Back annotation of load reduction in clients

US12153407B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12153407-B2
Application numberUS-202217575784-A
CountryUS
Kind codeB2
Filing dateJan 14, 2022
Priority dateJan 18, 2021
Publication dateNov 26, 2024
Grant dateNov 26, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for visual representation of a facility mimic diagram of a technical facility, in particular a process or manufacturing facility, which has an operator station server, an engineering station server and an operator station client, wherein a) a facility mimic diagram of the technical facility is transferred from the operator station server to the operator station client, b) visually limiting representation of the facility mimic diagram by the operator station client, and c) automatically notifying the engineering station server about the limitation of the visual representation of the facility mimic diagram set by the operator station client via a message.

First claim

Opening claim text (preview).

What is claimed is: 1. A management system for a technical facility, comprising: an operator station server operatively coupled to a facility bus and to a terminal bus; an engineering station server operatively coupled to the terminal bus; and an operator station client operatively coupled to the terminal bus, the operator station server, the engineering station server and the operator station client being interconnected via the terminal bus; wherein for control and monitoring the operator station server is configured to transfer a facility mimic diagram of the technical facility, previously generated by the engineering station server, to the operator station client; wherein the operator station client is configured to limit a duration of time in which a visual representation of the facility mimic diagram is displayable in cases of an anticipated overshooting of a duration of time available for the visual representation of the facility mimic diagram; and wherein the operator station client is further configured to automatically inform the engineering station server about the limitation of the visual representation of the facility mimic diagram via a message during operation of the technical facility, the facility mimic diagram being adjusted based on the message to avoid overly limiting the visual representation of the facility mimic diagram. 2. The management system as claimed in claim 1 , wherein the message comprises a reference to the facility mimic diagram. 3. The management system as claimed in claim 2 , wherein the message comprises at least one of (i) a type and (ii) an identification of a diagram element of the facility mimic diagram. 4. The management system as claimed in claim 1 , wherein the message comprises information about the operator station client; and wherein the information comprises at least one of (i) a name, (ii) at least one of a type and a location of the operator station client and (iii) an integration of the operator station client in a communications network of the technical facility. 5. The management system as claimed in claim 1 , wherein the message comprises an extent of a set limitation. 6. The management system as claimed in claim 1 , wherein the operator station server is further configured to store the message of the operator station client in a message archive such that the message is retrievable by an operator of the management system. 7. The management system as claimed in claim 1 , wherein the message is an alarm signal whose processing can be acknowledged by at least one of (i) a project engineer and (ii) an operator of the management system. 8. The management system as claimed in claim 1 , wherein the technical facility comprises a process or manufacturing facility. 9. The management system as claimed in claim 1 , wherein the management system is utilized to operate the technical facility. 10. The management system as claimed in claim 9 , wherein the technical facility comprises a process or manufacturing facility. 11. A method for visually representing a facility mimic diagram of a technical facility which has an operator station server operatively coupled to a facility bus and to a terminal bus, an engineering station server operatively coupled to the terminal bus and an operator station client operatively coupled to the terminal bus, the method comprising: a) transferring a facility mimic diagram of the technical facility from the operator station server to the operator station client; b) providing limited visual representation of the facility mimic diagram by the operator station client; and c) operating the technical facility and automatically notifying the engineering station server about limitation of the visual representation of the facility mimic diagram set by the operator station client via a message during operation of the technical facility and adjusting the facility mimic diagram based on the message to avoid overly limiting the visual representation of the facility mimic diagram; wherein the operator station server, the engineering station server and the operator station client are interconnected via the terminal bus; and wherein the operator station client is configured to limit a duration of time in which the visual representation of the facility mimic diagram is displayable in cases of an anticipated overshooting of a duration of time available for the visual representation of the facility mimic diagram. 12. The method as claimed in claim 11 , wherein the message comprises a reference to the facility mimic diagram. 13. The method as claimed in claim 12 , wherein the message comprises at least one of (i) a type and (ii) an identification of a diagram element of the facility mimic diagram. 14. The method as claimed in claim 12 , wherein the message comprises information about the operator station client; and wherein the information comprises at least one of (i) a name, (ii) at least one of a type and a location of the operator station client and (iii) an integration of the operator station client in a communications network of the technical facility. 15. The method as claimed in claim 11 , wherein the message comprises information about the operator station client; and wherein the information comprises at least one of (i) a name, (ii) at least one of a type and a location of the operator station client and (iii) an integration of the operator station client in a communications network of the technical facility. 16. The method as claimed in one of claim 15 , wherein the message comprises information about the operator station client; and wherein the information comprises at least one of (i) a name, (ii) at least one of a type and a location of the operator station client and (iii) an integration of the operator station client in a communications network of the technical facility. 17. The method as claimed in claim 11 , wherein the message comprises an extent of a set limitation. 18. The method as claimed in claim 11 , wherein the operator station server stores the message of the operator station client in a message archive such that the message is retrievable by at least one of (i) an operator and (ii) a project engineer of the management system. 19. The method as claimed in claim 11 , wherein the message is an alarm signal whose processing can be acknowledged by a at least one of (i) a project engineer and (ii) or an operator of the management system. 20. The method as claimed in claim 11 , wherein the technical facility comprises a process or manufacturing facility.

Assignees

Inventors

Classifications

  • Manufacturing · CPC title

  • Layout of factory, facility, cell, production system planning · CPC title

  • Icon display for quick access of detailed information · CPC title

  • Fisheye view, sharp detailed view of main subject, rest much smaller, navigate · CPC title

  • Display entire image within an enlarged image · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12153407B2 cover?
A method for visual representation of a facility mimic diagram of a technical facility, in particular a process or manufacturing facility, which has an operator station server, an engineering station server and an operator station client, wherein a) a facility mimic diagram of the technical facility is transferred from the operator station server to the operator station client, b) visually limi…
Who is the assignee on this patent?
Siemens Ag
What technology area does this patent fall under?
Primary CPC classification G05B19/41865. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Nov 26 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 5 related publications on this page (citations in our corpus or others sharing the same primary CPC).