Device for measuring the temperature of a molten metal
US-2018080715-A1 · Mar 22, 2018 · US
US12172208B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12172208-B2 |
| Application number | US-202017756478-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 21, 2020 |
| Priority date | Nov 29, 2019 |
| Publication date | Dec 24, 2024 |
| Grant date | Dec 24, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An operation method of ladle refining treatment by which ladle refining treatment of a molten steel is performed while continuously measuring a molten steel temperature during operation of the ladle refining treatment of the molten steel is provided. The operation method includes setting a time earlier than a scheduled ending time of the ladle refining treatment in a continuous measurement period of the molten steel temperature as a determination timing, and estimating the molten steel temperature at the scheduled ending time on the basis of a change with time of the molten steel temperature in continuous measured data of the molten steel temperature from a start of continuous measurement of the molten steel temperature to the determination timing.
Opening claim text (preview).
The invention claimed is: 1. An operation method of a ladle refining treatment by which the ladle refining treatment of a molten steel is performed while continuously measuring a molten steel temperature during operation of the ladle refining treatment of the molten steel, the operation method comprising setting a time earlier than a scheduled ending time of the ladle refining treatment in a continuous measurement period of the molten steel temperature as a determination timing, and estimating the molten steel temperature at the scheduled ending time on the basis of a change with time of the molten steel temperature in continuous measured data of the molten steel temperature from a start of continuous measurement of the molten steel temperature to the determination timing, an estimated value T f of the molten steel temperature is calculated according to the following Formula (1): T f =BMA td +( BMA td −BMA td −α)/α× t r (1) where T f is the estimated value in ° C. of the molten steel temperature at the scheduled ending time, BMA td is a backward moving average value in ° C. of a continuous temperature measured value at time t d , BMA td −α is a backward moving average value in ° C. of a continuous temperature measured value at time (t d −α), t d is an operation time in minutes from the start of the continuous measurement of the molten steel temperature to the determination timing, t d −α is an operation time in minutes from the start of the continuous measurement of the molten steel temperature to a minutes before t d , and t r is a time in minutes from an obtainment time of the estimated value to the scheduled ending time. 2. The operation method of a ladle refining treatment according to claim 1 , wherein the continuous measured data of the molten steel temperature is of measured values corrected depending on an immersion depth of a temperature sensor for continuous temperature measurement. 3. The operation method of a ladle refining treatment according to claim 2 , wherein the immersion depth of the temperature sensor for continuous temperature measurement is increased with an increase of the number of uses of a measuring element of the temperature sensor for continuous temperature measurement. 4. The operation method of a ladle refining treatment according to claim 1 , wherein in a case where an estimated value of the molten steel temperature is within a target range of the molten steel temperature at the scheduled ending time, operation conditions at the determination timing are maintained until the scheduled ending time, wherein in a case where an estimated value of the molten steel temperature is higher than a target range of the molten steel temperature at the scheduled ending time, an operation of decreasing the molten steel temperature is performed in a period from the determination timing to the scheduled ending time, or wherein in a case where an estimated value of the molten steel temperature is lower than a target range of the molten steel temperature at the scheduled ending time, an operation of increasing the molten steel temperature is performed in a period from the determination timing to the scheduled ending time. 5. The operation method of a ladle refining treatment according to claim 1 , wherein the determination timing is 3 minutes to 8 minutes before the scheduled ending time. 6. The operation method of a ladle refining treatment according to claim 1 , wherein α is 0.5 minutes to 2.0 minutes. 7. The operation method of a ladle refining treatment according to claim 1 , wherein a range of backward moving average is determined on the basis of a variation cycle of a continuous measured value of the molten steel temperature measured beforehand. 8. The operation method of a ladle refining treatment according to claim 1 , wherein the molten steel temperature at the scheduled ending time is estimated on the basis of the change with time of the molten steel temperature in the continuous measured data of the molten steel temperature during killing treatment from after end of at least one of alloying addition and oxygen supply to the determination timing in the continuous measurement period of the molten steel temperature. 9. The operation method of a ladle refining treatment according to claim 1 , wherein the ladle refining treatment is RH degassing treatment.
Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00 (treating molten metals during moulding B22D1/00, B22D27/00) · CPC title
Treatment of fused masses in the ladle or the supply runners before casting {(for continuous casting B22D11/10; metallurgical processing, e.g. refining of iron or other metal C21, C22, C25C)} · CPC title
Measuring or sampling devices · CPC title
Treatment with gases (C21C7/072, C22B9/05 take precedence) · CPC title
for measuring temperature of moving fluids or granular materials capable of flow · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.