tugger line and a second tugger winch for the second tugger line, and wherein the tugger system includes a first tugger sheave to guide the first tugger line between the first tugger winch and the location between the pile holding system and the hoisting cable, and a second sheave to guide the second tugger line between the second tugger winch and the location between the pile holding system and the hoisting cable. 9. The vessel according to claim 8 , wherein the crane comprises a boom rotatably connected to a structure to rotate about a substantially horizontal rotation axis, and wherein the structure comprises a spreader to guide the two tugger lines at opposite sides of the boom towards the location between the pile holding system and the hoisting cable. 10. The vessel according to claim 8 , wherein the first and second sheave are arranged on a spreader. 11. The vessel according to claim 10 , wherein a respective sheave guides each tugger line towards the location between the pile holding system and the hoisting cable, or wherein the tugger system is arranged at an elevated position above the upper deck of the vessel. 12. The vessel according to claim 9 , wherein the first and second sheave are arranged on a spreader. 13. A vessel according to claim 8 , wherein the first and second tugger winches are arranged on the crane.

Assignees

Inventors

Classifications

  • Guide devices; Guide frames {(as parts of the driver scaffold E02D7/16)} · CPC title

  • Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; {accessories for coupling driver to piles or the like E02D13/10; for trees or other plants A01G17/16; placing posts E04H17/26}) · CPC title

  • Offshore structures for wind turbines · CPC title

  • Methods for placing the offshore structure · CPC title

  • placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12195305B2 cover?
A vessel and a method for installation of a pile adapted to support an offshore wind turbine are described. The method includes a) suspending the pile from a hoisting cable in a substantially vertical orientation; b) providing a lower end of the pile in a pile holding system limiting horizontal motion of a pile portion held by the pile holding system; and c) lowering the pile with the pile bein…
Who is the assignee on this patent?
Itrec Bv
What technology area does this patent fall under?
Primary CPC classification B66C13/06. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jan 14 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).