Crane vessel for hoisting of an offshore wind turbine or component thereof

US12187585B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12187585-B2
Application numberUS-202117909665-A
CountryUS
Kind codeB2
Filing dateMar 5, 2021
Priority dateMar 6, 2020
Publication dateJan 7, 2025
Grant dateJan 7, 2025

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A crane vessel for hoisting of an offshore wind turbine or a component thereof, includes a hull having a deck. A crane configured for hoisting of an offshore wind turbine or a component thereof includes a vertical crane structure having a crane structure base fixed to the hull, the crane structure extending from the hull over a height thereof to a top along a vertical axis of the crane structure, a boom, and a slew bearing allowing to revolve the boom, about a slew axis. A main hoisting system includes at least one main hoisting winch, an associated main hoisting cable and a load connector, the main hoisting cable extending from the main hoisting winch to a main hoist cable guide on the boom and then to the load connector. The crane further includes a dynamic behaviour adjustment system that is configured to adjust the dynamic behaviour of the vessel by moving and/or arranging an adjustment mass that is distinct from the offshore wind turbine or component thereof into or in at least one dynamic behaviour adjustment position along the height of the vertical crane structure.

First claim

Opening claim text (preview).

The invention claimed is: 1. A crane vessel for hoisting of an offshore wind turbine or a component thereof, the vessel comprising: a hull having a deck; and a crane configured for hoisting of an offshore wind turbine or a component thereof and comprising: a vertical crane structure having a crane structure base fixed to the hull, the crane structure extending from the hull over a height thereof to a top along a vertical axis of the crane structure; a boom; a slew bearing allowing to revolve the boom about a slew axis; a main hoisting system comprising at least one main hoisting winch, an associated main hoisting cable and a load connector, the main hoisting cable extending from the main hoisting winch to a main hoist cable guide on the boom and then to the load connector; and a dynamic behaviour adjustment system that is configured to adjust the dynamic behaviour of the vessel by moving and/or arranging an adjustment mass that is distinct from the offshore wind turbine or component thereof into or in at least one dynamic behaviour adjustment position along the height of the vertical crane structure. 2. The crane vessel according to claim 1 , wherein the vertical crane structure extends at least 50 meters or more above a deck of the vessel. 3. The crane vessel according to claim 1 , wherein the roll behaviour adjustment system comprises a vertically mobile adjustment mass that is vertically mobile along the vertical crane structure and an associated mobile adjustment mass support system, the mobile mass support system being configured to raise or lower the adjustment mass along the crane structure, and to fix the adjustment mass in at least one dynamic behaviour adjustment position to thereby change the dynamic behaviour of the vessel. 4. The crane vessel according to claim 3 , wherein the at least one dynamic behaviour adjustment position is in an upper halve of the vertical crane structure. 5. The crane vessel according to claim 3 , wherein the mobile adjustment mass system comprises a guide fixed to the vertical crane structure for guiding the mobile adjustment mass when being moved into the at least one dynamic behaviour adjustment position. 6. The crane vessel according to claim 1 , wherein the mobile adjustment mass is modular and the mass of the mobile mass can be reduced or increased depending on the adjustment required. 7. The crane vessel claim 1 , wherein the adjustment mass comprises a volume chamber at a fixed dynamic behaviour adjustment position or a vertically mobile volume chamber that is vertically movable relative to the vertical crane structure, and a pump to fill the volume chamber with liquid. 8. The crane vessel according to claim 1 , wherein the vertical crane structure is composed of a crane structure base that is fixed to the hull and a crane structure top section that is supported on the crane structure base via the slew bearing and forms the top, wherein the boom is mounted to the crane structure top section so as to revolve along with the crane structure top section. 9. The crane vessel according to claim 8 , wherein the vertically mobile adjustment mass is vertically mobile inside the crane structure top section. 10. The crane vessel according to claim 1 , wherein the boom is connected to the top of the vertical crane structure. 11. A method for hoisting of an offshore wind turbine or a component thereof, comprising the steps of: of a using the crane vessel according to claim 1 ; and wherein the dynamic behaviour adjustment system that is operated to adjust the dynamic behaviour of the vessel by moving and/or arranging an adjustment mass that is distinct from the offshore wind turbine or component thereof into or in at least one dynamic behaviour adjustment position along the height of the vertical crane structure. 12. A crane vessel for hoisting of an offshore wind turbine component comprising: a hull having a deck; a tower crane, the tower crane comprising: a crane tower having a tower base mounted to the hull and a tower top; and a crane unit, the crane unit comprising: a revolving crane superstructure; a boom, pivotally connected to the superstructure for pivoting about a horizontal pivot axis; and a slew bearing, rotatable supporting the crane superstructure on the crane tower, wherein the crane is provided with a dynamic behaviour adjustment system that is configured to adjust the dynamic behaviour of the vessel by moving and/or arranging an adjustment mass that is distinct from the offshore wind turbine or component thereof into or in at least one dynamic behaviour adjustment position along the height of the vertical crane structure. 13. The crane vessel according to claim 12 , wherein the crane tower extends at least 50 meters or more above the deck of the vessel. 14. The crane vessel according to claim 12 , wherein the tower crane comprises a nacelle balcony, supported by the tower, the balcony being configured for supporting the nacelle at a height above the deck, wherein the height allows for fixing one or more blades to the nacelle supported by the balcony. 15. The crane vessel according to claim 12 , wherein the crane tower is a modular tower, and is composed out of multiple stackable tower sections for building or extending the crane tower, and wherein the tower crane comprises a lifting device for lifting the modular sections. 16. The crane vessel according to claim 12 , wherein the tower crane comprises a stacking sleeve, configured for stacking a crane tower section on top of another crane tower section, and for lifting the crane over a height of at least one crane tower section. 17. The crane vessel according to claim 12 , wherein the crane is an around the leg climbing crane, wherein the slew bearing has a central crane tower passage through which crane tower passage the crane tower extends, and wherein the crane comprises a crane lifting device, configured for lifting the crane up and down the crane tower. 18. The crane vessel according to claim 12 , wherein the tower crane further comprises a roll damping system, wherein the roll damping system is located in the upper half of the tower, and wherein the roll damping system comprises a tuned mass damper.

Assignees

Inventors

Classifications

  • Safety gear (for cranes in general B66C15/00; for rope, cable, or chain winding mechanisms B66D1/54) · CPC title

  • for use erecting wind turbines (B66C23/207 takes precedence) · CPC title

  • for converting wind energy into electric energy · CPC title

  • of cranes · CPC title

  • Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12187585B2 cover?
A crane vessel for hoisting of an offshore wind turbine or a component thereof, includes a hull having a deck. A crane configured for hoisting of an offshore wind turbine or a component thereof includes a vertical crane structure having a crane structure base fixed to the hull, the crane structure extending from the hull over a height thereof to a top along a vertical axis of the crane structur…
Who is the assignee on this patent?
Itrec Bv
What technology area does this patent fall under?
Primary CPC classification B66C23/53. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jan 07 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).