Networking apparatus for providing electrical power over wired data telecommunications networks, and related network comprising such an apparatus
US-2024201765-A1 · Jun 20, 2024 · US
US12107641B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12107641-B2 |
| Application number | US-202117459153-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 27, 2021 |
| Priority date | Sep 3, 2020 |
| Publication date | Oct 1, 2024 |
| Grant date | Oct 1, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An Ethernet power sourcing equipment (PSE) and a power management method thereof are provided. The Ethernet PSE includes a plurality of ports and a controller. Each port is coupled to a powered device (PD), to supply power to the PD through the port when the PD is in a power supply stage. When the PD enters a startup stage before the power supply stage, the controller calculates a remaining power quota based on a power quota allocated to the PD.
Opening claim text (preview).
What is claimed is: 1. An apparatus comprising: a plurality of ports, wherein each port is configured for coupling to a powered device (PD) for supplying power to the PD through the port when the PD is in a power supply stage; and a controller configured to calculate a remaining power quota based on a power quota allocated to the PD when the PD enters a startup stage before the power supply stage; wherein the controller adds the power quotas of the PDs in the startup stage at a time point to obtain a first sum, adds a plurality of measured power consumptions of the PDs in the power supply stage at the same time point to obtain a second sum, and subtracts the first sum and the second sum from a total power of the apparatus to obtain the remaining power quota. 2. The apparatus according to claim 1 , wherein when the PD is in the power supply stage, the controller calculates the remaining power quota based on the measured power consumption of the PD. 3. The apparatus according to claim 2 , wherein a variation amplitude of the measured power consumption of each PD in the startup stage is greater than a variation amplitude of the measured power consumption of the PD in the power supply stage. 4. The apparatus according to claim 2 , wherein the measured power consumption is an average power consumption measured in a time window. 5. The apparatus according to claim 2 , wherein the measured power consumption of each PD does not exceed the power quota allocated to the PD. 6. The apparatus according to claim 1 , wherein when the PD is in a grading stage, the controller detects a power level of the PD, to determine the power quota allocated to the PD according to the power level. 7. The apparatus according to claim 1 , wherein the time point is a time point at which the controller evaluates whether to allow the PD to be powered to enter the startup stage. 8. The apparatus according to claim 7 , wherein when a requested power of the PD to be powered is less than the remaining power quota obtained through calculation, the controller allows the PD to be powered to enter the startup stage. 9. The apparatus according to claim 1 , wherein the controller determines a duration of the startup stage according to a requested power supply rate of each PD and an overload tolerance of the apparatus. 10. A power management method of an Ethernet power sourcing equipment (PSE), comprising: supplying power to a powered device (PD) when the PD is in a power supply stage; and calculating a remaining power quota based on a power quota allocated to the PD when the PD enters a startup stage before the power supply stage; wherein the Ethernet PSE is coupled to a plurality of PDs, and the step of calculating the remaining power quota based on the power quota allocated to the PD when the PD enters the startup stage before the power supply stage in the power management method further comprises: adding the power quotas of the PDs in the startup stage at a time point to obtain a first sum; adding a plurality of measured power consumptions of the PDs in the power supply stage at the same time point to obtain a second sum; and subtracting the first sum and the second sum from a total power of the Ethernet PSE to obtain the remaining power quota. 11. The power management method of the Ethernet PSE according to claim 10 , further comprising: calculating the remaining power quota based on the measured power consumption of the PD when the PD is in the power supply stage. 12. The power management method of the Ethernet PSE according to claim 11 , wherein a variation amplitude of the measured power consumption of the PD in the startup stage is greater than a variation amplitude of the measured power consumption of the PD in the power supply stage. 13. The power management method of the Ethernet PSE according to claim 11 , wherein the measured power consumption is an average power consumption measured in a time window. 14. The power management method of the Ethernet PSE according to claim 11 , wherein the measured power consumption of the PD does not exceed the power quota allocated to the PD. 15. The power management method of the Ethernet PSE according to claim 10 , further comprising: detecting a power level of the PD when the PD is in a grading stage, and determining the power quota allocated to the PD according to the power level. 16. The power management method of the Ethernet PSE according to claim 10 , wherein the time point is a time point at which whether to allow the PD to be powered to enter the startup stage is evaluated. 17. The power management method of the Ethernet PSE according to claim 16 , further comprising: allowing the PD to be powered to enter the startup stage when a requested power of the PD to be powered is less than the remaining power quota obtained through calculation. 18. The power management method of the Ethernet PSE according to claim 10 , further comprising: determining a duration of the startup stage according to a requested power supply rate of the PD and an overload tolerance of the Ethernet PSE.
Related publications grouped by family.
Answers are generated from the same data shown on this page.