Homogenizer, rock drilling rig and method of sampling

US12139979B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12139979-B2
Application numberUS-202318216291-A
CountryUS
Kind codeB2
Filing dateJun 29, 2023
Priority dateJul 1, 2022
Publication dateNov 12, 2024
Grant dateNov 12, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A homogenizer for homogenizing flow, a rock drilling rig, and a method for taking samples is provided. The homogenizer is mountable to a dust collecting system of the rock drilling rig and is arranged for effecting on the flow, which contains air and drilling cuttings. The homogenizer includes a channel part through which the flow is directed and at least one air jet for directing air blows to the flow for generating disturbance in the flow and to thereby homogenize particle distribution of the drilling cuttings in the flow.

First claim

Opening claim text (preview).

The invention claimed is: 1. A rock drilling rig comprising: a movable carrier; at least one drilling boom mounted on the carrier and including a rock drilling unit provided with a rock drilling machine; a dust collecting system arranged for removing drilling cuttings from an opening of a drilled hole, wherein the dust collecting system is provided with a suction unit, dust collecting tubing, and at least one separator for separating solid particles from flow containing air and the drilling cuttings; at least one sampling point for taking samples of the flow, wherein the sampling point is located prior to the separator so that the flow is still unseparated at the sampling point; and a homogenizer in the dust collecting system preceding the sampling point, the homogenizer including a channel part through which the flow is directed; and at least one air jet arranged on an inner surface of the channel part arranged for directing air blows to the flow for generating a disturbance in the flow and to thereby homogenize particle distribution of the drilling cuttings in the flow. 2. The rock drilling rig as claimed in claim 1 , wherein the channel part includes a bend and the at least one air jet is located at the bend. 3. The rock drilling rig as claimed in claim 1 , wherein the channel part includes a bend with an inner curve and an outer curve, and wherein the at least one air jet is provided on the outer curve of the bend. 4. The rock drilling rig as claimed in claim 1 , wherein the at least one air jet comprises several air jets in transverse cross-section of the channel part, whereby the several air jets are orientated in different radial directions relative to each other. 5. The rock drilling rig as claimed in claim 1 , wherein the magnitudes of the air blows of the at least one air jet is controllable under control of a control unit. 6. The rock drilling rig as claimed in claim 1 , further comprising at least one compressor arranged for generating pneumatic pressure to a pneumatic system and wherein the homogenizer is connected to the pneumatic system and is controllable by at least one control valve. 7. A method of sampling in a rock drilling rig, wherein the method comprises: drilling drill holes in a rock surface; collecting produced drilling cuttings from an opening of the drill holes during the drilling by means of a dust collecting system; taking samples of flow containing air and drilling cuttings at a sampling point of the dust collecting system during the drilling; providing the dust collecting system with a homogenizer before the sampling point; directing transverse air blows to the flow and thereby spreading drilling cutting particles in the flow to even out particle distribution of the flow; and taking the samples downstream the mentioned particle spreading. 8. The method as claimed in claim 7 , comprising controlling the spreading of the solid particles in the flow by directing several air blows in different transverse directions towards the flow. 9. The method as claimed in claim 7 , comprising providing the at least one air jet with continuous air flow during the selectively controlled spreading measures of the solid particles. 10. The method as claimed in claim 7 , comprising directing pressure air pulses or impacts to the flow when executing the spreading of the solid particles.

Assignees

Inventors

Classifications

  • for treating dust-laden gaseous fluids · CPC title

  • E21B7/025Primary

    Rock drills, i.e. jumbo drills · CPC title

  • Equipment associated with mining machines for sucking dust-laden air from the cutting area, with or without cleaning of the air · CPC title

  • Dust eliminating or dust removing while drilling · CPC title

  • E21B21/015Primary

    Means engaging the bore entrance, e.g. hoods for collecting dust · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12139979B2 cover?
A homogenizer for homogenizing flow, a rock drilling rig, and a method for taking samples is provided. The homogenizer is mountable to a dust collecting system of the rock drilling rig and is arranged for effecting on the flow, which contains air and drilling cuttings. The homogenizer includes a channel part through which the flow is directed and at least one air jet for directing air blows to …
Who is the assignee on this patent?
Sandvik Mining & Construction Oy
What technology area does this patent fall under?
Primary CPC classification E21B7/025. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Nov 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).