Creation method for action resource, execution method, electronic device, and storage medium

US12143307B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12143307-B2
Application numberUS-202017761044-A
CountryUS
Kind codeB2
Filing dateSep 14, 2020
Priority dateSep 20, 2019
Publication dateNov 12, 2024
Grant dateNov 12, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A creation method for creating an action resource, an execution method of an action, an electronic device, and a storage medium are provided. The creation method includes receiving a first creation request that includes a target resource; creating a first action resource, which is a resource used for triggering a first action for the target resource, according to the first creation request; creating the first action resource includes: creating at least one of a first conflict priority attribute and a first conflict priority effective time attribute for the first action resource; the first conflict priority attribute represents a priority of the first action resource relative to an action resource that conflicts with the first action resource and is aimed at the target resource, and the first conflict priority effective time attribute represents a time range in which the first action resource has exclusive access to the target resource.

First claim

Opening claim text (preview).

What is claimed is: 1. A creation method for creating an action resource, comprising: receiving a first creation request, wherein the first creation request comprises a target resource; and creating a first action resource according to the first creation request, wherein the first action resource is a resource used for triggering a first action for the target resource, wherein creating the first action resource comprises: creating at least one selected from a group consisting of a first conflict priority attribute and a first conflict priority effective time attribute for the first action resource, wherein the first conflict priority attribute represents a priority of the first action resource relative to an action resource that conflicts with the first action resource and is aimed at the target resource, and the first conflict priority effective time attribute represents a time range in which the first action resource has exclusive access to the target resource. 2. The creation method according to claim 1 , wherein creating the first action resource further comprises: creating a first conflict target resource attribute and a first conflict target action attribute for the first action resource, wherein the first conflict target resource attribute represents an identification code of the target resource, and the first conflict target action attribute represents an action that conflicts with the first action. 3. The creation method according to claim 1 , wherein creating the first action resource further comprises: creating a first conflict target resource attribute and a first conflict target action attribute for the first action resource, wherein the first conflict target resource attribute represents an identification code of the target resource, the first conflict target action attribute represents an action that conflicts with the first action, the first action resource comprises a conflict policy sub-resource, and the conflict policy sub-resource comprises the first conflict target resource attribute, the first conflict target action attribute, and at least one selected from the group consisting of the first conflict priority attribute and the first conflict priority effective time attribute. 4. The creation method according to claim 1 , wherein creating the first action resource further comprises: creating a first action status attribute for the first action resource, wherein the first action status attribute represents a status of the first action. 5. The creation method according to claim 4 , wherein creating the first action resource further comprises: creating a first action time attribute for the first action resource, wherein the first action time attribute is used to indicate a time parameter related to the first action. 6. The creation method according to claim 1 , wherein creating the first action resource further comprises: creating a first action time attribute for the first action resource, wherein the first action time attribute is used to indicate a time parameter related to the first action. 7. The creation method according to claim 5 , wherein the time parameter related to the first action comprises at least one selected from a group consisting of a duration after the first action is executed, start time of executing the first action, and end time of executing the first action. 8. An execution method of an action, comprising: determining a first action resource, wherein the first action resource is a resource used for triggering a first action for a target resource, the first action resource comprises a first conflict priority attribute, and the first conflict priority attribute represents a priority of the first action resource relative to an action resource that conflicts with the first action resource and is aimed at the target resource; receiving a first data resource; determining a second action resource, conflicting with the first action resource, based on the first data resource meeting a first triggering condition, wherein the second action resource is a resource used for triggering a second action for the target resource, the second action resource comprises a second conflict priority attribute and a second conflict priority effective time attribute, the second conflict priority attribute represents a priority of the second action resource relative to an action resource that conflicts with the second action resource and is aimed at the target resource, and the second conflict priority effective time attribute represents a time range in which the second action resource has exclusive access to the target resource; acquiring and judging whether an attribute value of the first conflict priority attribute, an attribute value of the second conflict priority attribute, and an attribute value of the second conflict priority effective time attribute meet a conflict judgment condition, executing the first action on the target resource if the conflict judgment condition is met; not executing the first action if the conflict judgment condition is not met. 9. The execution method according to claim 8 , wherein meeting the conflict judgment condition comprises that: the attribute value of the first conflict priority attribute has priority over the attribute value of the second conflict priority attribute; or an occupation duration of the second action resource for the target resource is greater than or equal to the attribute value of the second conflict priority effective time attribute; or the attribute value of the first conflict priority attribute has priority over the attribute value of the second conflict priority attribute, and the occupation duration of the second action resource for the target resource is greater than or equal to the attribute value of the second conflict priority effective time attribute. 10. The execution method according to claim 9 , wherein judging whether the attribute value of the first conflict priority attribute, the attribute value of the second conflict priority attribute, and the attribute value of the second conflict priority effective time attribute meet the conflict judgment condition comprises: judging whether the attribute value of the first conflict priority attribute has priority over the attribute value of the second conflict priority attribute, and in a case where the attribute value of the first conflict priority attribute has priority over the attribute value of the second conflict priority attribute, determining that the conflict judgment condition is met; and in a case where the attribute value of the first conflict priority attribute does not have priority over the attribute value of the second conflict priority attribute, acquiring the occupation duration of the second action resource for the target resource, and judging whether the occupation duration of the second action resource for the target resource is greater than the attribute value of the second conflict priority effective time attribute, in a case where the occupation duration of the second action resource for the target resource is greater than or equal to the attribute value of the second conflict priority effective time attribute, determining that the conflict judgment condition is met; and in a case where the occupation duration of the second action resource for the target resource is less than the attribute value of the second conflict priority effective time attribute, determining that the conflict judgment condition is not met. 11. The execution method according to claim 10 , wherein the second action resource further comprises a second action time attribute, acquiring the occupation duration of the second action resource for the target resourc

Assignees

Inventors

Classifications

  • H04L67/12Primary

    specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks · CPC title

  • H04L47/762Primary

    triggered by the network · CPC title

  • H04L67/62Primary

    Establishing a time schedule for servicing the requests · CPC title

  • Aggregation of resource allocation or reservation requests · CPC title

  • Real time traffic · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12143307B2 cover?
A creation method for creating an action resource, an execution method of an action, an electronic device, and a storage medium are provided. The creation method includes receiving a first creation request that includes a target resource; creating a first action resource, which is a resource used for triggering a first action for the target resource, according to the first creation request; cre…
Who is the assignee on this patent?
Boe Technology Group Co Ltd
What technology area does this patent fall under?
Primary CPC classification H04L67/12. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Nov 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).