Selective grounding of grid parallel inverter systems

US12136752B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12136752-B2
Application numberUS-202217586259-A
CountryUS
Kind codeB2
Filing dateJan 27, 2022
Priority dateJan 24, 2018
Publication dateNov 5, 2024
Grant dateNov 5, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load includes detecting if the first electrical output of the power generator is electrically disconnected from the utility grid, and electrically connecting at least a neutral line of the first electrical output to ground in response to detecting that the first output is electrically disconnected from the utility grid.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load, comprising: detecting if the first electrical output of the power generator is electrically disconnected from the utility grid; and electrically connecting at least a neutral line of the first electrical output to ground in response to detecting that the first output is electrically disconnected from the utility grid wherein: the power generator comprises a direct current (DC) fuel cell power generator; the fuel cell power generator comprises a plurality of fuel cell modules, a plurality of input outputs modules containing a respective DC/AC inverter, and an electrical distribution module; a first electrical output of the of each of the plurality of the fuel cell modules is electrically connected to a respective one of the plurality of input output modules; the plurality of input output modules are electrically connected to the utility grid via the electrical distribution module, a utility grid transformer and a circuit breaker; further comprising: at least one first switch comprising a switch located in the electrical distribution module or a plurality of switches are located in the respective input output modules, wherein the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker and to electrically connect at least the neutral line to the ground via a ground line containing a ground line switch in response to detecting that at least one of the electrical distribution module or the plurality of input output modules are electrically disconnected from the utility grid transformer by the circuit breaker; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker, and closing the ground line switch from a normally open position to electrically connect at least the neutral line to the ground via the ground line; wherein: the at least one first switch comprises a relay containing a primary contactor, an auxiliary contactor and a detector; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker comprises detecting a current or voltage through the auxiliary contactor using the detector. 2. A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load, comprising: detecting if the first electrical output of the power generator is electrically disconnected from the utility grid; and electrically connecting at least a neutral line of the first electrical output to ground in response to detecting that the first output is electrically disconnected from the utility grid wherein: the power generator comprises a direct current (DC) fuel cell power generator; the fuel cell power generator comprises a plurality of fuel cell modules, a plurality of input outputs modules containing a respective DC/AC inverter, and an electrical distribution module; a first electrical output of the of each of the plurality of the fuel cell modules is electrically connected to a respective one of the plurality of input output modules; the plurality of input output modules are electrically connected to the utility grid via the electrical distribution module, a utility grid transformer and a circuit breaker; further comprising: at least one first switch comprising a switch located in the electrical distribution module or a plurality of switches are located in the respective input output modules, wherein the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker and to electrically connect at least the neutral line to the ground via a ground line containing a ground line switch in response to detecting that at least one of the electrical distribution module or the plurality of input output modules are electrically disconnected from the utility grid transformer by the circuit breaker; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker, and closing the ground line switch from a normally open position to electrically connect at least the neutral line to the ground via the ground line; wherein: the at least one first switch comprises a relay; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker comprises sending an electrical test signal between the electrical distribution module and the plurality of input output modules and detecting that the at least one first switch is switched when the electrical test signal is disrupted. 3. A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load, comprising: detecting if the first electrical output of the power generator is electrically disconnected from the utility grid; and electrically connecting at least a neutral line of the first electrical output to ground in response to detecting that the first output is electrically disconnected from the utility grid wherein: the power generator comprises a direct current (DC) fuel cell power generator; the fuel cell power generator comprises a plurality of fuel cell modules, a plurality of input outputs modules containing a respective DC/AC inverter, and an electrical distribution module; a first electrical output of the of each of the plurality of the fuel cell modules is electrically connected to a respective one of the plurality of input output modules; the plurality of input output modules are electrically connected to the utility grid via the electrical distribution module, a utility grid transformer and a circuit breaker; further comprising: at least one first switch comprising a switch located in the electrical distribution module or a plurality of switches are located in the respective input output modules, wherein the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker and to electrically connect at least the neutral line to the ground via a ground line containing a ground line switch in response to detecting that at least one of the electrical distribution module or the plurality of input output modules are electrically disconnected from the utility grid transformer by the circuit breaker; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker, and closing the ground line switch from a normally open position to electrically connect at least the neutral line to the ground via the ground line; wherein: the at least one first switch comprises a relay; and detecting that the at least one first switch is switched to electrically disconnect at least the neutral line from the circuit breaker comprises measuring a change in resistance between the ground line and a point in the neutral line located between the circuit breaker and the at least one switch. 4. The method of claim 1 , wherein a second electrical output of each of the plurality of the fuel cell modules is electrically connected to the load via an uninterruptible power module containing a second DC/AC inverter or via an auxiliary output module containing a DC/DC converter and a DC output. 5. The method of claim 1 , wherein the first electrical output of the power generator is connected by the at least one switch to the local ground of the power gen

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12136752B2 cover?
A method of operating a power generator having a first electrical output electrically connected to a utility grid and a second electrical output electrically connected to a load includes detecting if the first electrical output of the power generator is electrically disconnected from the utility grid, and electrically connecting at least a neutral line of the first electrical output to ground i…
Who is the assignee on this patent?
Bloom Energy Corp
What technology area does this patent fall under?
Primary CPC classification H01M8/04537. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Nov 05 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 7 related publications on this page (citations in our corpus or others sharing the same primary CPC).