Control arrangement, backup system and method for controlling an inverter

US12149118B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12149118-B2
Application numberUS-202118005646-A
CountryUS
Kind codeB2
Filing dateSep 27, 2021
Priority dateSep 28, 2020
Publication dateNov 19, 2024
Grant dateNov 19, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A secure, reliable and simplified control mechanism for operating an inverter is provided. In particular, a mechanical switch is used for connecting a local grid with a public grid and for disconnecting the local grid from the public grid. The mechanical switch comprises an intermediate position. Each time when the switch is in this intermediate position, the inverter is immediately shut down in a fast shutdown operation.

First claim

Opening claim text (preview).

The invention claimed is: 1. A control arrangement for an inverter, comprising: a switch with at least three switching positions comprising a first position, a second position and an intermediate position; and a control device for controlling an operation of the inverter, wherein the switch is set to the intermediate position during each change between the first position and the second position, and wherein the control device is configured to shut down the inverter as soon as the switch is set to the intermediate position, operate the inverter in an on-grid mode when the switch is set to the first position, and operate the inverter in an off-grid mode when the switch is set to the second position, wherein the switch comprises a first auxiliary switching element which is configured to interrupt a connection between the switch and the control device when the switch is in the intermediate position, and to close the connection between the switch and the control device when the switch is in the first position or the second position, and wherein the control device is configured to immediately shut down the inverter as soon as the connection is interrupted. 2. The control arrangement according to claim 1 , wherein the switch comprises a second auxiliary switching element which is configured to interrupt a connection between the control device and a measurement device connected to a public grid when the switch is in the second position, and to connect the control device with the measurement device if the switch is in the first position. 3. The control arrangement according to claim 1 , wherein the control device is configured to shut down the inverter within a time interval of maximum 50 milliseconds as soon as the switch is set to the intermediate position. 4. The control arrangement according to claim 1 , wherein the switch is configured to connect a public grid and a local grid in the first position and to disconnect the public grid from the local grid in the second position. 5. The control arrangement according to claim 4 , wherein the control device comprises a monitoring circuit configured to monitor a state of the switch, and wherein the control device only operates the inverter in the off-grid mode if the local grid is disconnected from the public grid. 6. The control arrangement according to claim 1 , wherein the switch is a manually operated switch. 7. The control arrangement according to claim 6 , comprising an actuator which is mechanically coupled to the switch and configured to mechanical operate the switch. 8. The control arrangement according to claim 7 , wherein the actuator is configured to remain for a predefined waiting period in the intermediate position before setting the switch to the first position or the second position. 9. The control arrangement according to claim 1 , wherein the control device is configured to verify whether the public grid is in a normal condition before operating the inverter in the on-grid mode. 10. An electrical power backup system, comprising: an inverter configured to provide an alternating current power supply; and a control arrangement for the inverter according to claim 1 , wherein the switch is configured to connect a public grid and a local grid if the switch is in the first position and to disconnect the public grid from the local grid if the switch is in the second position and the intermediate position. 11. The electrical power backup system according to claim 10 , wherein the inverter is configured to be connected to a direct current power source, and the direct power source comprises at least one of a battery or a photovoltaic power source. 12. A method for controlling an inverter, comprising: detecting an intermediate position of a switch with three switching positions including a first position, a second position and an intermediate position; shutting down the inverter upon detecting that the switch is set to the intermediate position; operating the inverter in an on-grid mode when the switch is set to the first position; and operating the inverter in an off-grid mode when the switch is set to the second position, wherein the switch comprises a first auxiliary switching element which interrupts a connection between the switch and the control device when the switch is in the intermediate position, and closes the connection between the switch and the control device when the switch is in the first position or the second position, and wherein the control device immediately shuts down the inverter as soon as the connection is interrupted. 13. The method according to claim 12 , wherein the switch remains for a predefined waiting period in the intermediate position before changing to the first position or to the second position.

Assignees

Inventors

Classifications

  • Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management · CPC title

  • Photovoltaics · CPC title

  • Means for starting or stopping converters · CPC title

  • H02J3/381Primary

    Dispersed generators · CPC title

  • using batteries or super capacitors with converting means · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12149118B2 cover?
A secure, reliable and simplified control mechanism for operating an inverter is provided. In particular, a mechanical switch is used for connecting a local grid with a public grid and for disconnecting the local grid from the public grid. The mechanical switch comprises an intermediate position. Each time when the switch is in this intermediate position, the inverter is immediately shut down i…
Who is the assignee on this patent?
Fronius Int Gmbh
What technology area does this patent fall under?
Primary CPC classification H02J3/381. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Nov 19 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).